Percent Oxygen Analyzer | Installation | |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Figure 3-5: Connections to Probe
3.5 Installation Checklist
Prior to powering up the unit make sure you have:
•Installed the unit correctly
•Checked the probe and welded probe socket for leaks
Once the above checks have been made, you can connect the power source. Wait approximately 30 minutes for warm up, two hours wait is best. After that, the instrument is ready for operation.
Teledyne Analytical Instruments | 29 |