Maytag W10057349A manual

Page 15

2.Place the hooked end of the neutral wire (white or center wire) of direct wire cable under the center screw of terminal block (hook facing right). Squeeze hooked end together. Tighten screw.

C

A

B D

E

A. External ground conductor screw

B. Neutral ground wire

C. Center silver-colored terminal block screw

D. Neutral wire (white or center wire)

E. ¾" (1.9 cm) UL listed strain relief

3.Place the hooked ends of the other direct wire cable wires under the outer terminal block screws (hooks facing right). Squeeze hooked ends together. Tighten screws.

4.Tighten strain relief screw.

5.Insert tab of terminal block cover into slot of dryer rear panel. Secure cover with hold- down screw.

6.You have completed your electrical connection. Now go to “Venting Requirements.”

Optional 3-wire connection

Use for direct wire or power supply cord where local codes do not permit connecting cabinet-ground conductor to neutral wire.

1.Remove center silver-colored terminal block screw.

2.Remove neutral ground wire from external ground conductor screw. Connect neutral ground wire and the neutral wire (white or center wire) of power supply cord/cable under center, silver-colored terminal block screw. Tighten screw.

B

A

C

D

E

F

A. External ground conductor screw

B. Center silver-colored terminal block screw

C. Neutral ground wire

D. Neutral wire (white or center wire)

E. ¾" (1.9 cm) UL listed strain relief

F. Grounding path determined by a qualified electrician

3.Connect the other wires to outer terminal block screws. Tighten screws.

4.Tighten strain relief screws.

5.Connect a separate copper ground wire from the external ground conductor screw to an adequate ground.

6.Insert tab of terminal block cover into slot of dryer rear panel. Secure cover with hold- down screw.

15

Image 15
Contents W10057349A Sécheuse ÉlectriqueÍndice Table of ContentsYour safety and the safety of others are very important Dryer SafetyOptional Pedestal Installation InstructionsYou will need Installation clearancesDryer Dimensions Location RequirementsCloset installation Dryer only Recommended installation spacing for cabinet installationIt is your responsibility Mobile home Additional installation requirementsMobile home installations require Electrical Requirements U.S.A. OnlyIf using a power supply cord If connecting by direct wireIf your outlet looks like this Electrical Requirements Canada Only Power Supply Cord Direct Wire Style 1 Power supply cord strain reliefElectrical Connection U.S.A. Only Style 2 Direct wire strain relief Wire connection Direct wire Wire connection Power supply cord12.7 BDE CG F Page If using an existing vent system Venting RequirementsIf this is a new vent system Vent material Exhaust Optional exhaust installationsAlternate installations for close clearances Special provisions for mobile home installationsDetermine vent path Install Vent System Install Leveling LegsVent system chart Canada Complete InstallationConnect Vent U.S.ADryer USE Starting Your DryerTo use a Sensor Cycle Type of Load Time Minutes Air DryHow Sensor Cycles Work To use a Timed CycleDrying and Cycle Tips Pausing or RestartingStopping Your Dryer Control LockCycles Status IndicatorOptional Features Drying Rack Option Changing Cycles, Options and ModifiersAs needed cleaning Cleaning the Dryer LocationCleaning the Lint Screen Every load cleaningChanging the Drum Light Cleaning the Dryer InteriorRemoving Accumulated Lint Vacation and Moving CareDryer Operation TroubleshootingDryer Results Cycle time too shortLint on load Canada For further assistanceOur consultants provide assistance with This limited warranty does not cover Maytag Major Appliance WarrantyVotre sécurité et celle des autres est très importante Sécurité DE LA SécheuseInstructions Dinstallation Pièces fourniesPièces nécessaires Piédestal facultatif Exigences demplacementDimensions de la sécheuse Installation dans un placard Sécheuse seulementDégagements de séparation à respecter ’est à l’utilisateur qu’incombe la responsabilité de Espacement recommandé pour linstallation dans un placardLinstallation dans une maison mobile exige Spécifications électriquesEn cas dutilisation du système dévacuation existant Exigences concernant lévacuationBrides de serrage Conduit métallique rigideConduit métallique flexible CoudesInstallations d’évacuation facultatives Autres installations où le dégagement est réduitPlanification du système d’évacuation Tableau des systèmes dévacuation Déterminer litinéraire dacheminement du conduitInstallation des pieds de nivellement Mise à niveau de la sécheuseSi la sécheuse ne démarre pas, vérifier ce qui suit Utilisation dun programme de détection Utilisation DE LA SécheuseComment fonctionnent les programmes de détection Utilisation dun programme minutéConseils pour les programmes Verrouillage des commandesArrêt de la sécheuse Pause ou remise en marcheProgrammes Témoins lumineuxCaractéristiques supplémentaires Retouche Cycle signal signal de programmeChangement des programmes, options et Modificateurs Grille de séchageSéchage sur grille Réglage Temp Durée Chandails en laine Jouets rembourrés ou oreillersChaussures de tennis ou de toile Nettoyage de l’intérieur de la sécheuse Nettoyage de lemplacement de La sécheuseEntretien DE LA Sécheuse Nettoyage du filtre à charpieRetrait de la charpie accumulée DéménagementChangement de l’ampoule d’éclairage Du tambour Absence de chaleur La sécheuse affiche un message codé DépannageFonctionnement de la sécheuse La sécheuse ne fonctionne pasTemps de programme trop court „ La sécheuse est-elle installée dans un placard?Résultats de la sécheuse „ Le conduit dévacuation a-t-il la longueur appropriée?Nos consultants vous renseigneront sur les sujets suivants Pour plus dassistancePour plus d’assistance Nos consultants fournissent de lassistance pourLa présente garantie limitée ne couvre pas Garantie DES Gros Appareils Ménagers MaytagW10057349A