Polycom
JPI300, MCS300, 1725-36122-001
manual
Specs
Install
System administrator
Four-wire digital interface
Power Up and Check Diagnostics
Checklist
Safety
Multiple power pairs
Page 58
Page 57
Page 59
Image 58
Page 57
Page 59
Contents
SpectraLink 6300 MCU Installation
Patent Information
Polycom Model Numbers
About This Guide
Related Documents
Customer Support
Icons and Conventions
Contents
Site Certification Installation Forms
System Installation
Install Base Stations
System Initialization Test System
Index53H
Page
Installation Overview
Installation Steps and Responsibilities
Install Shelves and Interface Modules
SpectraLink 6000 System Description
SpectraLink 6000 System
Master Control Unit
SpectraLink 6000 System Components
SpectraLink 6000 System topology
Shelf 1 Primary Shelf Intershelf Junction Panel
Expansion Shelf CSC300, CSO300
Shelf
System Controller CSC or CSO301, 306,
Interface Modules CPA, CPU, CPM, CPP, CPF316
Base Stations
Intershelf Junction Panel JPI300
SpectraLink 6000 Wireless Telephones
CcSpectraLink 6000 System
Operator’s Console
SpectraLink OAI Gateway
Site Preparation
Required Materials Provided by Customer
Required hardware
System administrator
Operator’s Console PC
Prepare Location for Shelves
Union labor
Prepare rack or wall
Rack mounting
SpectraLink 6300 MCU Facility Preparation
Wall mounting
Wire specifications
Prepare Power for Shelves
Run Cables to Base Station Locations
Pull cable
Terminate Cables at Base Station Locations
Prepare Demarc Blocks
Interface Type
Multiple power pairs
Two-wire analog or digital interface
Four-wire digital interface
Program Telephone System
Install Demarc Blocks
Assign and program ports
Site Preparation
Two-wire analog or digital demarc block
Telephone Ports Base Station Power Pairs Data
Four-wire digital demarc block
Base Station Power Pairs Data
Four-wire Digital Connector B
Connect demarc block 25-pair cable
Page
Facility Analysis
System Installation
Check Components
SpectraLink 6300 MCU Facility Preparation
Rack mount
Install Shelves
Wall mount
Install Intershelf Junction Panel
Connect Power to Shelves
Connect wire to terminals
Run conduit to shelf
Install Cards
Install Interface Modules
Install Expansion Shelf Controllers CSC300
Do not install any card in slot 1 of expansion shelves
Connect the Intershelf Junction Panel
Connect Demarc Block RJ-21Cables to Interface Module
Install Base Stations
Mount Base Stations on Dropped Tile Ceilings
Mount Base Stations on Finished Ceilings
Wire outdoor Base Stations
Install Outdoor Base Stations
Mount and connect outdoor Base Stations
Power Up and Check Diagnostics
System Initialization
Page
Test System
Voice-test each Base Station
Run Listen Verify Diagnostic
Site Certification
Page
Installation Forms
Site Preparation Checklist
SpectraLink 6300 MCU Facility Preparation
Base Station Location Worksheet
Shelf Number Interface Module
Extension Assignments Worksheet
Shelf Interface Module
Customer Acceptance Form
SpectraLink 6300 MCU Facility Preparation
Safety Notices
Important Safety Information
Page
Index
OAI
Related pages
Troubleshooting and tips Cause for Fujitsu A512
Other specifications for Sharp AR-160
Error message about reception of broadcast for Sharp LC 52SB55U
DSS2455/DSS2465 Flow Chart for Uniden DSS2465
HOW to Check Movement for Daewoo DWF-802
Installation de la table de cuisson for Samsung NZ63K5727BK/EF
Battery KIT Parts List for Powermate PM0557501
TV Brand Code List for Samsung HT-BD1220R/EDC
How do I configure
ACPI S5 state
in my MSI BIOS?
Top
Page
Image
Contents