S T E P 13 Y E L L O W B A G
AG1
| AK2 |
AK2 | Inside |
Accessory |
|
Hooks |
|
| C |
| Q02 |
| Q01 |
Accessory |
|
Posts | A |
| |
AK3 |
|
AQ2 | AK3 |
| B |
AC2
Z31
D
Z30
•Slide the slip on nuts (Z31) over the 8 holes of the 4 attachment clips (Z30). Fasten one end of the 4 attachment clips (Z30) to the inside of the right hand weight stack shield (Q01 @ A, B, C, and D) with four screws (M5x15). Loosely attach so that the clips are parallel to the floor. Butt the side of the left weight stack shield (Q02) up against the right side and align the holes with the remaining open holes of the attachment clips. Attach the shield with four screws (M5x15). Attach the outside edges of the left and right shields to the weight stack upper block (AK2) and lower block (AK3) with four bolts (M8x20). Tighten screws first, the the bolts.
•Attach the three accessory storage hooks to the outside of the center weight stack shield (AQ2) with six bolts (M5x15). Attach each of the two accessory posts to the out- side with two flat washers (10.2x22x2) first & two lock washers (10.2x18.4x2.5) second, and a bolt (M10x25). Tighten each. Attach the upper portion of the center shield to the tab on the functional arm overhead tube (AG1) with a bolt (M8x20) and the bottom to the functional arm floor support (AC2) with two bolts (M8x20).
23