AMX manual Installing the MVP-WDS in a CB-MVPWDS Conduit Box

Page 14

MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box

Installing the MVP-WDS in a CB-MVPWDS Conduit Box

The conduit box must be mounted prior to continuing this section. Refer to the Installing the CB-MVPWDS Conduit Box section on page 4 for detailed pre-wall installation instructions.

The faceplate must be removed prior to any surface installation (see the Removing the MVP- WDS Faceplate section on page 5).

Verify that the USB and power cables have been threaded through the knockouts on the right of the conduit box. Leave enough slack in the wiring to accommodate re-positioning of the panel.

1.Connect the 2-pin power connector and USB cables to the WDS. The WDS must be installed with these attached. The USB connectors can be from either a USB extension cable, or a wireless USB RF transmitter.

Verify that the terminal end of the power cable is not connected to a power source before plugging in the 2-pin power connector.

2.Insert the WDS into the conduit box, so that the Mounting Tabs on the WDS lie flush against the conduit box (FIG. 9).

#4-40 Mounting Screws (four - not included) secure the WDS to the Conduit Box.

#6-32 Faceplate

Security Screws (2)

Die Cut Foam covers (2)

Faceplate

CB-MVPWDS

Conduit Box

Mounting Tab

MVP-WDS (Main unit)

FIG. 9 MVP-WDS installation configuration within a CB-MVPWDS Conduit Box

3.Using a grounded Phillips-head screwdriver, insert and secure four #4-40 Mounting Screws (not included) into their corresponding holes located along the sides of the MVP-WDS until the WDS is securely fastened to the conduit box, and is flush against the wall.

4.Follow the steps outlined in the Replacing the Faceplate on the MVP-WDSsection on page 13 to re- install the faceplate.

8

MVP-WDS Wall Docking Station for MVP Panels

Image 14
Contents MVP-WDS AMX Limited Warranty and Disclaimer FCC Information Page Table of Contents Page MVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box OverviewSpecifications MVP-WDS SpecificationsMVP-WDS docking station connector locations LED IndicatorsInstallation Installing the CB-MVPWDS Conduit BoxRemoving the MVP-WDS Faceplate MVP Support CradleSecurity Latch Faceplate Securing Latches Faceplate Connectors Installing the MVP-WDS in a CB-MVPWDS Conduit Box Installing the MVP-WDS Using Expansion Clips MVP-WDS Wall Mount cutout dimensions using expansion clips Replacement drywall clip sets cab be ordered from AMX Screws not included Replacing the Faceplate on the MVP-WDS Connecting a Power SupplyPowering the MVP-WDS Using the 3.5mm mini-Phoenix Connector for Power Connecting and Using USB Input Devices on the StationsInterface Connector Pins and Functions Securing an MVP Panel to an MVP-WDSSecured MVP removal from an MVP-WDS Removing an MVP Panel from an MVP-WDSUnsecured MVP removal from an MVP-WDS Undock-USER String Installing and Charging Batteries in the Docking StationsInstalling MVP-BP Batteries Into the MVP-WDS Installing the MVP-WDS-SK Silver Conversion Kit Removing the original faceplateSecurity Latch Faceplate securing latches Gap opening Installing the new conversion kit’s pivot unit components Removing the attached circuit boards a & BInstalling the new silver faceplate Installation of silver cradle pivot and battery coverMVP-WDS Wall Docking Station & CB-MVPWDS Conduit Box Upgrading the Docking Station Firmware Prepare the Docking Station for firmware transfer via USBUpgrade the Docking Station firmware via USB Default Modero panel value isDevice and System values Upgrading the Docking Station Firmware Page It’s Your World Take Control