24. Route the Base Cable (57) under the Rear | 24 |
|
|
|
Upright (4) and a 3 1/2” Pulley (45). Attach the |
|
|
| |
|
| 57 |
| |
Pulley to the Base (1) with an M10 x 192mm |
|
|
| |
|
| 45 |
| |
Button Bolt (64) and an M10 Nylon Locknut (62). |
|
|
| |
|
| 62 |
|
|
|
|
|
| 1 |
|
|
|
| 64 |
|
|
| 4 |
|
25. Wrap the Base Cable (57) over a 3 1/2” Pulley | 25 |
|
|
|
(45). Attach the Pulley and a Short Cable Trap |
|
|
| |
|
|
|
| |
(47) at the second set of holes from the bottom of |
|
|
|
|
the two Pulley Plates (20) with an M10 x 54mm |
|
| 20 |
|
Button Bolt (73) and an M10 Nylon Locknut (62). |
| 62 |
| |
|
|
| ||
Make sure the Cable Trap is oriented to hold |
|
|
| |
|
|
|
| |
the Cable in the groove of the Pulley. |
|
| 73 |
|
|
|
|
| |
|
|
| 45 |
|
|
|
| 47 |
|
|
|
| 57 |
|
26. Wrap the Base Cable (57) under a 3 1/2” Pulley | 26 |
| 45 |
|
(45). Attach the Pulley to the Base (1) with an |
|
| ||
|
|
| ||
|
|
|
| |
M10 x 178mm Button Bolt (78) and an M10 |
|
|
|
|
Washer (65). Note: A nylon locknut will be |
|
| 57 |
|
attached to the Bolt in step 45. |
|
|
| |
|
|
|
| 1 |
|
|
|
| 78 |
|
|
| 65 |
|
27. Wrap the Base Cable (57) under a 3 1/2” Pulley | 27 |
|
|
|
(45). Attach the Pulley to the Base (1) with an |
|
| 57 | |
|
| 45 | ||
M10 x 192mm Button Bolt (64) and an M10 Nylon |
|
| ||
| 62 |
| ||
|
|
| ||
Locknut (62). |
|
|
| |
|
|
|
| |
|
|
| 1 |
|
|
|
|
| 64 |
28. Attach the end of the Base Cable (57) to a “U”- | 28 |
|
|
|
bracket (19) with an M6 Nylon Locknut (63). Do |
|
|
| |
|
|
|
| |
not completely tighten the Locknut; it should |
| 19 |
|
|
be tightened so that only two threads of the |
|
|
| |
|
|
| 63 | |
Cable show past the Locknut, as shown in the |
| 63 |
| |
inset drawing. |
|
|
| |
|
|
|
| |
|
| 57 |
| 19 |
|
|
|
| |
|
|
|
| 57 |
12