Installation (cont.)

Connections between ACPZ boards (frequency converters or parallel UPSs with SSC)

these connections are made through the special cables supplied;

these connections only concern installations with a Static Switch Cubicle and should be made in addition to the connections between rectifier- inverter cubicles described previously;

the ribbon cable from connector XM133 of the ACPZ board of one rectifier-inverter cubicle is connected to one of the connectors XM127 to XM132 of the ACPZ board of the Static Switch Cubicle.

Important:

Outside the cubicles, group the APOZ inter-board and ACPZ inter-board connections with the inter-cubicle auxiliary connections, and separate this assembly from the power cables.

Connections between each rectifier-inverter cubicle and the Static Switch Cubicle (example of 3 parallel UPS rectifier-inverters with SSC)

ACPZ board

 

rectifier-inverter 3

 

 

ribbon cable

 

supplied

XM133

 

ACPZ board

 

rectifier-inverter 2

 

 

ribbon cable

 

supplied

XM133

 

 

ACPZ board

ACPZ board

of the static

rectifier-inverter 1

switch cubicle

 

ribbon cable

 

supplied

XM133

XM XM XM XM XM XM

 

127 128 129 130 131 132

Fig. 18

Connections between MISI boards (modular UPSs)

See figures 19 to 21.

these connections are made using the special cables (A) supplied;

connectors XM5, XM6 and XM7 on the MISI board are used to transmit signals;

connectors XM10, XM11 and XM12 on the MISI board are used to receive signals;

connector XM5 is associated with connector XM10 for communication with a second UPS unit; similarly, XM6 is associated with connector XM11 for communication with a third UPS unit and XM7 is associated with connector XM12 for communication with a forth UPS unit;

situation with two modular UPS units: see figure 19;

situation with three modular UPS units: see figure 20;

situation with four modular UPS units: see figure 21.

 

 

MISI

 

 

board

 

XM12

UPS 1

 

 

 

XM7

 

 

XM11

 

 

XM6

 

 

XM10

 

 

XM5

 

 

 

MISI

A

 

board

XM12

UPS 2

 

 

 

XM7

 

 

XM11

 

 

XM6

 

 

XM10

 

 

XM5

 

Fig. 19

A

 

MISI

 

board

 

XM12

UPS 1

XM7

XM11

 

 

 

XM6

XM10

 

 

 

XM5

 

 

 

 

MISI

 

 

board

 

XM12

UPS 2

XM7

XM11

 

 

 

XM6

XM10

 

 

 

XM5

 

 

 

 

MISI

 

 

board

 

XM12

UPS 3

XM7

XM11

 

 

 

XM6

XM10

 

 

 

XM5

 

 

Fig. 20

Page 28 - 6739381EN/JD

Image 28
Contents Mgetm GalaxyTM 2 6739381EN/JD Contents Characteristics Characteristics common to all cubiclesStatic Switch cubicles External maintenance bypass cubiclesRectifier-inverter cubicles Pack Advance cubiclesElectrical parameters for selecting protective devices Electrical parameters for MainsRemark Electrical parameters for Mains 2Electrical parameters for determining cable cross-sections Heat lossesInstallation with parallel frequency converters Installation with parallel UPSs with a centralised SSCNumber Total UPS Line current Mm2 KVA Inverters Amps Copper AluminiumLine current Number Total UPS Mains 2 or loadKVA Inverters Amps Copper Handling Positioning the cubiclesSide clearances provided by the spacing uprights Rear FrontLayout for a single-unit UPS with one battery cubicle Floor loads figureCubicle layout on false floor or normal floor figures 6, 7 Cubicle footpads RearPower circuit wiring diagrams Connection via the topSpecial case Rectifier-inverter cubicleDiagram for a frequency converter with batteries Diagram for a frequency converter without batteriesStatic Switch Cubicle Example of a 2 parallel UPS rectifier-inverters with SSCModular UPS cubicle External maintenance bypass cubicle General Connection of power circuitsCross-section AA 160kVA to 400kVA modular UPS rectifier-inverter cubicle KVA single-unit UPS cubicles see the appendixXR2 XR5 XR3 XR6 Acpz XR4 XR7 600kVA parallel UPS cubicles see the appendixApoz 500kVA single-unit UPS rectifier-inverter cubicle 600kVA single-unit UPS cubicles see the appendixOff XR4 XR7XM7 XR2 XR5 500kVA modular UPS rectifier-inverter cubicleXR4 XR7 XM5 Air admission Mains 1, load Battery L1L2 L3 L1 L2 L3 Mains Battery LoadXR1 XR8 XM133 Q1on500/800kVA Static Switch Cubicle Front RearXR9 XR2 Q4S XR3 XR4 XR71200kVA Static Switch Cubicle Front viewXR7 XR4 UPS XR6 XR3 XR5 XR2 XR9 XR1 XR8Important note AuxiliaryTerminal Block XR1 1200kVA external maintenance bypass cubicle Key to figureConnection of auxiliary circuits on the remote relay board XR1 XR2 XR3 XR4Connection to battery circuit breaker QF1 Connections between cubiclesEmergency shutdown Connections between Apoz boardsConnections between Misi boards modular UPSs XM XM XM XM XM XM127 128 129 130 131 MisiMisi Acpz board of the Static Switch Cubicle XR8 XR9 XR5 XR6 XR7Connection of the battery Temperature Monitor optional ConnectionsTemperature Monitor installation in a APC by Schneider Electric battery cubicleTemperature Monitor installation in a battery room Installing the Temperature Monitor in a battery cubicleRauz 1 board XM098 XM097 XR11 XM096 XR10 Connector XR10 Connection of the LED remote indications unitLink to an IBM AS/400→ computer Consult manual 6739388XU for further informationFinal installation steps Configuration of the AS/400→Connection to the Media Contacts 9 relay board After making the connectionsMains 2 line protection Rated inverter output Maximum permissible current KVAUPS 250 to 450kVA UPS 500kVACubicle mounting Cubicle mounting and connection for 600kVA UPSsInternal connections between cubicles Connection of power and auxiliary circuits Left cubicle of 600kVA single-unit or parallel UPS with SSCXR2 XR5 XR3 XR6 XR4 XR7 Right cubicle of a 600kVA single-unit UPSMains Load L1 L2 L3 Air Admission Air admission Load Right cubicle of a 600kVA parallel UPS with SSCXR3 XR6 XR4 Left cubicle Right cubicleQ3BP XF1-XF2 XM1-XM2 Card cageRight cubicle of a 2000kVA Static Switch Cross-section AA Front viewAir admission Air extraction Mains OffXR6 XR3 XR5 XR2 Left cubicle of a 2000kVA Static SwitchXR9 XR1 XR8 Details of earthing connections in the various cubicles 250 to 400kVA rectifier-inverter cubicle450 500kVA rectifier-inverter cubicle Inverter input600kVA rectifier-inverter cubicle 120 to 1200kVA Static Switch CubiclesInverter Input 2000kVA Static Switch Cubicles Tele-Monitor unitConnection with Bolt, nut andmains 2 contact washer Tele Monitor unit6739381ENPage 46 --JD6739381EN/JD
Related manuals
Manual 38 pages 11.72 Kb