Graco 3A1214B important safety instructions Hose Routing, Hose Connection

Page 16

Setup

Hose Routing

1.Pull slide beam out to one side of the vehicle. Pull gun arm out and lower it to make sure the hose bun- dle has been secured at the proper location to ensure full movement for the gun arm to move from one side to the other. Make adjustments to the hose clamp that secures the bundle as needed.

ti16658a

Hose Connection

1.Install suction tubes to the RPS 2900 pump and route to paint drum.

ti16444a

ti16445a

 

2.Install return line from the RPS 2900 filter assembly and route back to the paint drum.

2.Lift gun arm back to the stow position. Pull slide beam out to other side of vehicle and pull the gun arm to that side to ensure the hose length is ade- quate for full movement.

ti16655a

ti16597a

3.Install paint lines to RPS 2900 filter assemblies. For a two color system, route the hose from paint gun 1 to pump 1 and route one hose from paint gun 2 to pump 1. Route the second hose from paint gun 2 to pump 2.

3. Put gun arm back to the stow position and pin it into place. Center the slide beam to the vehicle. Lock the slide beam and gun arm into place by engaging the clamps for each.

ti16446a

4. Install bead lines to the bead tank.

ti15954a

ti16598a

16

3A1214B

Image 16
Contents Important Safety Instructions List of Models seeModels Complete AssembliesFire and Explosion Hazard Equipment Misuse Hazard Introduction Introduction and General InformationGeneral Information Component Identification Component Function Setup Charge BatteryGun Arm Bracket Mount Single Hitch Mounting Bracket 24G626 Installation OptionFilter Orientation RoadPak Mounting Bracket 24G627 Installation Option Narrow Orientation21 in. 25 Cm 63 cm Wide Orientation Slide Beam Installation 24G630 Gun Arm Installation 24G628, 24G629705 Hose Routing to Pumps and Tanks Hose Routing Hose ConnectionElectrical Cable Connections Install Front Pointer Instructions Install and Align Front Mechanical Guidance System OptionalInstall and Align Video Guidance System Optional Install Winch Kit OptionalPressure Relief Procedure OperationRPS 2900 Pump Fluid Pressure Relief Bead System Pressure ReliefSet Up Slide Beam and Gun Arm Initial SettingsLoad Reflecting Materials Prepare System to PaintSafe Range cold Start Engine Select/Prime PumpsPrime Guns Begin to SprayTurn on Bead System Perform Pressure Relief Procedure, see Flushing the SystemOperation Securing Gun Arm for Transportation RoadLazer in Storage PositionTechnical Data Graco Standard Warranty Graco Information