Appendix (cont.)
Cubicle mounting and connection for 2000kVA Static Switch Cubicle
Cubicle mounting
◗move the cubicles to their operating location;
◗adjust the front foot pads so that the cubicles are vertical and their doors aligned.
Internal connections between cubicles
◗install and bolt the supplied fish- plates on the bars for the phases and neutral (L1, L2, L3, N) between the two cubicles (four bars in top and four bars in bottom);
◗connect the earth strap to the front uprights of both cubicles;
◗connect the connectors marked XM1 and XM2 from the left cubicle to the connectors marked XF1 and XF2 in the right cubicle.
left cubicle
K2S
right cubicle
|
|
| on |
|
|
|
|
|
| off |
|
|
|
|
|
| Q4S |
|
|
|
N | L1 | L2 | L3 |
|
|
|
|
|
|
|
| ||
|
|
| on |
|
|
|
|
|
| off |
|
|
|
|
|
| Q3BP |
|
|
|
|
|
| L1 |
| L3 | |
|
|
| N | L2 | ||
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
| N | L1 | L2 | L3 | card cage | |
|
|
|
|
|
|
earth strap to be connected to the front uprights of both cubicles
on |
off |
Q5N |
spacing |
uprights |
Page 40 - 6739381EN/JD