8. INSTALLATION REQUIREMENTS
A. TOOLS REQUIRED | B. MATERIALS REQUIRED | ||
S | Conventional woodworking tools | S | Plumbers putty |
S Arc pliers or 14” pipe wrench | S | ||
S | Rule | S Wall coverings, as necessary | |
S | Level | S | RTV silicone sealant |
S | Safety shoes | S | Four 1/4” x 1” lag screws |
SSafety glasses
SSquare
SScrewdriver
SPliers
SUtility knife
C. CLEARANCE REQUIREMENTS
Check
D.NEW OR REPLACEMENT INSTALLATION REQUIREMENTS
This bath unit can be installed in new or existing bathrooms.
For new installations: Position plumbing according to
For replacement installations: Remove old bath, remove old wall material and remove old floor covering from area. Remove old plumbing which does not conform to
12 | Kohler Co., Kohler WI |