APC 6000 installation manual Misi

Page 29

Important

Outside the cubicles, group the cables between the MISI boards and those between the APOZ boards with the other auxiliary links between cubicles and separate all these cables from the power cables.

 

Installation (cont.)

 

 

 

MISI

 

 

 

board

 

 

XM12

UPS 1

 

XM7

XM11

 

 

 

 

 

XM6

XM10

 

 

 

 

A

XM5

 

 

 

 

 

MISI

 

 

 

board

 

 

XM12

UPS 2

 

 

 

 

XM7

XM11

 

 

 

 

 

XM6

XM10

 

 

 

 

 

XM5

 

 

 

 

 

MISI

 

 

 

board

 

 

XM12

UPS 3

 

 

 

 

XM7

XM11

 

 

 

 

 

XM6

XM10

 

 

 

 

 

XM5

 

 

 

 

 

MISI

 

 

 

board

 

 

XM12

UPS 4

 

XM7

XM11

 

 

 

 

 

XM6

XM10

 

 

 

 

 

XM5

 

 

Fig. 21

Connections between rectifier-inverter cubicles and external maintenance bypass cubicle

make connections with 1 mm2 wires (recommended size, not supplied);

connect terminals 1 and 2 on connector XM8 on the MISI board in the UPS to terminals 1 and 2 in the external maintenance bypass.

 

 

maintenance

 

 

 

Q3BP

 

Q5N

 

 

 

bypass

 

 

 

 

 

 

 

 

 

cubicle

 

 

1

2

 

 

 

 

 

 

 

 

 

 

 

Q3BP + 1

 

 

 

 

 

 

 

 

 

 

 

XM8

 

 

 

MISI 1

Q3BP - 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Q3BP + 1

 

 

 

 

 

 

 

 

XM8

 

 

 

 

MISI 2

 

Q3BP - 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MISI 3

MISI 4

6739381EN/

Image 29
Contents Mgetm GalaxyTM 2 6739381EN/JD Contents Characteristics common to all cubicles CharacteristicsExternal maintenance bypass cubicles Static Switch cubiclesRectifier-inverter cubicles Pack Advance cubiclesElectrical parameters for Mains Electrical parameters for selecting protective devicesRemark Electrical parameters for Mains 2Heat losses Electrical parameters for determining cable cross-sectionsInstallation with parallel UPSs with a centralised SSC Installation with parallel frequency convertersNumber Total UPS Line current Mm2 KVA Inverters Amps Copper AluminiumKVA Inverters Amps Copper Number Total UPS Mains 2 or loadLine current Positioning the cubicles HandlingSide clearances provided by the spacing uprights Rear FrontFloor loads figure Layout for a single-unit UPS with one battery cubicleCubicle layout on false floor or normal floor figures 6, 7 Cubicle footpads RearConnection via the top Power circuit wiring diagramsSpecial case Rectifier-inverter cubicleDiagram for a frequency converter without batteries Diagram for a frequency converter with batteriesStatic Switch Cubicle Example of a 2 parallel UPS rectifier-inverters with SSCModular UPS cubicle External maintenance bypass cubicle Cross-section AA Connection of power circuitsGeneral KVA single-unit UPS cubicles see the appendix 160kVA to 400kVA modular UPS rectifier-inverter cubicleApoz 600kVA parallel UPS cubicles see the appendixXR2 XR5 XR3 XR6 Acpz XR4 XR7 600kVA single-unit UPS cubicles see the appendix 500kVA single-unit UPS rectifier-inverter cubicleOff XR4 XR7XR4 XR7 XM5 500kVA modular UPS rectifier-inverter cubicleXM7 XR2 XR5 L1L2 L3 L1 L2 L3 Mains Battery Load Air admission Mains 1, load BatteryXR1 XR8 XM133 Q1onFront Rear 500/800kVA Static Switch CubicleXR9 XR2 Q4S XR3 XR4 XR7Front view 1200kVA Static Switch CubicleXR7 XR4 UPS XR6 XR3 XR5 XR2 XR9 XR1 XR8Auxiliary Important noteTerminal Block XR1Key to figure 1200kVA external maintenance bypass cubicle XR1 XR2 XR3 XR4 Connection of auxiliary circuits on the remote relay boardConnections between cubicles Connection to battery circuit breaker QF1Emergency shutdown Connections between Apoz boardsXM XM XM XM XM XM Connections between Misi boards modular UPSs127 128 129 130 131 MisiMisi XR8 XR9 XR5 XR6 XR7 Acpz board of the Static Switch CubicleConnections Connection of the battery Temperature Monitor optionalSchneider Electric battery cubicle Temperature Monitor installation in a APC byTemperature Monitor installation in a battery room Installing the Temperature Monitor in a battery cubicleConnection of the LED remote indications unit Rauz 1 board XM098 XM097 XR11 XM096 XR10 Connector XR10Link to an IBM AS/400→ computer Consult manual 6739388XU for further informationConfiguration of the AS/400→ Final installation stepsConnection to the Media Contacts 9 relay board After making the connectionsRated inverter output Maximum permissible current KVA Mains 2 line protectionUPS 250 to 450kVA UPS 500kVAInternal connections between cubicles Cubicle mounting and connection for 600kVA UPSsCubicle mounting Left cubicle of 600kVA single-unit or parallel UPS with SSC Connection of power and auxiliary circuitsMains Load L1 L2 L3 Air Admission Right cubicle of a 600kVA single-unit UPSXR2 XR5 XR3 XR6 XR4 XR7 XR3 XR6 XR4 Right cubicle of a 600kVA parallel UPS with SSCAir admission Load Right cubicle Left cubicleQ3BP XF1-XF2 XM1-XM2 Card cageCross-section AA Front view Right cubicle of a 2000kVA Static SwitchAir admission Air extraction Mains OffXR9 XR1 XR8 Left cubicle of a 2000kVA Static SwitchXR6 XR3 XR5 XR2 250 to 400kVA rectifier-inverter cubicle Details of earthing connections in the various cubicles450 500kVA rectifier-inverter cubicle Inverter inputInverter Input 120 to 1200kVA Static Switch Cubicles600kVA rectifier-inverter cubicle Tele-Monitor unit 2000kVA Static Switch CubiclesConnection with Bolt, nut andmains 2 contact washer Tele Monitor unit6739381ENPage 46 --JD6739381EN/JD
Related manuals
Manual 38 pages 11.72 Kb