SpectraLink 6300 MCU: Facility Preparation
of shelves to be mounted. Follow the manufacturer’s instructions to prepare the rack.
Be sure to leave 1.5” clearance at the rear of the racks for power conduit.
24 | PN: |
of shelves to be mounted. Follow the manufacturer’s instructions to prepare the rack.
Be sure to leave 1.5” clearance at the rear of the racks for power conduit.
24 | PN: |