American Power Conversion PD150L6F, PD150G6F manual Safety warnings

Page 70

Customizing and Updating the PDU

Safety warnings

Hazardous voltage from the branch circuit must be isolated from the 24VAC, 24VDC, and contact closure. 24VAC and 24VDC are considered Class 2 circuits as defined in Article 725 of the National Electrical Code (NFPA 70) and Section 16 of the Canadian Electrical Code (C22.1).

A Class 2 circuit is a source having limited voltage and energy capacity as follows:

a.If an Inherently Limited Power Source, voltage and energy are limited to less than 30VAC, less than 30VDC, and 8A.

b.If not an Inherently Limited Power Source, voltage and energy are limited to less than 30VAC, less than 60VDC, 250VA, and the current is limited to 1000/Vmax. The fuse is limited to 5A if less than 20VAC or 20VDC, or 100/Vmaximum if less than 30VAC or 60VDC.

If you choose to use a 24VAC, 24VDC, or contact closure connection to the EPO, use one of the following UL-listed wire types:

CL2 Class 2 cable for general purpose use

CL2P Plenum cable for use in ducts, plenums, and other space used for environmental air

CL2R Riser cable for use in a vertical run shaft from floor to floor

CL2X Limited Use cable for use in dwellings and for use in a raceway

For installation in Canada, the cable should be CSA Certified, type ELC (extra-low-voltage control cable).

If you do not use a CL2 cable, route the EPO wiring in conduit that does not contain any branch circuit wiring.

62

150kW InfraStruXure PDU—Operation and Configuration

Image 70
Contents 150kW InfraStruXure PDU Page About this Manual Page Contents Operation Customizing and Updating the PDU Product Information Cross-reference symbols used in this manual Safety symbols used in this manualOverview Installation/maintenance Receiving/movingTotal power off procedure Emergency Power Off EPOEMI Overview InfraStruXure PDU ComponentsInfraStruXure PDU Front viewFront view interior Rear view Rear view interior PDU monitoring unit Left = 43..83 lower right = User connection plate PDU Display Interface Top-level menu screen Top-level status screensNavigating through screens Password-protected screens Power Factor Load-Meter ScreenVolt-Meter Screen Open or Closed Contacts ScreenInput Contacts Relay OutputsAlarm Relay Map How to connect contacts to the PDU monitoring unit Breakers Screen Main InputEntire Log Alarms ScreenNew Logged Items Clear LogLoading Limits Global AlarmConfig Voltage LimitsPDU Alarms Alarm Condition ExplanationBranch Ckt Loading Panel ScreenBranch Ckt Limits Circuit breakers occupying positions 08, 10, and 12 on Panel ConfigurationTop right distribution panel Global Panel Config Beeper Volume Select High , Medium , Low , or Off to adjust Config ScreenSystem Password Date/TimeOutput Config Electrical ConfigInput Config Manufacturer DataFirmware Updates Factory DefaultsSystem ID How to Apply Power to the System OperationOperation How to Apply Power to the System How to Ensure Total Power Off Page InfraStruXure Manager InfraStruXure PDU Management OptionsOverview Network management interfacesConfiguring the InfraStruXure Manager Connect the InfraStruXure PDU to the InfraStruXure ManagerConfiguration Overview Configuring the Network Management InterfaceConnect the InfraStruXure PDU to your network TCP/IP configuration methods Device IP Configuration WizardBootp & Dhcp configuration Option 43 = 01 04 31 41 50 43 where 150kW InfraStruXure PDU-Operation and Configuration Use apc for the User Name and Password Local access to the control consoleRemote access to the control console Control console Use apc for both User Name and PasswordChoose Network from the Control Console menu Web interface Snmp FTP and SCP 150kW InfraStruXure PDU-Operation and Configuration Page Important Safety Instructions Customizing and Updating the PDUPDU Orderable Part List BreakersCustomizing and Updating the PDU Add a power cable to the PDU How to Add Circuit Breakers and Power CablesAdd a circuit breaker on the PDU Customizing and Updating the PDU Overview How to attach the circuit breaker to the mounting brackets How to connect the sub-feed cable to the circuit breaker ATS 0 ATS 1 ATS Atsen How to connect contacts to the PDU monitoring unit How to Connect an EPO Switch to the PDU and Test the Switch Contact closure 24VAC 24VDC Contact closure is recommendedContact Closure-Normally Closed Contact Closure-Normally Open24VAC/VDC-Normally Open Problem Action Safety warnings How to Download Firmware Updates From a local computerPage Specifications 150kW InfraStruXure PDUPhysical PD150G6F PD150L6F Warranty InfraStruXure Standard WarrantyProduct Information Warranty APC Three-Phase Systems Life-Support PolicyHow to Obtain Service How to contact APCIndex SSH Page Page Page 990-1984