Polycom 1725-36122-001, MCS300, JPI300 manual Mount Base Stations on Finished Ceilings

Page 50

SpectraLink 6300 MCU: Facility Preparation

4.When properly attached the Base Station should sit almost flush against the ceiling and be tightly attached to the clip and T-bar grid work.

5.Once the Base Station is anchored to the fastener, lift the acoustical tile and plug the RJ-45 8-pin modular plug into the connector on the top of the Base Station.

The LED will blink red and green as the system software downloads to the Base Station and the Base Station is tested.

When the LED blinks amber, the system is ready for operation.

When the LED blinks green, a handset has established a radio link with that Base Station.

If the LED turns solid red or other red/green sequence, refer to SpectraLink 6300 MCU Maintenance and Diagnostics.

Mount Base Stations on Finished Ceilings

If this site does not have a dropped tile ceiling, the Base Station can be mounted to a finished ceiling or wall with a 4 to 5” long 1/4” -20 TPI plastic or nylon screw or bolt (such as a lag screw).

The customer’s wire contractor is responsible for this installation.

1.Drill two holes approximately 1” apart. Make the holes large enough to accommodate the RJ-45 connector and a bolt to secure the Base Station.

2.Insert a wide washer above the ceiling, then screw the bolt into the beam or ceiling.

3.Insert three nuts on the bolt, then screw the Base Station into the bolt, being careful not to insert the bolt more than 1/3”, five full turns, into the Base Station.

If the ceiling is open with I-beams or pipe construction, mount the

Base Station with I-beam clamps or pipe clamps.

50

PN: 1725-36122-001_M.doc

Image 50
Contents SpectraLink 6300 MCU Installation Patent Information Related Documents About This GuidePolycom Model Numbers Customer Support Icons and ConventionsContents Site Certification Installation Forms System InstallationInstall Base Stations System Initialization Test SystemIndex53H Page Installation Overview Installation Steps and Responsibilities Install Shelves and Interface ModulesSpectraLink 6000 System Description SpectraLink 6000 System SpectraLink 6000 System topology SpectraLink 6000 System ComponentsMaster Control Unit Shelf 1 Primary Shelf Intershelf Junction Panel Expansion Shelf CSC300, CSO300 ShelfSystem Controller CSC or CSO301, 306, Interface Modules CPA, CPU, CPM, CPP, CPF316Base Stations Intershelf Junction Panel JPI300SpectraLink 6000 Wireless Telephones CcSpectraLink 6000 SystemOperator’s Console SpectraLink OAI GatewaySite Preparation Required Materials Provided by Customer Required hardwareSystem administrator Operator’s Console PCPrepare Location for Shelves Union laborPrepare rack or wall Rack mountingSpectraLink 6300 MCU Facility Preparation Wall mounting Run Cables to Base Station Locations Prepare Power for ShelvesWire specifications Pull cable Terminate Cables at Base Station Locations Prepare Demarc Blocks Interface TypeMultiple power pairs Two-wire analog or digital interfaceFour-wire digital interface Assign and program ports Install Demarc BlocksProgram Telephone System Site Preparation Two-wire analog or digital demarc block Telephone Ports Base Station Power Pairs DataFour-wire digital demarc block Base Station Power Pairs DataFour-wire Digital Connector B Connect demarc block 25-pair cable Page Check Components System InstallationFacility Analysis SpectraLink 6300 MCU Facility Preparation Wall mount Install ShelvesRack mount Install Intershelf Junction Panel Connect Power to ShelvesConnect wire to terminals Run conduit to shelfInstall Cards Install Interface ModulesInstall Expansion Shelf Controllers CSC300 Do not install any card in slot 1 of expansion shelves Connect the Intershelf Junction Panel Connect Demarc Block RJ-21Cables to Interface Module Install Base Stations Mount Base Stations on Dropped Tile CeilingsMount Base Stations on Finished Ceilings Mount and connect outdoor Base Stations Install Outdoor Base StationsWire outdoor Base Stations Power Up and Check Diagnostics System Initialization Page Test System Voice-test each Base StationRun Listen Verify Diagnostic Site Certification Page Installation Forms Site Preparation ChecklistSpectraLink 6300 MCU Facility Preparation Base Station Location Worksheet Shelf Number Interface ModuleExtension Assignments Worksheet Shelf Interface ModuleCustomer Acceptance Form SpectraLink 6300 MCU Facility Preparation Safety Notices Important Safety InformationPage Index OAI