Powering On and Connecting Equipment
1.Power on the S10/S15 unit.
2.Connect the equipment.
3.Connect the data line cables.
4.Power on the connected equipment.
Performing the System Test
Before connecting equipment to the S10 or S15 Power Conditioner with Battery Backup, ensure that the unit is functional by connecting the AC Power Cord (provided) at the rear panel. Press the front panel power switch. Once power is applied to the unit, the display provides the information screens shown in Figures 7 through 15, and defined as follows:
APC - LEGENDARY RELIABILITY screen — this screen, shown in Figure 7, indicates that the unit has power and is functioning.
Figure 7. APC - LEGENDARY RELIABILITY Screen
Model Identification screen – the message displayed in Figure 8 indicates that the proper firmware was installed for the model purchased.