Bosch Appliances D9112 installation manual Specifications

Page 86

Specifications

Voltage Input

Primary Power Supply

1 2

16.5VAC 40 VA class 2 plug-in transformer (D1640)

Secondary Power Supply

4 5

12 VDC 7 Ah sealed lead acid rechargeable battery. The D9112 supports a maximum of two 12 VDC 7 Ah batteries using the D122 Dual Battery Harness.

Current Requirements

Panel - 500 mA

See the D9112 Standby Battery and Current Rating Chart for the current requirements of other system components.

Power Outputs

Continuous Power Outputs

3 24 32

1.4A maximum at 10.2 VDC to 13.9 VDC (continuous supply) total for all devices and outputs supplied at terminals 3,24, and 32, connectors J2 and J4.

Alarm Power Output

6 7

2.0A maximum at 10.2 VDC to 13.9 VDC output. Output may be steady or one of three pulsed patterns depending on programming. See the Relays section of the D9112 Program Entry Guide (74-06145-000)

Switched Aux Power

8

1.4A maximum at 10.2 VDC to 13.9 VDC output. Continuous output is interrupted by Sensor Reset (CMD 47) or alarm verification depending on programming. See the Relays section of the D9112 Program Entry Guide (74-06145-000)

Fire and Fire/Burglary Systems

To comply with UL 985 and 864 listing standards for fire alarm systems (effective March 1, 1989), the total combined continuous and alarm current draw for the system during alarm conditions must be limited to 1.4A (1400 mA) provided by the primary power supply (rectified AC). If current draw for the system exceeds 1.4A, connect a D8132 Battery Charger Module to the D9112. The D8132 provides an additional 1.2 Amps of rectified AC power. Combined current draw must never exceed 2.0A.

Battery Discharge/Recharge Schedule

Discharge Cycle

 

13.9 VDC

Charging float level

13.8 VDC

Charging Status LED on

12.1 VDC

Low Battery & AC fail reports

 

if programmed, Low Battery

 

LED on

10.2 VDC

Battery load shed

 

(processing functions

 

continue if AC is present)

Recharge Cycle

 

AC ON

Load shed relay resets

 

battery charging begins,

 

battery trouble and AC

 

restoral reports sent.

13.7 VDC

Battery restoral report sent,

 

Low Battery LED off

13.9 VDC

Charging Status LED off,

 

battery float charged

Minimum Operating Voltage

10.2 VDC

 

D9112 Operation & Installation Manual

 

74-06144-000-C 2/96

Page 86

© 1993-1996 Radionics

Image 86
Contents D I O N I C S FCC Notices Part74-06144-000-C 2/96 Table of Contents Current Rating Chart for Programmer and Accessory ConnectionsInstallation Guide for UL and Fire Applications Standby Battery Calculation forD8128A OctoPOPIT Switch Settings Figures and TablesIntroduction PointsAreas and Accounts D1255 Alpha III Command CenterKeyswitch CommunicatorEMI/Lightning Transient Protection Event MemoryEvent Log ProgrammingOther Features Ordered Separately D9112 Control/Communicator AssemblyD9112 Assembly Literature PackBurglary Listings and ApprovalsFire Factory Mutual FMBefore You Begin InstallationBeginning the Installation Enclosure OptionsInstalling the D9112 Assembly Connecting Earth Ground TerminalPremises Wiring Locking the Reset Pin Lock the Reset Pin NowInstall and Wire Detection Devices Finishing the InstallationCharge the Battery as You Finish Install Modules and RelaysPower Up Install the Point Chart LabelConnect the On-Board Points and Command Centers Programming the PanelTesting the System Primary AC Power Circuit Power SupplyPrimary Power Terminals Installing the TransformerInstalling the Battery Secondary Power TerminalsSecondary DC Power Battery SupervisionFloat Charge Battery Charging CircuitBattery Discharge/Recharge Schedule No AC Power Discharge CycleCharging Status LED Yellow Charging Status and Low Battery LEDsLow Battery LED Red Circuit Protection Power OutputsAvailable Power Continuous Current Draw Continuous Power Outputs TerminalsAccessory Connector J2 Expansion Port J4Programming Programmable Power Outputs TerminalsRelay Installation Optional Relays RequiredTerminals 6 Available PowerVerification/Reset Relay TerminalNotification Telephone ConnectionsRegistration LocationOperation Monitor LED Green Phone Cord ConnectionPhone LED Red Dialing FormatRelay Installation Ground StartDescription D128 Dual Phone Line SwitcherGround Start Jumper OperationPrimary Phone Lines, Primary Phone Numbers Watchdog FeatureInstalling the D128 Primary Fail LED AC Power LEDD128 Status LEDs Secondary Fail LEDPoint Sensor Loops On-Board PointsDescription Terminals 11 to Point Parameters Point Response TimeD8125 Popex Module D8127 Popit Modules Off-Board PointsPoint Zonex Buss Terminals 23 to Listings Installing the D8125 Popex ModuleWiring the D8125 to the D9112 MountingZonex D9112D8125 +UP to 63 Point PointsWiring POPITs to the Data Expansion Loop Data Expansion Loop Wire SpecificationsWiring Data Expansion Loops to Popex Modules Popit Sensor LoopsPoint Assignments D9112 Program Record SheetVertical Grid for Popex #1 Popit LabelsListing Installing the OctoPOPITD8128A OctoPOPIT Module Wiring OctoPOPITs to the D9112 D8128A OctoPOPITsLine Termination OctoPOPIT Sensor Loops Sensor Loop SwitchesPoint Assignment Switches D9112 Point # Sensor LoopTesting Off-board Points D8129 OctoRelay Configuring the D8129 OctoRelayOff-board Relays Relay OutputsD8129 Switch Settings Installation Wiring ConnectionsD811 Arm Status Relay Module Relay OutputD811 Module Wiring Arming Devices D1255 Command Centers Terminals 29 toD1255 Address Settings DescriptionD9112 Command Center Terminal Function Wire Color D1255 ConnectionsPower at Command Centers D9112Momentary Contact Keyswitch OperationMaintained Contact Silencing the BellProgrammer and Accessory Connections Programmer Connector J7Expansion Port J4 Accessory Connector J2Programmer Access Reports D9112 Quick Reference Terminal Description Terminal Name DescriptionInstallation Guide for UL and Fire Applications Burglary Applications IntroductionOptional Compatible Equipment Fire ApplicationsFire Applications Enclosures System Chart D129 Class aSystem Wiring Diagram, Issue a Currents shown in milliamperes 1 ampere=1000 milliamperes Current Rating Chart for Standby Battery CalculationsTotal a = Total B = Total C 1 = Remote Station or Auxiliary Fire Alarm Standby Battery RequirementsCentral Station or Local Fire Alarm Household Burglary and Commercial BurglaryCurrent Chart First Central Station or Local SystemsRemote Station or Auxiliary Systems Household Fire Ampere-Hour Calculation FormulaCall for Service Trouble at Command Center Troubleshooting GuideSelf Diagnostics Panel Broken Hardware, Software FailedServc Batt Msing Battery Missing, Shorted, or Reversed Servc AC Fail AC Power FailedServc Batt LOW Battery Voltage Low Servc Keypad Supervised Command Center MissingSymptom Diagnosis Remedy Phone Line TroubleCommunications Failure Problems Programming the Panel Zonex BUSProblems with Points See Problems with Data Expansion LoopSymptom Diagnosis Remedy Symptom Diagnosis Remedy Problems with the D8125 Popex Data Expansion Loops Metering the LoopsEMI on Long Wire Runs Checking Shielded CableProblems with Command Centers NCI #1, #40Runaway Reports to the Receiver Battery and Power ReportsWatchdog Reset Reports Overloaded Power Supply Service Walk Test Service Walk ? Press Command 5 Command 5 7 Toggles Default Idle TextCommand 5 9 Shows Firmware Revision Specifications Telephone Connections Compatible AccessoriesSDI Bus Environmental