American Power Conversion PD150L6F manual Alarms Screen, New Logged Items, Entire Log, Clear Log

Page 30

Alarms Screen

View Active Alarms

Use this option of the Alarms screen to display active alarms (alarms that have not been resolved). Scroll through the list to view each active alarm.

Alarm/Event Log

Use this option of the Alarms screen to access the following options:

New Logged Items

Display a description and the date and time of each alarm that

 

occurred since the last time this option was used. The date/time

 

format is mm/dd/yyyy hh:mm:ss.

 

The most recent alarm is displayed initially.

 

If the log contains no alarms, the screen displays No New

 

 

Logged Items.

Entire Log

Display a description and the date and time of each alarm in the

 

alarm log. The date/time format is mm/dd/ yyyy hh:mm:ss.

 

The most recent alarm is displayed initially. To move to the

 

 

previous alarm, press the Up arrow key. To move to the next

 

 

more recent alarm, press the Down arrow key.

 

If the log contains no alarms, the screen displays No New

 

 

Logged Items.

Clear Log

Delete the contents of the alarm log. You will be asked to confirm

 

this deletion.

22

150kW InfraStruXure PDU—Operation and Configuration

Image 30
Contents 150kW InfraStruXure PDU Page About this Manual Page Contents Operation Customizing and Updating the PDU Product Information Safety symbols used in this manual Cross-reference symbols used in this manualOverview Installation/maintenance Receiving/movingTotal power off procedure Emergency Power Off EPOEMI Overview InfraStruXure PDU ComponentsInfraStruXure PDU Front viewFront view interior Rear view Rear view interior PDU monitoring unit Left = 43..83 lower right = User connection plate PDU Display Interface Top-level status screens Top-level menu screenNavigating through screens Password-protected screens Power Factor Load-Meter ScreenVolt-Meter Screen Open or Closed Contacts ScreenInput Contacts Relay OutputsAlarm Relay Map How to connect contacts to the PDU monitoring unit Breakers Screen Main InputEntire Log Alarms ScreenNew Logged Items Clear LogLoading Limits Global AlarmConfig Voltage LimitsPDU Alarms Alarm Condition ExplanationPanel Screen Branch Ckt LoadingBranch Ckt Limits Panel Configuration Circuit breakers occupying positions 08, 10, and 12 onTop right distribution panel Global Panel Config Beeper Volume Select High , Medium , Low , or Off to adjust Config ScreenSystem Password Date/TimeOutput Config Electrical ConfigInput Config Manufacturer DataFactory Defaults Firmware UpdatesSystem ID How to Apply Power to the System OperationOperation How to Apply Power to the System How to Ensure Total Power Off Page InfraStruXure Manager InfraStruXure PDU Management OptionsOverview Network management interfacesConfiguring the InfraStruXure Manager Connect the InfraStruXure PDU to the InfraStruXure ManagerConfiguring the Network Management Interface Configuration OverviewConnect the InfraStruXure PDU to your network TCP/IP configuration methods Device IP Configuration WizardBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where 150kW InfraStruXure PDU-Operation and Configuration Local access to the control console Use apc for the User Name and PasswordRemote access to the control console Use apc for both User Name and Password Control consoleChoose Network from the Control Console menu Web interface Snmp FTP and SCP 150kW InfraStruXure PDU-Operation and Configuration Page Important Safety Instructions Customizing and Updating the PDUPDU Orderable Part List BreakersCustomizing and Updating the PDU How to Add Circuit Breakers and Power Cables Add a power cable to the PDUAdd a circuit breaker on the PDU Customizing and Updating the PDU Overview How to attach the circuit breaker to the mounting brackets How to connect the sub-feed cable to the circuit breaker ATS 0 ATS 1 ATS Atsen How to connect contacts to the PDU monitoring unit How to Connect an EPO Switch to the PDU and Test the Switch Contact closure 24VAC 24VDC Contact closure is recommendedContact Closure-Normally Open Contact Closure-Normally Closed24VAC/VDC-Normally Open Problem Action Safety warnings How to Download Firmware Updates From a local computerPage Specifications 150kW InfraStruXure PDUPhysical PD150G6F PD150L6F Warranty InfraStruXure Standard WarrantyProduct Information Warranty APC Three-Phase Systems Life-Support PolicyHow to Obtain Service How to contact APCIndex SSH Page Page Page 990-1984