Cable Assembly
22.Refer to the CABLE DIAGRAMS on pages 27 and 28 as you assemble the cables and to identify the cables.
Locate the Lat Cable (71). Route the Cable up through the Right Top Frame (7) and over a 90mm Pulley (39). Make sure the Cable is between the Pulley and the rod in the Top Frame. Attach the Pulley inside the Top Frame with an M10 x 80mm Bolt (111), two M10 Washers (116), two 19mm Spacers (77), and an M 10 Nylon Locknut (114).
23.Route the Lat Cable (71) over a 90ram Pulley
(39)and down through the Right Top Frame (7).
Make sure the Cable is between the Pulley and the rod in the Top Frame. Attach the Pulley inside the Top Frame with an M10 x 80mm Bolt (111), two M10 Washers (116), two 19mm
Spacers (77), and an M10 Nylon Locknut (114).
24.Wrap the Lat Cable (71) under a 90mm Pulley (39). Attach the Pulley, a Small Cable Trap (48), and two Half Finger Guards (42) at the second hole from the top of the two Pulley Plates (51) with an M10 x 52mm Bolt (102) and an M10 Nylon Locknut (114). Make sure the Cable Trap and Finger Guards are oriented as shown.
25.Route the Lat Cable (71) up through the Right Top Frame (7) and over a 90mm Pulley (39). Make sure the Cable is between the Pulley and the rod in the Top Frame. Attach the Pulley inside the Top Frame with an M10 x 80mm Bolt (111), two M10 Washers (116), two 19mm
Spacers (77), and an M10 Nylon Locknut (114).
26.Wrap the Lat Cable (71) around a 115mm Pulley (41). Attach the Pulley and a Large Cable Trap (125) to the Right Top Frame (7) with an M10 x 110ram Bolt (73) and an M10 Nylon Locknut (114).
77 116 |
23116 39
24
71
51-
25 | _ | 71 |
7
114
73
125
114
13