American Power Conversion PD150G6F Loading Limits, Voltage Limits, Other Limits, Global Alarm

Page 31

PDU Display Interface: Alarms Screen

Alarm Setup

Use this option of the Alarms screen to access the following options:

Loading Limits

Configure the following in amps and as a percentage of full load:

 

Out High: The upper limit for output current

 

Out Low: The lower limit for output current

 

Out Neut: The upper limit for current on the neutral wire for

 

 

the output phases

Voltage Limits

Configure the following as a percentage under or over the rated

 

voltage:

 

Input: The allowed range for input voltage

 

Output: The allowed range for output voltage

Other Limits

Configure these limits:

 

Frequency: The frequency variation, in hertz, that is acceptable

 

 

for the output current.

 

Gnd Current: The ground current, in amps, that is acceptable.

Global Alarm

Set all the loading limits or all the voltage limits simultaneously as a

Config

percentage of full load:

 

Load Limits: Set the same percentage for the upper limit for

 

 

output current, the lower limit for output current, and the upper

 

 

limit for current on the neutral wire for the output phases. (Use

 

 

the Loading Limits option to set these thresholds individually).

Volt Limits: Set the same percentage for the high and low thresholds for input and output voltage. (Use the Voltage Limits option to set these thresholds individually.)

Select Apply Now and then YES to implement your changes.

If an alarm limit has been disabled, “OFF” is displayed.

Note

Alarm Beeper

Use this option of the Alarms screen to turn the alarm beeper ON or OFF.

150kW InfraStruXure PDU—Operation and Configuration

23

Image 31
Contents 150kW InfraStruXure PDU Page About this Manual Page Contents Operation Customizing and Updating the PDU Product Information Cross-reference symbols used in this manual Safety symbols used in this manualOverview Receiving/moving Installation/maintenanceEmergency Power Off EPO Total power off procedureEMI InfraStruXure PDU Components OverviewFront view InfraStruXure PDUFront view interior Rear view Rear view interior PDU monitoring unit Left = 43..83 lower right = User connection plate PDU Display Interface Top-level menu screen Top-level status screensNavigating through screens Password-protected screens Load-Meter Screen Power FactorVolt-Meter Screen Relay Outputs Contacts ScreenInput Contacts Open or ClosedAlarm Relay Map How to connect contacts to the PDU monitoring unit Main Input Breakers ScreenClear Log Alarms ScreenNew Logged Items Entire LogVoltage Limits Global AlarmConfig Loading LimitsAlarm Condition Explanation PDU AlarmsBranch Ckt Loading Panel ScreenBranch Ckt Limits Circuit breakers occupying positions 08, 10, and 12 on Panel ConfigurationTop right distribution panel Global Panel Config Date/Time Config ScreenSystem Password Beeper Volume Select High , Medium , Low , or Off to adjustManufacturer Data Electrical ConfigInput Config Output ConfigFirmware Updates Factory DefaultsSystem ID Operation How to Apply Power to the SystemOperation How to Apply Power to the System How to Ensure Total Power Off Page Network management interfaces InfraStruXure PDU Management OptionsOverview InfraStruXure ManagerConnect the InfraStruXure PDU to the InfraStruXure Manager Configuring the InfraStruXure ManagerConfiguration Overview Configuring the Network Management InterfaceConnect the InfraStruXure PDU to your network Device IP Configuration Wizard TCP/IP configuration methodsBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where 150kW InfraStruXure PDU-Operation and Configuration Use apc for the User Name and Password Local access to the control consoleRemote access to the control console Control console Use apc for both User Name and PasswordChoose Network from the Control Console menu Web interface Snmp FTP and SCP 150kW InfraStruXure PDU-Operation and Configuration Page Customizing and Updating the PDU Important Safety InstructionsBreakers PDU Orderable Part ListCustomizing and Updating the PDU Add a power cable to the PDU How to Add Circuit Breakers and Power CablesAdd a circuit breaker on the PDU Customizing and Updating the PDU Overview How to attach the circuit breaker to the mounting brackets How to connect the sub-feed cable to the circuit breaker ATS 0 ATS 1 ATS Atsen How to connect contacts to the PDU monitoring unit Contact closure 24VAC 24VDC Contact closure is recommended How to Connect an EPO Switch to the PDU and Test the SwitchContact Closure-Normally Closed Contact Closure-Normally Open24VAC/VDC-Normally Open Problem Action Safety warnings From a local computer How to Download Firmware UpdatesPage 150kW InfraStruXure PDU SpecificationsPhysical PD150G6F PD150L6F InfraStruXure Standard Warranty WarrantyProduct Information Warranty Life-Support Policy APC Three-Phase SystemsHow to contact APC How to Obtain ServiceIndex SSH Page Page Page 990-1984