Polycom JPI300 Installation Steps and Responsibilities, Install Shelves and Interface Modules

Page 10

SpectraLink 6300 MCU: Facility Preparation

Installation Steps and Responsibilities

 

 

 

 

Task

 

 

Wire

 

 

Field Service

 

 

Customer

 

 

9

 

 

 

 

Contractor or

 

 

 

 

Project Mgr/

 

 

 

 

Description

 

 

 

 

Engineer

 

 

 

 

 

 

 

 

 

Electrician

 

 

 

 

Sys Admin

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Site Preparation

 

 

 

 

 

 

 

 

 

 

 

 

 

Required materials provided by customer

 

 

 

 

 

 

9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Prepare location and arrangement of

 

 

 

 

 

 

9

 

 

 

 

 

shelves

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Prepare –48V power for shelves

9

 

 

 

 

 

 

 

 

 

 

 

Run cables to Base Stations

9

 

 

 

 

 

 

 

 

 

 

 

Terminate cables at Base Stations

9

 

 

 

 

 

 

 

 

 

 

 

Prepare and install demarc blocks

9

 

 

 

 

 

 

 

 

 

 

 

Program Telephone System ports

 

 

 

 

 

 

9

 

 

 

 

 

Connect cables from Base Stations and

9

 

 

 

 

 

 

 

 

 

 

 

phone lines to demarc blocks

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Wire demarc blocks for Interface Modules

9

 

 

 

 

 

 

 

 

 

 

 

Install Shelves and Interface Modules

 

 

 

 

 

 

 

 

 

 

 

 

 

Survey site and check components

 

 

 

9

 

 

 

 

 

 

 

 

Install shelves

 

 

 

9

 

 

 

 

 

 

 

 

Install junction panel

 

 

 

9

 

 

 

 

 

 

 

 

Connect power to shelves

 

 

 

9

 

 

 

 

 

 

 

 

Install cards in shelves

 

 

 

9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Connect junction panel

 

 

 

9

 

 

 

 

 

 

 

 

Connect demarc blocks to Interface

 

 

 

9

 

 

 

 

 

 

 

 

Modules

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Install Base Stations

 

 

 

 

 

 

 

 

 

 

 

 

 

Install Base Stations in ceilings

 

 

 

9

 

 

 

 

 

 

 

 

Install Outdoor Base Stations

9

 

 

 

 

 

 

 

 

 

 

 

Check system diagnostics

 

 

 

9

 

 

 

 

 

 

 

 

Initialize System

 

 

 

9

 

 

 

 

 

 

 

 

Program handset features

 

 

 

 

 

 

9

 

 

 

 

 

Test System and Certify Site

 

 

 

9

 

 

 

 

10

PN: 1725-36122-001_M.doc

Image 10
Contents SpectraLink 6300 MCU Installation Patent Information Polycom Model Numbers About This GuideRelated Documents Customer Support Icons and ConventionsContents Site Certification Installation Forms System InstallationInstall Base Stations System Initialization Test SystemIndex53H Page Installation Overview Installation Steps and Responsibilities Install Shelves and Interface ModulesSpectraLink 6000 System Description SpectraLink 6000 System Master Control Unit SpectraLink 6000 System ComponentsSpectraLink 6000 System topology Shelf 1 Primary Shelf Intershelf Junction Panel Expansion Shelf CSC300, CSO300 ShelfSystem Controller CSC or CSO301, 306, Interface Modules CPA, CPU, CPM, CPP, CPF316Base Stations Intershelf Junction Panel JPI300SpectraLink 6000 Wireless Telephones CcSpectraLink 6000 SystemOperator’s Console SpectraLink OAI GatewaySite Preparation Required Materials Provided by Customer Required hardwareSystem administrator Operator’s Console PCPrepare Location for Shelves Union laborPrepare rack or wall Rack mountingSpectraLink 6300 MCU Facility Preparation Wall mounting Wire specifications Prepare Power for ShelvesRun Cables to Base Station Locations Pull cable Terminate Cables at Base Station Locations Prepare Demarc Blocks Interface TypeMultiple power pairs Two-wire analog or digital interfaceFour-wire digital interface Program Telephone System Install Demarc BlocksAssign and program ports Site Preparation Two-wire analog or digital demarc block Telephone Ports Base Station Power Pairs DataFour-wire digital demarc block Base Station Power Pairs DataFour-wire Digital Connector B Connect demarc block 25-pair cable Page Facility Analysis System InstallationCheck Components SpectraLink 6300 MCU Facility Preparation Rack mount Install ShelvesWall mount Install Intershelf Junction Panel Connect Power to ShelvesConnect wire to terminals Run conduit to shelfInstall Cards Install Interface ModulesInstall Expansion Shelf Controllers CSC300 Do not install any card in slot 1 of expansion shelves Connect the Intershelf Junction Panel Connect Demarc Block RJ-21Cables to Interface Module Install Base Stations Mount Base Stations on Dropped Tile CeilingsMount Base Stations on Finished Ceilings Wire outdoor Base Stations Install Outdoor Base StationsMount and connect outdoor Base Stations Power Up and Check Diagnostics System Initialization Page Test System Voice-test each Base StationRun Listen Verify Diagnostic Site Certification Page Installation Forms Site Preparation ChecklistSpectraLink 6300 MCU Facility Preparation Base Station Location Worksheet Shelf Number Interface ModuleExtension Assignments Worksheet Shelf Interface ModuleCustomer Acceptance Form SpectraLink 6300 MCU Facility Preparation Safety Notices Important Safety InformationPage Index OAI