S T E P 12 CABLE #6 (1/4” diameter)
NOTE: You will need to remove pulleys GG, HH, II, and JJ to route cable #6.
• Thread the bolt a minimum of 0.5” into pulley DD. Tighten nut to pulley housing. Route the cable through the specified pulleys in the following order: under GG, under HH, over II, and under JJ. Connect the ter- mination to the leg press swing arm with a bolt (M8x19) and a nut (M8). WARNING:
Failure to thread the specified d i s t a n c e c a n r e s u l t i n s e r i o u s i n j u r y !
DD
Gussett
Side View
Front View
GG
HH II JJ
22