SpectraLink 6300 MCU: Facility Preparation
| Install Demarc Blocks | 32 |
| Program Telephone System | 32 |
| Connect Cables from Base Stations and Phone Lines to |
|
| Demarc Blocks | 33 |
5 | System Installation | 39 |
| Facility Analysis | 39 |
| Check Components | 39 |
| Install Shelves | 41 |
| Install Intershelf Junction Panel | 42 |
| Connect Power to Shelves | 42 |
| Install Cards | 44 |
| Connect the Intershelf Junction Panel | 47 |
| Connect Demarc Block | 48 |
6 | Install Base Stations | 49 |
| Mount Base Stations on Dropped Tile Ceilings | 49 |
| Mount Base Stations on Finished Ceilings | 50 |
| Install Outdoor Base Stations | 51 |
| Power Up and Check Diagnostics | 52 |
7 | System Initialization | 53 |
8 | Test System | 55 |
| 55 | |
| Run Listen Verify Diagnostic | 56 |
9 | Site Certification | 57 |
10 | Installation Forms | 59 |
| Site Preparation Checklist | 59 |
6 | PN: |