BUILT-IN CUTOUT DIMENSIONS

GENERAL CONSTRUCTION DETAILS

Summit® Built-In unit and all other accessory units should be on site before construction begins.

For ease of installation, the grill will be pushed on its casters into the built-in structure.

The installation of this grill requires a level floor pad surface (1) and countertop surface. The floor pad surface must be constructed from solid materials and must be level and smooth. Proper subgrade materials must be used under the floor pad to prevent materials from settling and heaving.

Rotisserie Outlet

If the supporting structure is going to have an electrical outlet for a rotisserie, it should be on the left side of the structure.

1

Grill and enclosure illustrations are for reference only.

1

6

a

BUILT-IN CUTOUT DETAILED DIMENSIONS

1

 

d

 

 

 

 

 

 

 

 

 

1

 

 

 

4

1

3

 

2

 

5

 

 

 

 

 

 

 

 

 

3

 

 

c

 

7

b

 

 

 

 

 

 

 

2

b

DIMENSIONS

1

2

3

4

5

6

7

a

b

c

d

460

660

24" minimum* (610 mm)

24" minimum* (610 mm)

 

 

16 1/2" (419 mm)

16 1/2" (419 mm)

 

 

11 1/8" (283 mm)

11 1/8" (283 mm)

 

 

10 1/2" (267 mm) minimum

10 1/2" (267 mm) minimum

 

 

24 5/16" (618 mm)

24 5/16" (618 mm)

 

 

36" (914 mm) maximum

36" (914 mm) maximum

 

 

34" (864 mm) Built-In frame

42" (1067 mm) Built-In frame

 

 

For a countertop treatment: recommended 3/4" (19 mm) overhang.

Gas inlet

Side burner opening

Access for electric on left hand side

*Clearance from any surface or structure is at least 24" (610 mm) from the back and sides of the grill or side burner.

www.weber.com® 5

Image 5
Contents Gas Grill Liquid Propane GAS Units only Island Structure Configuration Options BUILT-IN Cutout DimensionsIsland Structure Configuration Options Clearance from Surfaces or Structures BUILT-IN Structure Cutout DimensionsLocating Your Grill General Construction Details BUILT-IN Cutout Detailed DimensionsParts List Lista DE Piezas Liste DES Pieces Tools Needed Herramientas Requeridas Outils Necessaires Assembly Ensamblaje Assemblage460 660 Assembly Ensamblaje Assemblage Assembly Ensamblaje Assemblage Assembly Ensamblaje Assemblage Assembly Ensamblaje Assemblage Assembly Ensamblaje Assemblage Assembly Ensamblaje Assemblage Assembly Ensamblaje Assemblage Assembly Ensamblaje Assemblage Assembly Ensamblaje Assemblage Assembly Ensamblaje Assemblage Assembly Ensamblaje Assemblage Assembly Ensamblaje Assemblage 460660 Assembly Ensamblaje Assemblage BUILT-IN GAS Line Locations General Specifications for PipingGAS Supply Test Connections Typical 20 LP Propane GAS Supply Installation Operating BUILT-IN Tank Enclosure InstructionsClearance from Combustible Surfaces or Structures Locating Your LP Tank Enclosure KITBUILT-IN Tank Enclosure Parts List / Assembly Mounting the LP Tank Bracket BUILT-IN Tank Enclosure AssemblyMounting the LP Hose and Regulator LP Tank Enclosure GAS Line LocationsConnect GAS Supply Connection ChartGAS Supply Connection Ventilation VentilationMemo Barbacoa de Gas Únicamente Unidades DE GAS Propano Licuado AdvertenciasOpciones DE Configuración DE LAS Estructuras DE LAS Islas Dimensiones DEL Corte DEL EmpotramientoOpciones DE Configuración DE LAS Estructuras DE LAS Islas Nota SI Usted HA Comprado UN Quemador LateralDimensiones Generales DEL Corte DEL Empotrado Dimensiones DEL Corte DE LA Estructura EmpotradaUbicación DE LA Barbacoa Separación DE LAS Superficies O EstructurasDetalles Generales DE LA Construcción Dimensiones Detalladas DEL Corte DEL EmpotradoUbicaciones DE LAS Líneas DE GAS Empotradas Suministro DE GASInstalación Típica DE Suministro DE GAS Propano a Granel Especificaciones Generales Para LA TuberíaLongitud de tubería pies Pruebe LAS ConexionesSuministro DE GAS Operación Instrucciones Para EL Compartimiento Empotrado DEL TanqueSeparación DE Superficies O Estructuras Combustibles Ubicación DEL Juego DE Caja Para Tanques DE Propano LicuadoPage Montaje DEL LA Manguera Y Regulador DEL Propano Licuado Ensamblaje DEL Compartimiento Empotrado DEL TanqueMontaje DEL Soporte DEL Tanque DE Propano Licuado Cuadro DE Conexiones Conexión DEL Suministro DE GASConectar EL Suministro DE GAS Ventilación VentilaciónGrill a GAZ Appareils a GAZ Propane Uniquement Mises EN GardeRemarque SI Vous Avez Achete UN Bruleur Lateral Dimensions Pour LA Decoupe D’ENCASTRAGEOptions Pour LA Configuration DE LA Structure EN Ilot Dimensions DE Decoupe Pour LA Structure Encastree Choisir L’EMPLACEMENT DE Votre GrillDimensions Generales Pour LA Decoupe D’ENCASTRAGE Zone DE Degagement PAR Rapport AUX Surfaces OU StructuresGeneralites SUR LA Construction Dimensions Detaillees Pour LA Decoupe D’ENCASTRAGEInstallation D’ARRIVEE DE GAZ Propane EN Vrac Typique Emplacements DES Conduites DE GAZ EncastreesEmplacements Pour LA Conduite DE GAZ Integree Arrivee DE GAZ040 460 050 720 Test DES RaccordsInstallation DE L’ALIMENTATION EN GAZ Propane Utilisation Distance PAR Rapport AUX Surfaces OU Structures Inflammables Localisation DE Votre KIT D’ENTOURAGE DE Bouteille DE PLPage Montage DU Tuyau DE PL ET DU Regulateur Montage DU Support DE LA Bouteille DE PLTableau DE Connexion Connexion a L’ARRIVEE DE GAZConnecter L’ARRIVEE DE GAZ Remarque Ces schémas ne sont fournis qu’à titre de référence Memo Memo Memo WEBER-STEPHEN Products LLC