Bosch Appliances D9112 Programming the Panel, Install the Point Chart Label, Power Up

Page 17

Make the Telephone Connections

See Telephone Connections. If you are connecting the D9112 to a ground start phone system, you need to install D136 relay, see Install Modules and Relays on the previous page.

Connect the On-Board Points and Command Centers

Connect the on-board point and command center wiring to the D9112. See the On-Board Points and Arming Devices sections for instructions.

Power Up

Reconnect the battery and then plug in the transformer. Remember the buzzer sounds for 10 seconds when you first power up the panel.

Leave the reset pin locked down for now.

Yellow Charging Status LED doesn’t go out: If the yellow charging status LED doesn’t go out within 5 minutes of powering up the panel, the battery may be deeply discharged, or you may have connected too many powered devices to the panel. Combined continuous current draw for terminals 3, 8, 24, and 32, the Accessory Connector (J2), and the Expansion Port (J4) cannot exceed 1.4A. See the Power Outputs section for help.

Programming the Panel

If you haven’t created a program for the panel, review the D9112 Program Entry Guide (74-06145-000). Check to be certain you have all the required accessory modules installed for the features you want to use.

Use the D5200 Programmer or the RAM II remote programmer to load your custom program into the panel.

Move the reset pin to the normal position. See Figure 3. The panel transmits reboot and battery reports to the receiver.

Install the Point Chart Label

Radionics recommends you fill out the Point Chart Label (79-06660-000) provided in the literature pack and install it inside the enclosure doors for all systems.

Point chart label required for fire systems with verification points: You must install the point chart label for fire or combined fire/burglary systems using verification points.

Use the program record sheet to gather the information you need to fill out the point chart. Install the label on the enclosure door as shown in figure 2. To avoid smearing your entries on the chart, use the label's peel off backing to press the label in place.

 

D9112 Operation & Installation Manual

 

 

© 1993 Radionics

74-06144-000-C 2/96

Page 17

Image 17
Contents D I O N I C S Part FCC Notices74-06144-000-C 2/96 Table of Contents Installation Guide for UL and Fire Applications Programmer and Accessory ConnectionsCurrent Rating Chart for Standby Battery Calculation forFigures and Tables D8128A OctoPOPIT Switch SettingsPoints IntroductionKeyswitch D1255 Alpha III Command CenterAreas and Accounts CommunicatorEvent Log Event MemoryEMI/Lightning Transient Protection ProgrammingOther Features D9112 Assembly D9112 Control/Communicator AssemblyOrdered Separately Literature PackFire Listings and ApprovalsBurglary Factory Mutual FMBeginning the Installation InstallationBefore You Begin Enclosure OptionsInstalling the D9112 Assembly Connecting Earth Ground TerminalPremises Wiring Lock the Reset Pin Now Locking the Reset PinCharge the Battery as You Finish Finishing the InstallationInstall and Wire Detection Devices Install Modules and RelaysConnect the On-Board Points and Command Centers Install the Point Chart LabelPower Up Programming the PanelTesting the System Primary Power Terminals Power SupplyPrimary AC Power Circuit Installing the TransformerSecondary DC Power Secondary Power TerminalsInstalling the Battery Battery SupervisionBattery Discharge/Recharge Schedule No AC Power Battery Charging CircuitFloat Charge Discharge CycleCharging Status LED Yellow Charging Status and Low Battery LEDsLow Battery LED Red Circuit Protection Power OutputsAvailable Power Accessory Connector J2 Continuous Power Outputs TerminalsContinuous Current Draw Expansion Port J4Relay Installation Programmable Power Outputs TerminalsProgramming Optional Relays RequiredVerification/Reset Relay Available PowerTerminals 6 TerminalRegistration Telephone ConnectionsNotification LocationPhone LED Red Phone Cord ConnectionOperation Monitor LED Green Dialing FormatGround Start Relay InstallationGround Start Jumper D128 Dual Phone Line SwitcherDescription OperationPrimary Phone Lines, Primary Phone Numbers Watchdog FeatureInstalling the D128 D128 Status LEDs AC Power LEDPrimary Fail LED Secondary Fail LEDPoint Sensor Loops On-Board PointsDescription Terminals 11 to Point Response Time Point ParametersD8125 Popex Module D8127 Popit Modules Off-Board PointsPoint Zonex Buss Terminals 23 to Wiring the D8125 to the D9112 Installing the D8125 Popex ModuleListings MountingD8125 D9112Zonex +UP to 63 Point PointsData Expansion Loop Wire Specifications Wiring POPITs to the Data Expansion LoopPopit Sensor Loops Wiring Data Expansion Loops to Popex ModulesD9112 Program Record Sheet Point AssignmentsPopit Labels Vertical Grid for Popex #1Listing Installing the OctoPOPITD8128A OctoPOPIT Module D8128A OctoPOPITs Wiring OctoPOPITs to the D9112Line Termination OctoPOPIT Sensor Loops Sensor Loop SwitchesPoint Assignment Switches Sensor Loop D9112 Point #Testing Off-board Points Off-board Relays Configuring the D8129 OctoRelayD8129 OctoRelay Relay OutputsD8129 Switch Settings Wiring Connections InstallationRelay Output D811 Arm Status Relay ModuleD811 Module Wiring D1255 Address Settings D1255 Command Centers Terminals 29 toArming Devices DescriptionD1255 Connections D9112 Command Center Terminal Function Wire ColorD9112 Power at Command CentersMaintained Contact Keyswitch OperationMomentary Contact Silencing the BellProgrammer Connector J7 Programmer and Accessory ConnectionsExpansion Port J4 Accessory Connector J2Programmer Access Reports D9112 Terminal Name Description Quick Reference Terminal DescriptionInstallation Guide for UL and Fire Applications Optional Compatible Equipment IntroductionBurglary Applications Fire ApplicationsFire Applications Enclosures D129 Class a System ChartSystem Wiring Diagram, Issue a Currents shown in milliamperes 1 ampere=1000 milliamperes Current Rating Chart for Standby Battery CalculationsTotal a = Total B = Total C 1 = Central Station or Local Fire Alarm Standby Battery RequirementsRemote Station or Auxiliary Fire Alarm Household Burglary and Commercial BurglaryCentral Station or Local Systems Current Chart FirstHousehold Fire Ampere-Hour Calculation Formula Remote Station or Auxiliary SystemsSelf Diagnostics Troubleshooting GuideCall for Service Trouble at Command Center Panel Broken Hardware, Software FailedServc Batt LOW Battery Voltage Low Servc AC Fail AC Power FailedServc Batt Msing Battery Missing, Shorted, or Reversed Servc Keypad Supervised Command Center MissingPhone Line Trouble Symptom Diagnosis RemedyCommunications Failure Zonex BUS Problems Programming the PanelSee Problems with Data Expansion Loop Problems with PointsSymptom Diagnosis Remedy Symptom Diagnosis Remedy Metering the Loops Problems with the D8125 Popex Data Expansion LoopsChecking Shielded Cable EMI on Long Wire RunsNCI #1, #40 Problems with Command CentersRunaway Reports to the Receiver Battery and Power ReportsWatchdog Reset Reports Overloaded Power Supply Service Walk Test Service Walk ? Press Command 5 Command 5 7 Toggles Default Idle TextCommand 5 9 Shows Firmware Revision Specifications SDI Bus Compatible AccessoriesTelephone Connections Environmental