Problems with the D8125 POPEX Data Expansion Loops

EMI (Electro-magnetic Interference), excessive resistance, or intermittent grounds, shorts, or opens on the data expansion loop can cause erratic or intermittent functioning of points. Follow the procedures below to find the source of problems on the data expansion loop.

EMI

If you suspect EMI may be a problem, see EMI on Long Wire Runs in this section.

AC induction on the data expansion loops must be less than 10 VAC.

Metering the Loops

Before you follow the procedures below to meter the data expansion loops, check Table 1 to be sure you used the correct gauge wire for the length of the data expansion loops.

When you meter the loop, monitor it long enough to observe an intermittent problem.

To meter the data expansion loop without POPITs connected to it:

1.Disconnect the loop from the POPEX module.

2.Twist the positive and then the negative wires together at each POPIT location so that the positive and negative wires are continuous to the last POPIT location.

3.At the last POPIT location twist the end of the positive wire to the negative wire to form one continuous loop.

4.Meter the loop for continuity from the point where it connected to the POPEX module. Resistance for the entire loop must be less than 60ý. If there is no continuity, find and repair the open on the loop.

5.Still metering for continuity, untwist the negative and positive wires at the last POPIT location. If the meter does not show an open condition, find and repair the short on the loop.

6.Twist the positive and negative wires at the last POPIT location back together.

7.Meter the loop for continuity to terminal 10 (earth ground). If there is continuity, find and remove the foreign ground on the loop.

8.Meter the loop to terminal 10 for AC voltage. AC induction on data expansion loops must be less than 10 VAC. Try using shielded cable to reduce AC induction if the AC voltage exceeds 10 VAC.

 

D9112 Operation & Installation Manual

 

74-06144-000-C 2/96

Page 78

© 1993-1996 Radionics

Image 78
Contents D I O N I C S FCC Notices Part74-06144-000-C 2/96 Table of Contents Current Rating Chart for Programmer and Accessory ConnectionsInstallation Guide for UL and Fire Applications Standby Battery Calculation forD8128A OctoPOPIT Switch Settings Figures and TablesIntroduction PointsAreas and Accounts D1255 Alpha III Command CenterKeyswitch CommunicatorEMI/Lightning Transient Protection Event MemoryEvent Log ProgrammingOther Features Ordered Separately D9112 Control/Communicator AssemblyD9112 Assembly Literature PackBurglary Listings and ApprovalsFire Factory Mutual FMBefore You Begin InstallationBeginning the Installation Enclosure OptionsConnecting Earth Ground Terminal Premises WiringInstalling the D9112 Assembly Locking the Reset Pin Lock the Reset Pin NowInstall and Wire Detection Devices Finishing the InstallationCharge the Battery as You Finish Install Modules and RelaysPower Up Install the Point Chart LabelConnect the On-Board Points and Command Centers Programming the PanelTesting the System Primary AC Power Circuit Power SupplyPrimary Power Terminals Installing the TransformerInstalling the Battery Secondary Power TerminalsSecondary DC Power Battery SupervisionFloat Charge Battery Charging CircuitBattery Discharge/Recharge Schedule No AC Power Discharge CycleCharging Status and Low Battery LEDs Low Battery LED RedCharging Status LED Yellow Power Outputs Available PowerCircuit Protection Continuous Current Draw Continuous Power Outputs TerminalsAccessory Connector J2 Expansion Port J4Programming Programmable Power Outputs TerminalsRelay Installation Optional Relays RequiredTerminals 6 Available PowerVerification/Reset Relay TerminalNotification Telephone ConnectionsRegistration LocationOperation Monitor LED Green Phone Cord ConnectionPhone LED Red Dialing FormatRelay Installation Ground StartDescription D128 Dual Phone Line SwitcherGround Start Jumper OperationWatchdog Feature Installing the D128Primary Phone Lines, Primary Phone Numbers Primary Fail LED AC Power LEDD128 Status LEDs Secondary Fail LEDOn-Board Points Description Terminals 11 toPoint Sensor Loops Point Parameters Point Response TimeOff-Board Points Point Zonex Buss Terminals 23 toD8125 Popex Module D8127 Popit Modules Listings Installing the D8125 Popex ModuleWiring the D8125 to the D9112 MountingZonex D9112D8125 +UP to 63 Point PointsWiring POPITs to the Data Expansion Loop Data Expansion Loop Wire SpecificationsWiring Data Expansion Loops to Popex Modules Popit Sensor LoopsPoint Assignments D9112 Program Record SheetVertical Grid for Popex #1 Popit LabelsInstalling the OctoPOPIT D8128A OctoPOPIT ModuleListing Wiring OctoPOPITs to the D9112 D8128A OctoPOPITsLine Termination Sensor Loop Switches Point Assignment SwitchesOctoPOPIT Sensor Loops D9112 Point # Sensor LoopTesting Off-board Points D8129 OctoRelay Configuring the D8129 OctoRelayOff-board Relays Relay OutputsD8129 Switch Settings Installation Wiring ConnectionsD811 Arm Status Relay Module Relay OutputD811 Module Wiring Arming Devices D1255 Command Centers Terminals 29 toD1255 Address Settings DescriptionD9112 Command Center Terminal Function Wire Color D1255 ConnectionsPower at Command Centers D9112Momentary Contact Keyswitch OperationMaintained Contact Silencing the BellProgrammer and Accessory Connections Programmer Connector J7Accessory Connector J2 Programmer Access ReportsExpansion Port J4 D9112 Quick Reference Terminal Description Terminal Name DescriptionInstallation Guide for UL and Fire Applications Burglary Applications IntroductionOptional Compatible Equipment Fire ApplicationsFire Applications Enclosures System Chart D129 Class aSystem Wiring Diagram, Issue a Current Rating Chart for Standby Battery Calculations Total a = Total B = Total C 1 =Currents shown in milliamperes 1 ampere=1000 milliamperes Remote Station or Auxiliary Fire Alarm Standby Battery RequirementsCentral Station or Local Fire Alarm Household Burglary and Commercial BurglaryCurrent Chart First Central Station or Local SystemsRemote Station or Auxiliary Systems Household Fire Ampere-Hour Calculation FormulaCall for Service Trouble at Command Center Troubleshooting GuideSelf Diagnostics Panel Broken Hardware, Software FailedServc Batt Msing Battery Missing, Shorted, or Reversed Servc AC Fail AC Power FailedServc Batt LOW Battery Voltage Low Servc Keypad Supervised Command Center MissingSymptom Diagnosis Remedy Phone Line TroubleCommunications Failure Problems Programming the Panel Zonex BUSProblems with Points See Problems with Data Expansion LoopSymptom Diagnosis Remedy Symptom Diagnosis Remedy Problems with the D8125 Popex Data Expansion Loops Metering the LoopsEMI on Long Wire Runs Checking Shielded CableProblems with Command Centers NCI #1, #40Battery and Power Reports Watchdog Reset ReportsRunaway Reports to the Receiver Overloaded Power Supply Service Walk Test Service Walk ? Command 5 7 Toggles Default Idle Text Command 5 9 Shows Firmware RevisionPress Command 5 Specifications Telephone Connections Compatible AccessoriesSDI Bus Environmental