33. Wrap the High Cable (54) over a 3 1/2” Pulley | 33 |
| |
(45). Attach the Pulley inside the Center Top |
| ||
62 | 65 | ||
Frame (2) with an M10 x 65mm Button Bolt (86), | |||
two M10 Washers (65), two 12mm Spacers (49), |
| 2 | |
and an M10 Nylon Locknut (62). |
| ||
|
|
65
86
| 49 | 49 | |
|
| ||
| 45 | 54 | |
34. Wrap the High Cable (54) under a 3 1/2” Pulley | 34 |
| |
(45). Attach the Pulley and a Short Cable Trap |
| ||
|
| ||
(47) at the top hole in the indicated |
| 54 | |
(19) with an M10 x 54mm Button Bolt (73) and an |
| ||
|
| ||
M10 Nylon Locknut (62). Make sure the Cable | 47 | 45 | |
Trap is oriented to hold the Cable in the | |||
| |||
groove of the Pulley. |
| 73 | |
|
| ||
| 62 | 19 |
35. Route the High Cable (54) up through the indicat- | 35 |
| |
ed tube on the Center Top Frame (2). Make sure |
| ||
|
| ||
the Cable is routed over the bolts in the | 86 | 65 | |
Center Top Frame in the manner shown in | |||
65 | |||
| |||
step 32. | 54 | 62 | |
| |||
Attach a 3 1/2” Pulley (45) inside the Center Top |
| 2 | |
Frame (2), under the High Cable (54), with an |
| ||
|
| ||
M10 x 65mm Button Bolt (86), two M10 Washers |
|
| |
(65), two 12mm Spacers (49), and an M10 Nylon |
| 45 | |
Locknut (62). Make sure the Cable rests in the |
| ||
|
| ||
groove of the Pulley. | 49 | 49 | |
|
36. Attach a 3 1/2” Pulley (45) to the Center Top | 36 |
|
Frame (2) with an M10 x 48mm Button Bolt (74) |
| |
Bracket |
| |
and an M10 Nylon Locknut (62). Make sure the | 74 2 | |
High Cable (54) rests in the groove of the | 54 45 | |
Pulley. |
|
|
Route the High Cable (54) through the bracket on |
|
|
the Center Top Frame (2). |
|
|
| 62 |
|
14