Polycom MCS300, JPI300, 1725-36122-001 manual Installation Overview

Page 9

1

Installation Overview

Installation has three phases. In most cases, a separate person is responsible for each phase.

1.Site preparation and wire installation: Usually done by a wire technician or contractor, with the assistance of a customer representative such as a project manager. Please refer to the SpectraLink 6300 MCU: Facility Preparation manual for more information.

2.Installing the SpectraLink system: Done by Polycom or one of our certified distributors.

3.Programming the customer’s telephone system to work with the SpectraLink system: Usually done by the customer’s system administrator or technician. Please refer to the LinkPlus Interface Guide for instructions on programming the telephone system at the local site.

Because these major steps require some parallel activities, it is important to coordinate the activities among the persons involved.The following table lists the installation steps and the person typically responsible for each step.

PN: 1725-36122-001_M.doc

9

Image 9
Contents SpectraLink 6300 MCU Installation Patent Information About This Guide Polycom Model NumbersRelated Documents Icons and Conventions Customer SupportContents Install Base Stations System Installation Site Certification Installation Forms System Initialization Test SystemIndex53H Page Installation Overview Install Shelves and Interface Modules Installation Steps and ResponsibilitiesSpectraLink 6000 System Description SpectraLink 6000 System SpectraLink 6000 System Components Master Control UnitSpectraLink 6000 System topology Shelf 1 Primary Shelf Intershelf Junction Panel System Controller CSC or CSO301, 306, ShelfExpansion Shelf CSC300, CSO300 Interface Modules CPA, CPU, CPM, CPP, CPF316Intershelf Junction Panel JPI300 Base StationsCcSpectraLink 6000 System SpectraLink 6000 Wireless TelephonesSpectraLink OAI Gateway Operator’s ConsoleSite Preparation Required hardware Required Materials Provided by CustomerOperator’s Console PC System administratorUnion labor Prepare Location for ShelvesRack mounting Prepare rack or wallSpectraLink 6300 MCU Facility Preparation Wall mounting Prepare Power for Shelves Wire specificationsRun Cables to Base Station Locations Pull cable Terminate Cables at Base Station Locations Interface Type Prepare Demarc BlocksTwo-wire analog or digital interface Multiple power pairsFour-wire digital interface Install Demarc Blocks Program Telephone SystemAssign and program ports Site Preparation Telephone Ports Base Station Power Pairs Data Two-wire analog or digital demarc blockBase Station Power Pairs Data Four-wire digital demarc blockFour-wire Digital Connector B Connect demarc block 25-pair cable Page System Installation Facility AnalysisCheck Components SpectraLink 6300 MCU Facility Preparation Install Shelves Rack mountWall mount Connect Power to Shelves Install Intershelf Junction PanelRun conduit to shelf Connect wire to terminalsInstall Interface Modules Install CardsInstall Expansion Shelf Controllers CSC300 Do not install any card in slot 1 of expansion shelves Connect the Intershelf Junction Panel Connect Demarc Block RJ-21Cables to Interface Module Mount Base Stations on Dropped Tile Ceilings Install Base StationsMount Base Stations on Finished Ceilings Install Outdoor Base Stations Wire outdoor Base StationsMount and connect outdoor Base Stations Power Up and Check Diagnostics System Initialization Page Voice-test each Base Station Test SystemRun Listen Verify Diagnostic Site Certification Page Site Preparation Checklist Installation FormsSpectraLink 6300 MCU Facility Preparation Shelf Number Interface Module Base Station Location WorksheetShelf Interface Module Extension Assignments WorksheetCustomer Acceptance Form SpectraLink 6300 MCU Facility Preparation Important Safety Information Safety NoticesPage Index OAI