Bosch Appliances D9112 installation manual Vertical Grid for Popex #1, Popit Labels

Page 41

POPIT Labels

Off-board points are numbered 9 to 71 and 73 to 135. The D9112 reserves points 72 and 136 for internal use. You must connect POPITs for points 73 to 135 to expansion loops connected to POPEX #2.

Four sheets of peel-off POPIT labels are supplied with the D8125 POPEX module. Use the sheet marked Vertical Grid for POPEX #1 for points 9 to 71. Use the sheet marked Vertical Grid for POPEX #2 for points 73 to 135.

Each label has two parts. Place the smaller part, with just the point number on it, on the POPIT terminal block as shown in Figure 15. Place the larger part with the switch settings on the POPIT cover. Set the switches and cover the POPIT.

Do not program two POPITs for the same point number. After you program all the points, perform a walk test. The Security System Owner's Manual (74-06633-000) and the Security System User's Guide (71-06141-000) contain instructions for performing a walk test. If a point does not test, check the programming for a duplicated address.

PLACE SMALL LABEL ON THIS TERMINAL BLOCK

PT 132

 

 

 

 

 

1

2

3

4

5

6

Vertical Grid for POPEX #1

(Use this Vertical Grid for D9112 Points 9 to 71)

D9112 POINT NUMBER

 

D8112

 

D8112

POPIT SWITCH SETTING

MASTER ZONE 1

MASTER ZONE 2

 

 

D8112 STYLE ZONEX FORMAT

POPEX MODULE NUMBER

1 2 3 4 5 6

ZN 101 PX1

1 2 3 4 5 -

ZN 102

PX1

1 2 3 4 - 6

ZN 103

PX1

1 2 3 4 - -

ZN 104

PX1

1 2 3 - 5 6

ZN 105

PX1

1 2 3 - 5 -

ZN 106

PX1

PT 13 PT 12 PT 11 PT 10 PT 09

PT 13 PT 12 PT 11 PT 10 PT 09

1 2 - 4 5 6

ZN 109

PX1

1 2 - 4 5 - ZN 110 PX1

1 2 - 4 - 6 ZN 111 PX1

1 2 - 4 - - ZN 112 PX1

1 2 - - 5 6 ZN 113 PX1

PT 17

PT 17

 

 

 

 

PT 18

PT 18

 

PT 19

PT 19

 

 

 

 

PT 20

PT 20

 

 

 

 

PT 21

PT 21

 

 

 

 

1 - 3 4 5 6

ZN 201

PX1

1 - 3 4 5 -

ZN 202

PX1

1 - 3 4 - 6

ZN 203

PX1

1 - 3 4 - - ZN 204 PX1

PT 26 PT 25

PT 26 PT 25

127

- - 4 5 6

PTZN 209

PX1

1 - - 4 5 - ZN 210 PX1

1 - - 4 - 6 ZN 211 PX1

1 - - 4 - - ZN 212 PX1

Figure 15: POPIT Labels

 

D9112

Operation & Installation Manual

 

 

© 1993 Radionics

74-06144-000-C 2/96

Page 41

Image 41
Contents D I O N I C S Part FCC Notices74-06144-000-C 2/96 Table of Contents Installation Guide for UL and Fire Applications Programmer and Accessory ConnectionsCurrent Rating Chart for Standby Battery Calculation forFigures and Tables D8128A OctoPOPIT Switch SettingsPoints IntroductionKeyswitch D1255 Alpha III Command CenterAreas and Accounts CommunicatorEvent Log Event MemoryEMI/Lightning Transient Protection ProgrammingOther Features D9112 Assembly D9112 Control/Communicator AssemblyOrdered Separately Literature PackFire Listings and ApprovalsBurglary Factory Mutual FMBeginning the Installation InstallationBefore You Begin Enclosure OptionsInstalling the D9112 Assembly Connecting Earth Ground TerminalPremises Wiring Lock the Reset Pin Now Locking the Reset PinCharge the Battery as You Finish Finishing the InstallationInstall and Wire Detection Devices Install Modules and RelaysConnect the On-Board Points and Command Centers Install the Point Chart LabelPower Up Programming the PanelTesting the System Primary Power Terminals Power SupplyPrimary AC Power Circuit Installing the TransformerSecondary DC Power Secondary Power TerminalsInstalling the Battery Battery SupervisionBattery Discharge/Recharge Schedule No AC Power Battery Charging CircuitFloat Charge Discharge CycleCharging Status LED Yellow Charging Status and Low Battery LEDsLow Battery LED Red Circuit Protection Power OutputsAvailable Power Accessory Connector J2 Continuous Power Outputs TerminalsContinuous Current Draw Expansion Port J4Relay Installation Programmable Power Outputs TerminalsProgramming Optional Relays RequiredVerification/Reset Relay Available PowerTerminals 6 TerminalRegistration Telephone ConnectionsNotification LocationPhone LED Red Phone Cord ConnectionOperation Monitor LED Green Dialing FormatGround Start Relay InstallationGround Start Jumper D128 Dual Phone Line SwitcherDescription OperationPrimary Phone Lines, Primary Phone Numbers Watchdog FeatureInstalling the D128 D128 Status LEDs AC Power LEDPrimary Fail LED Secondary Fail LEDPoint Sensor Loops On-Board PointsDescription Terminals 11 to Point Response Time Point ParametersD8125 Popex Module D8127 Popit Modules Off-Board PointsPoint Zonex Buss Terminals 23 to Wiring the D8125 to the D9112 Installing the D8125 Popex ModuleListings MountingD8125 D9112Zonex +UP to 63 Point PointsData Expansion Loop Wire Specifications Wiring POPITs to the Data Expansion LoopPopit Sensor Loops Wiring Data Expansion Loops to Popex ModulesD9112 Program Record Sheet Point AssignmentsPopit Labels Vertical Grid for Popex #1Listing Installing the OctoPOPITD8128A OctoPOPIT Module D8128A OctoPOPITs Wiring OctoPOPITs to the D9112Line Termination OctoPOPIT Sensor Loops Sensor Loop SwitchesPoint Assignment Switches Sensor Loop D9112 Point #Testing Off-board Points Off-board Relays Configuring the D8129 OctoRelayD8129 OctoRelay Relay OutputsD8129 Switch Settings Wiring Connections InstallationRelay Output D811 Arm Status Relay ModuleD811 Module Wiring D1255 Address Settings D1255 Command Centers Terminals 29 toArming Devices DescriptionD1255 Connections D9112 Command Center Terminal Function Wire ColorD9112 Power at Command CentersMaintained Contact Keyswitch OperationMomentary Contact Silencing the BellProgrammer Connector J7 Programmer and Accessory ConnectionsExpansion Port J4 Accessory Connector J2Programmer Access Reports D9112 Terminal Name Description Quick Reference Terminal DescriptionInstallation Guide for UL and Fire Applications Optional Compatible Equipment IntroductionBurglary Applications Fire ApplicationsFire Applications Enclosures D129 Class a System ChartSystem Wiring Diagram, Issue a Currents shown in milliamperes 1 ampere=1000 milliamperes Current Rating Chart for Standby Battery CalculationsTotal a = Total B = Total C 1 = Central Station or Local Fire Alarm Standby Battery RequirementsRemote Station or Auxiliary Fire Alarm Household Burglary and Commercial BurglaryCentral Station or Local Systems Current Chart FirstHousehold Fire Ampere-Hour Calculation Formula Remote Station or Auxiliary SystemsSelf Diagnostics Troubleshooting GuideCall for Service Trouble at Command Center Panel Broken Hardware, Software FailedServc Batt LOW Battery Voltage Low Servc AC Fail AC Power FailedServc Batt Msing Battery Missing, Shorted, or Reversed Servc Keypad Supervised Command Center MissingPhone Line Trouble Symptom Diagnosis RemedyCommunications Failure Zonex BUS Problems Programming the PanelSee Problems with Data Expansion Loop Problems with PointsSymptom Diagnosis Remedy Symptom Diagnosis Remedy Metering the Loops Problems with the D8125 Popex Data Expansion LoopsChecking Shielded Cable EMI on Long Wire RunsNCI #1, #40 Problems with Command CentersRunaway Reports to the Receiver Battery and Power ReportsWatchdog Reset Reports Overloaded Power Supply Service Walk Test Service Walk ? Press Command 5 Command 5 7 Toggles Default Idle TextCommand 5 9 Shows Firmware Revision Specifications SDI Bus Compatible AccessoriesTelephone Connections Environmental