APC 6000 installation manual Air admission Mains 1, load Battery, XR1 XR8, XM133 Q1on

Page 21

Installation (cont.)

500kVA frequency converter or parallel UPS with SSC rectifier-inverter cubicle

cross-section AA

front view

 

 

 

air extraction

 

front

 

 

A

air admission

mains 1, load

battery

air admission

 

rectifier

 

inverter

inverter

inverter

 

charger

 

 

 

stack

stack

stack

additional remote

 

 

 

 

 

 

 

 

relay board (optional)

 

 

 

 

 

 

remote relay

 

 

 

 

 

 

board

 

 

 

 

 

 

card

card

 

XR1

XR8

 

 

cage

 

XR9

 

 

cage

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

XR2

XR5

 

 

XM136

"ACOZ" board

XR3

XR6

"ACPZ"

 

XM137

 

 

 

XR4

XR7

board

 

 

 

 

 

 

 

 

 

 

 

 

"FHCZ"

 

 

 

 

 

board

 

XM133

 

 

 

 

 

 

 

 

Q1on

 

 

 

 

Q5N

 

 

 

 

 

 

 

off

 

 

 

 

on

 

 

 

 

 

 

 

 

 

 

 

 

off

 

L1L2 L3

L+

L

 

 

N L1 L2 L3

 

mains 1

 

 

 

 

battery

 

 

load

connection

spacing

 

 

 

 

A

from below

 

 

 

 

 

trough (if applicable)

uprights

 

 

power cable routing

spacing

 

 

 

 

 

 

uprights

 

 

 

 

via the bottom

 

 

 

 

 

Cables connect by lugs:

mains 1:

to 50 X 10 mm copper terminals and 12,6 mm diameter holes, and gudgeon 10 mm diameter;

load:

to 50 X 8 mm copper terminals and 5 holes of 12,6 mm diameter;

battery:

to 80 X 8 mm copper terminals and 2 holes of 12,6 mm diameter.

Height of connections relative to floor:

mains 1: 450 mm ;

load: 337 mm ;

battery: 385 mm ;

remote relay board: 1030 mm.

600kVA parallel UPS cubicles (see the appendix).

6739381EN/

Image 21
Contents Mgetm GalaxyTM 2 6739381EN/JD Contents Characteristics common to all cubicles CharacteristicsExternal maintenance bypass cubicles Static Switch cubiclesRectifier-inverter cubicles Pack Advance cubiclesElectrical parameters for Mains Electrical parameters for selecting protective devicesRemark Electrical parameters for Mains 2Heat losses Electrical parameters for determining cable cross-sectionsInstallation with parallel UPSs with a centralised SSC Installation with parallel frequency convertersNumber Total UPS Line current Mm2 KVA Inverters Amps Copper AluminiumNumber Total UPS Mains 2 or load Line currentKVA Inverters Amps Copper Positioning the cubicles HandlingSide clearances provided by the spacing uprights Rear FrontFloor loads figure Layout for a single-unit UPS with one battery cubicleCubicle layout on false floor or normal floor figures 6, 7 Cubicle footpads RearConnection via the top Power circuit wiring diagramsSpecial case Rectifier-inverter cubicleDiagram for a frequency converter without batteries Diagram for a frequency converter with batteriesStatic Switch Cubicle Example of a 2 parallel UPS rectifier-inverters with SSCModular UPS cubicle External maintenance bypass cubicle Connection of power circuits GeneralCross-section AA KVA single-unit UPS cubicles see the appendix 160kVA to 400kVA modular UPS rectifier-inverter cubicle600kVA parallel UPS cubicles see the appendix XR2 XR5 XR3 XR6 Acpz XR4 XR7Apoz 600kVA single-unit UPS cubicles see the appendix 500kVA single-unit UPS rectifier-inverter cubicleOff XR4 XR7500kVA modular UPS rectifier-inverter cubicle XM7 XR2 XR5XR4 XR7 XM5 L1L2 L3 L1 L2 L3 Mains Battery Load Air admission Mains 1, load BatteryXR1 XR8 XM133 Q1onFront Rear 500/800kVA Static Switch CubicleXR9 XR2 Q4S XR3 XR4 XR7Front view 1200kVA Static Switch CubicleXR7 XR4 UPS XR6 XR3 XR5 XR2 XR9 XR1 XR8Auxiliary Important noteTerminal Block XR1Key to figure 1200kVA external maintenance bypass cubicleXR1 XR2 XR3 XR4 Connection of auxiliary circuits on the remote relay boardConnections between cubicles Connection to battery circuit breaker QF1Emergency shutdown Connections between Apoz boardsXM XM XM XM XM XM Connections between Misi boards modular UPSs127 128 129 130 131 MisiMisi XR8 XR9 XR5 XR6 XR7 Acpz board of the Static Switch CubicleConnections Connection of the battery Temperature Monitor optionalSchneider Electric battery cubicle Temperature Monitor installation in a APC byTemperature Monitor installation in a battery room Installing the Temperature Monitor in a battery cubicleConnection of the LED remote indications unit Rauz 1 board XM098 XM097 XR11 XM096 XR10 Connector XR10Link to an IBM AS/400→ computer Consult manual 6739388XU for further informationConfiguration of the AS/400→ Final installation stepsConnection to the Media Contacts 9 relay board After making the connectionsRated inverter output Maximum permissible current KVA Mains 2 line protectionUPS 250 to 450kVA UPS 500kVACubicle mounting and connection for 600kVA UPSs Cubicle mountingInternal connections between cubicles Left cubicle of 600kVA single-unit or parallel UPS with SSC Connection of power and auxiliary circuitsRight cubicle of a 600kVA single-unit UPS XR2 XR5 XR3 XR6 XR4 XR7Mains Load L1 L2 L3 Air Admission Right cubicle of a 600kVA parallel UPS with SSC Air admission LoadXR3 XR6 XR4 Right cubicle Left cubicleQ3BP XF1-XF2 XM1-XM2 Card cageCross-section AA Front view Right cubicle of a 2000kVA Static SwitchAir admission Air extraction Mains OffLeft cubicle of a 2000kVA Static Switch XR6 XR3 XR5 XR2XR9 XR1 XR8 250 to 400kVA rectifier-inverter cubicle Details of earthing connections in the various cubicles450 500kVA rectifier-inverter cubicle Inverter input120 to 1200kVA Static Switch Cubicles 600kVA rectifier-inverter cubicleInverter Input Tele-Monitor unit 2000kVA Static Switch CubiclesConnection with Bolt, nut andmains 2 contact washer Tele Monitor unit6739381ENPage 46 --JD6739381EN/JD
Related manuals
Manual 38 pages 11.72 Kb