Bosch Appliances installation manual Wiring OctoPOPITs to the D9112, D8128A OctoPOPITs

Page 43

Wiring OctoPOPITs to the D9112

Follow the procedure below to wire D8128A OctoPOPIT Modules to the D9112. You can connect OctoPOPIT and POPEX modules to the same Point Buss terminals. The modules wire in parallel. Remember you can never assign the same point number to more than one point.

1.Power down first: Power down the D9112 by disconnecting the positive (red) battery lead at the battery and unplugging the transformer.

2.Connect terminal 1 on the OctoPOPIT to terminal 23 on the D9112.

3.Connect terminal 2 on the OctoPOPIT to terminal 28 on the D9112 if you are going to assign point numbers from 9 to 71 to this OctoPOPIT. See OctoPOPIT Point Assignments.

If you are assigning point numbers from 73 to 135, connect terminal 2 on the OctoPOPIT to terminal 26

on the D9112.

D9112

ZONEX OUT 1

28

SENSOR

 

 

ZONEX IN 1

27

LOOPS

 

ZONEX OUT 2

26

 

ZONEX IN 2

25

 

ZONEX POWER +

24

 

 

 

ZONEX COMMON 23

4.Connect terminal 3 on the OctoPOPIT to terminal 27 on the D9112 if you are going to assign point numbers from 9 to 71 to this OctoPOPIT.

If you are assigning point numbers from 73 to 135,

connect terminal 3 on the OctoPOPIT to terminal 25 on the D9112.

5.Connect terminal 4 on the OctoPOPIT

to terminal 24 on the D9112.

SENSOR

 

LOOPS

6.See OctoPOPIT Sensor Loops for instructions on connecting devices to the OctoPOPIT’s sensor loops.

Figure 16: D8128A OctoPOPITs

 

E N O Z

 

S

T

N

I

O

 

P

 

 

12

11

10

9

8

7

6

5

4

3

2

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N

12 11 10 9

8

7

6

5

4

3

2

1

O

 

1 TO

4

 

2 3 CONTROL

31 ZX

 

4

3

 

5

P1

 

6

COM

D8128A OCTOPOPITS

7

P2

FOR POINTS 9 - 71

8

P3

 

9

COM

CONNECT MULTIPLE

10

P4

OCTOPOPITS IN

11

P5

PARALLEL.

12

COM

CONNECT OCTOPOPITS

AND THE D8125 POPEX

13

P6

MODULE IN PARALLEL.

14

P7

 

15

COM

 

16

P8

 

 

E N O Z

 

S

T

N

I

O

 

P

 

 

12

11

10

9

8

7

6

5

4

3

2

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

N

12 11 10 9

8

7

6

5

4

3

2

1

O

 

1 TO

4

 

2 3 CONTROL

31 ZX

 

4

3

 

5

P1

 

6

COM

D8128A OCTOPOPITS

7

P2

FOR POINTS 73 - 135

8

P3

 

9

COM

CONNECT MULTIPLE

10

P4

OCTOPOPITS IN

11

P5

PARALLEL.

CONNECT OCTOPOPITS

12

COM

AND THE D8125 POPEX

13

P6

MODULE IN PARALLEL.

14

P7

 

15

COM

 

16

P8

 

 

D9112

Operation & Installation Manual

 

 

© 1993 Radionics

74-06144-000-C 2/96

Page 43

Image 43
Contents D I O N I C S Part FCC Notices74-06144-000-C 2/96 Table of Contents Standby Battery Calculation for Programmer and Accessory ConnectionsInstallation Guide for UL and Fire Applications Current Rating Chart forFigures and Tables D8128A OctoPOPIT Switch SettingsPoints IntroductionCommunicator D1255 Alpha III Command CenterKeyswitch Areas and AccountsProgramming Event MemoryEvent Log EMI/Lightning Transient ProtectionOther Features Literature Pack D9112 Control/Communicator AssemblyD9112 Assembly Ordered SeparatelyFactory Mutual FM Listings and ApprovalsFire BurglaryEnclosure Options InstallationBeginning the Installation Before You BeginPremises Wiring Connecting Earth Ground TerminalInstalling the D9112 Assembly Lock the Reset Pin Now Locking the Reset PinInstall Modules and Relays Finishing the InstallationCharge the Battery as You Finish Install and Wire Detection DevicesProgramming the Panel Install the Point Chart LabelConnect the On-Board Points and Command Centers Power UpTesting the System Installing the Transformer Power SupplyPrimary Power Terminals Primary AC Power CircuitBattery Supervision Secondary Power TerminalsSecondary DC Power Installing the BatteryDischarge Cycle Battery Charging CircuitBattery Discharge/Recharge Schedule No AC Power Float ChargeLow Battery LED Red Charging Status and Low Battery LEDsCharging Status LED Yellow Available Power Power OutputsCircuit Protection Expansion Port J4 Continuous Power Outputs TerminalsAccessory Connector J2 Continuous Current DrawOptional Relays Required Programmable Power Outputs TerminalsRelay Installation ProgrammingTerminal Available PowerVerification/Reset Relay Terminals 6Location Telephone ConnectionsRegistration NotificationDialing Format Phone Cord ConnectionPhone LED Red Operation Monitor LED GreenGround Start Relay InstallationOperation D128 Dual Phone Line SwitcherGround Start Jumper DescriptionInstalling the D128 Watchdog FeaturePrimary Phone Lines, Primary Phone Numbers Secondary Fail LED AC Power LEDD128 Status LEDs Primary Fail LEDDescription Terminals 11 to On-Board PointsPoint Sensor Loops Point Response Time Point ParametersPoint Zonex Buss Terminals 23 to Off-Board PointsD8125 Popex Module D8127 Popit Modules Mounting Installing the D8125 Popex ModuleWiring the D8125 to the D9112 Listings+UP to 63 Point Points D9112D8125 ZonexData Expansion Loop Wire Specifications Wiring POPITs to the Data Expansion LoopPopit Sensor Loops Wiring Data Expansion Loops to Popex ModulesD9112 Program Record Sheet Point AssignmentsPopit Labels Vertical Grid for Popex #1D8128A OctoPOPIT Module Installing the OctoPOPITListing D8128A OctoPOPITs Wiring OctoPOPITs to the D9112Line Termination Point Assignment Switches Sensor Loop SwitchesOctoPOPIT Sensor Loops Sensor Loop D9112 Point #Testing Off-board Points Relay Outputs Configuring the D8129 OctoRelayOff-board Relays D8129 OctoRelayD8129 Switch Settings Wiring Connections InstallationRelay Output D811 Arm Status Relay ModuleD811 Module Wiring Description D1255 Command Centers Terminals 29 toD1255 Address Settings Arming DevicesD1255 Connections D9112 Command Center Terminal Function Wire ColorD9112 Power at Command CentersSilencing the Bell Keyswitch OperationMaintained Contact Momentary ContactProgrammer Connector J7 Programmer and Accessory ConnectionsProgrammer Access Reports Accessory Connector J2Expansion Port J4 D9112 Terminal Name Description Quick Reference Terminal DescriptionInstallation Guide for UL and Fire Applications Fire Applications IntroductionOptional Compatible Equipment Burglary ApplicationsFire Applications Enclosures D129 Class a System ChartSystem Wiring Diagram, Issue a Total a = Total B = Total C 1 = Current Rating Chart for Standby Battery CalculationsCurrents shown in milliamperes 1 ampere=1000 milliamperes Household Burglary and Commercial Burglary Standby Battery RequirementsCentral Station or Local Fire Alarm Remote Station or Auxiliary Fire AlarmCentral Station or Local Systems Current Chart FirstHousehold Fire Ampere-Hour Calculation Formula Remote Station or Auxiliary SystemsPanel Broken Hardware, Software Failed Troubleshooting GuideSelf Diagnostics Call for Service Trouble at Command CenterServc Keypad Supervised Command Center Missing Servc AC Fail AC Power FailedServc Batt LOW Battery Voltage Low Servc Batt Msing Battery Missing, Shorted, or ReversedPhone Line Trouble Symptom Diagnosis RemedyCommunications Failure Zonex BUS Problems Programming the PanelSee Problems with Data Expansion Loop Problems with PointsSymptom Diagnosis Remedy Symptom Diagnosis Remedy Metering the Loops Problems with the D8125 Popex Data Expansion LoopsChecking Shielded Cable EMI on Long Wire RunsNCI #1, #40 Problems with Command CentersWatchdog Reset Reports Battery and Power ReportsRunaway Reports to the Receiver Overloaded Power Supply Service Walk Test Service Walk ? Command 5 9 Shows Firmware Revision Command 5 7 Toggles Default Idle TextPress Command 5 Specifications Environmental Compatible AccessoriesSDI Bus Telephone Connections