Polycom 1725-36122-001, MCS300, JPI300 manual Installation Forms, Site Preparation Checklist

Page 59

10

Installation Forms

This section contains the following forms:

Site Preparation Checklist

Base Station Location Worksheet

Extension Assignments Worksheet

Customer Acceptance Form

Copy these forms as needed. Be sure to maintain completed forms for future reference.

Site Preparation Checklist

If upon arrival the Polycom field service engineer determines that the pre-installation work has not been completed correctly, the engineer has two options: 1) the engineer can leave the site and reschedule the installation when the action items have been completed or corrected, or 2) the engineer can assist in preparing the site, and thus spend additional time installing the system. Because of the additional cost incurred by Polycom in executing either option, the customer will be billed for the additional time at the standard hourly rate plus expenses.

Please be sure the following items are completed.

†MCU location prepared. Typically the MCU is installed in the telephone equipment room. This location must have sufficient rack or backboard space and power available.

†Two-pair wires are run to each of the Base Station locations as designated on the building floor plans. Use Level 3 cable for lengths up to 3,500 feet; Level 4 for lengths up to 6,000 feet.

†The Base Station cables are terminated with RJ-45 crimp-on plugs at the designated locations.

†One (or two) cross-connect block(s) are installed for every Interface Module and connected with a 25-pair Telco cable terminated with an RJ-21 male connector at the MCU location.

PN: 1725-36122-001_M.doc

59

Image 59
Contents SpectraLink 6300 MCU Installation Patent Information Related Documents About This GuidePolycom Model Numbers Icons and Conventions Customer SupportContents System Initialization Test System System InstallationInstall Base Stations Site Certification Installation FormsIndex53H Page Installation Overview Install Shelves and Interface Modules Installation Steps and ResponsibilitiesSpectraLink 6000 System Description SpectraLink 6000 System SpectraLink 6000 System topology SpectraLink 6000 System ComponentsMaster Control Unit Shelf 1 Primary Shelf Intershelf Junction Panel Interface Modules CPA, CPU, CPM, CPP, CPF316 ShelfSystem Controller CSC or CSO301, 306, Expansion Shelf CSC300, CSO300Intershelf Junction Panel JPI300 Base StationsCcSpectraLink 6000 System SpectraLink 6000 Wireless TelephonesSpectraLink OAI Gateway Operator’s ConsoleSite Preparation Required hardware Required Materials Provided by CustomerOperator’s Console PC System administratorUnion labor Prepare Location for ShelvesRack mounting Prepare rack or wallSpectraLink 6300 MCU Facility Preparation Wall mounting Run Cables to Base Station Locations Prepare Power for ShelvesWire specifications Pull cable Terminate Cables at Base Station Locations Interface Type Prepare Demarc BlocksTwo-wire analog or digital interface Multiple power pairsFour-wire digital interface Assign and program ports Install Demarc BlocksProgram Telephone System Site Preparation Telephone Ports Base Station Power Pairs Data Two-wire analog or digital demarc blockBase Station Power Pairs Data Four-wire digital demarc blockFour-wire Digital Connector B Connect demarc block 25-pair cable Page Check Components System InstallationFacility Analysis SpectraLink 6300 MCU Facility Preparation Wall mount Install ShelvesRack mount Connect Power to Shelves Install Intershelf Junction PanelRun conduit to shelf Connect wire to terminalsInstall Interface Modules Install CardsInstall Expansion Shelf Controllers CSC300 Do not install any card in slot 1 of expansion shelves Connect the Intershelf Junction Panel Connect Demarc Block RJ-21Cables to Interface Module Mount Base Stations on Dropped Tile Ceilings Install Base StationsMount Base Stations on Finished Ceilings Mount and connect outdoor Base Stations Install Outdoor Base StationsWire outdoor Base Stations Power Up and Check Diagnostics System Initialization Page Voice-test each Base Station Test System Run Listen Verify Diagnostic Site Certification Page Site Preparation Checklist Installation FormsSpectraLink 6300 MCU Facility Preparation Shelf Number Interface Module Base Station Location WorksheetShelf Interface Module Extension Assignments WorksheetCustomer Acceptance Form SpectraLink 6300 MCU Facility Preparation Important Safety Information Safety NoticesPage Index OAI