Pre-Power-Up Check
Pre-Power-Up Check
Use the checklist below to complete initial checks before progressing further.
Checklist
All AC and DC cabling is installed
All cabling is neat and correctly insulated
DC battery and load cabling has the correct polarity
All panels are in place and all empty rectifier slots are covered with blanking panels
The AC supply to the power system is switched OFF
All circuit breakers at the front of the power system are switched OFF
Batteries (if fitted) are isolated from the power system