American Power Conversion
PD150G6F, PD150L6F
manual
Specification
Install
Alarm Relay Map
Password
Factory Defaults
Warranty
Config
Problem Action
Total power off procedure
APC Three-Phase Systems
Page 81
Page 80
Page 82
Image 81
Page 80
Page 82
Contents
150kW InfraStruXure PDU
Page
About this Manual
Page
Contents
Operation
Customizing and Updating the PDU
Product Information
Safety symbols used in this manual
Cross-reference symbols used in this manual
Overview
Receiving/moving
Installation/maintenance
Emergency Power Off EPO
Total power off procedure
EMI
InfraStruXure PDU Components
Overview
Front view
InfraStruXure PDU
Front view interior
Rear view
Rear view interior
PDU monitoring unit
Left = 43..83 lower right =
User connection plate
PDU Display Interface
Top-level status screens
Top-level menu screen
Navigating through screens
Password-protected screens
Load-Meter Screen
Power Factor
Volt-Meter Screen
Input Contacts
Contacts Screen
Open or Closed
Relay Outputs
Alarm Relay Map
How to connect contacts to the PDU monitoring unit
Main Input
Breakers Screen
New Logged Items
Alarms Screen
Entire Log
Clear Log
Config
Global Alarm
Loading Limits
Voltage Limits
Alarm Condition Explanation
PDU Alarms
Panel Screen
Branch Ckt Loading
Branch Ckt Limits
Panel Configuration
Circuit breakers occupying positions 08, 10, and 12 on
Top right distribution panel
Global Panel Config
System Password
Config Screen
Beeper Volume Select High , Medium , Low , or Off to adjust
Date/Time
Input Config
Electrical Config
Output Config
Manufacturer Data
Factory Defaults
Firmware Updates
System ID
Operation
How to Apply Power to the System
Operation How to Apply Power to the System
How to Ensure Total Power Off
Page
Overview
InfraStruXure PDU Management Options
InfraStruXure Manager
Network management interfaces
Connect the InfraStruXure PDU to the InfraStruXure Manager
Configuring the InfraStruXure Manager
Configuring the Network Management Interface
Configuration Overview
Connect the InfraStruXure PDU to your network
Device IP Configuration Wizard
TCP/IP configuration methods
Bootp & Dhcp configuration
Option 43 = 01 04 31 41 50 43 where
150kW InfraStruXure PDU-Operation and Configuration
Local access to the control console
Use apc for the User Name and Password
Remote access to the control console
Use apc for both User Name and Password
Control console
Choose Network from the Control Console menu
Web interface
Snmp
FTP and SCP
150kW InfraStruXure PDU-Operation and Configuration
Page
Customizing and Updating the PDU
Important Safety Instructions
Breakers
PDU Orderable Part List
Customizing and Updating the PDU
How to Add Circuit Breakers and Power Cables
Add a power cable to the PDU
Add a circuit breaker on the PDU
Customizing and Updating the PDU
Overview
How to attach the circuit breaker to the mounting brackets
How to connect the sub-feed cable to the circuit breaker
ATS 0 ATS 1 ATS Atsen
How to connect contacts to the PDU monitoring unit
Contact closure 24VAC 24VDC Contact closure is recommended
How to Connect an EPO Switch to the PDU and Test the Switch
Contact Closure-Normally Open
Contact Closure-Normally Closed
24VAC/VDC-Normally Open
Problem Action
Safety warnings
From a local computer
How to Download Firmware Updates
Page
150kW InfraStruXure PDU
Specifications
Physical PD150G6F PD150L6F
InfraStruXure Standard Warranty
Warranty
Product Information Warranty
Life-Support Policy
APC Three-Phase Systems
How to contact APC
How to Obtain Service
Index
SSH
Page
Page
Page
990-1984
Related pages
What information is available in the eMachines G630 BIOS information screen?
Learn more
(#)
Top
Page
Image
Contents