![](/images/new-backgrounds/1304849/30484915x1.webp)
BDS 3960
4.9 | Switching The Program Back To The Front | 56 |
Maintenance | 58 | |
5.1 | Routine Maintenance | 58 |
5.2 | Adding Water to the BDS Sensor | 58 |
5.3 | Fuse Replacement | 59 |
5.4 | Battery Backup Replacement | 60 |
5.5 Reinstalling Application software to PPC. | 61 | |
5.5 | Major Internal Components | 62 |
5.6 | Cleaning | 62 |
5.7 | Troubleshooting | 62 |
Appendix | 66 | |
Specifications | 66 | |
68 | ||
Drawing List | 69 | |
69 | ||
Application notes | 70 | |
Material Safety Data Sheet | 71 | |
Index | 74 |
Teledyne Analytical Instruments | viii |