Site Preparation

Wall mounting

Before wall mounting, cover the wall with 3/4” plywood. Secure the plywood to the wall studs every 16” with an adequate number of screws to support the number of shelves to be mounted. Each fully loaded shelf weighs approximately 35 pounds. Be sure to leave 1.5” clearance on the left side for power conduit.

Using the following drawing as a guide, drill six pilot holes using a 1/8” drill bit.

Insert the six screws (#10 panhead wood screws, 5/8” long) into the pilot holes and tighten them, leaving approximately 1/8 to 1/4” gap from the wall.

Wall Mounting Dimensions

PN: 1725-36122-001_M.doc

25

Image 25
Contents SpectraLink 6300 MCU Installation Patent Information Polycom Model Numbers About This GuideRelated Documents Icons and Conventions Customer SupportContents Install Base Stations System InstallationSite Certification Installation Forms System Initialization Test SystemIndex53H Page Installation Overview Install Shelves and Interface Modules Installation Steps and ResponsibilitiesSpectraLink 6000 System Description SpectraLink 6000 System Master Control Unit SpectraLink 6000 System ComponentsSpectraLink 6000 System topology Shelf 1 Primary Shelf Intershelf Junction Panel System Controller CSC or CSO301, 306, ShelfExpansion Shelf CSC300, CSO300 Interface Modules CPA, CPU, CPM, CPP, CPF316Intershelf Junction Panel JPI300 Base StationsCcSpectraLink 6000 System SpectraLink 6000 Wireless TelephonesSpectraLink OAI Gateway Operator’s ConsoleSite Preparation Required hardware Required Materials Provided by CustomerOperator’s Console PC System administratorUnion labor Prepare Location for ShelvesRack mounting Prepare rack or wallSpectraLink 6300 MCU Facility Preparation Wall mounting Wire specifications Prepare Power for ShelvesRun Cables to Base Station Locations Pull cable Terminate Cables at Base Station Locations Interface Type Prepare Demarc BlocksTwo-wire analog or digital interface Multiple power pairsFour-wire digital interface Program Telephone System Install Demarc BlocksAssign and program ports Site Preparation Telephone Ports Base Station Power Pairs Data Two-wire analog or digital demarc blockBase Station Power Pairs Data Four-wire digital demarc blockFour-wire Digital Connector B Connect demarc block 25-pair cable Page Facility Analysis System InstallationCheck Components SpectraLink 6300 MCU Facility Preparation Rack mount Install ShelvesWall mount Connect Power to Shelves Install Intershelf Junction PanelRun conduit to shelf Connect wire to terminalsInstall Interface Modules Install CardsInstall Expansion Shelf Controllers CSC300 Do not install any card in slot 1 of expansion shelves Connect the Intershelf Junction Panel Connect Demarc Block RJ-21Cables to Interface Module Mount Base Stations on Dropped Tile Ceilings Install Base StationsMount Base Stations on Finished Ceilings Wire outdoor Base Stations Install Outdoor Base StationsMount and connect outdoor Base Stations Power Up and Check Diagnostics System Initialization Page Voice-test each Base Station Test SystemRun Listen Verify Diagnostic Site Certification Page Site Preparation Checklist Installation FormsSpectraLink 6300 MCU Facility Preparation Shelf Number Interface Module Base Station Location WorksheetShelf Interface Module Extension Assignments WorksheetCustomer Acceptance Form SpectraLink 6300 MCU Facility Preparation Important Safety Information Safety NoticesPage Index OAI