Polycom MCS300, JPI300, 1725-36122-001 Install Intershelf Junction Panel, Connect Power to Shelves

Page 42

SpectraLink 6300 MCU: Facility Preparation

Install Intershelf Junction Panel

The Intershelf Junction Panel (JPI300) is to be installed only in restricted access areas (dedicated equipment rooms, equipment closets, or the like), in accordance with Articles 110-16, 110-17, and 110-18 of the NEC, ANSI/N FPA 70.

The expansion shelf controllers of shelves 2 through 20 are connected to the system controller by an intershelf junction panel. The panel converts the RJ-21 connections on the system controller to the RJ-45 connections on the expansion shelf controller.

Install the panel in the rack or on the wall adjacent to the Primary Shelf, which contains the system controller (CSC306 or CSC320).

Wall mounting requires 1.75” #8 panhead wood screws. The panel must be mounted with standoffs at least 1.5” long and 1/4” inside diameter.

Connect Power to Shelves

Polycom recommends that a licensed electrician install the -48V DC power supply and connect power to the shelves.

When connecting the -48 V DC system to power, note the following precautions:

A 30 amp circuit breaker must be present on the non-grounded DC circuit conductor, and the installer must ensure that means are provided for connection of the equipment to the DC source by permanent wiring methods, and no disconnecting device is located in the grounded DC circuit conductor between the point of connection to the supply and the point of connection to the grounding electrode and equipment grounding conductors.

The DC input to the power supply is polarity sensitive. Incorrect hookup will prevent normal operation of the system and may cause damage. Double check polarities before making any connections. Verify that the DC power switch on each shelf is OFF.

42

PN: 1725-36122-001_M.doc

Image 42
Contents SpectraLink 6300 MCU Installation Patent Information About This Guide Polycom Model NumbersRelated Documents Customer Support Icons and ConventionsContents Site Certification Installation Forms System InstallationInstall Base Stations System Initialization Test SystemIndex53H Page Installation Overview Installation Steps and Responsibilities Install Shelves and Interface ModulesSpectraLink 6000 System Description SpectraLink 6000 System SpectraLink 6000 System Components Master Control UnitSpectraLink 6000 System topology Shelf 1 Primary Shelf Intershelf Junction Panel Expansion Shelf CSC300, CSO300 ShelfSystem Controller CSC or CSO301, 306, Interface Modules CPA, CPU, CPM, CPP, CPF316Base Stations Intershelf Junction Panel JPI300SpectraLink 6000 Wireless Telephones CcSpectraLink 6000 SystemOperator’s Console SpectraLink OAI GatewaySite Preparation Required Materials Provided by Customer Required hardwareSystem administrator Operator’s Console PCPrepare Location for Shelves Union laborPrepare rack or wall Rack mountingSpectraLink 6300 MCU Facility Preparation Wall mounting Prepare Power for Shelves Wire specificationsRun Cables to Base Station Locations Pull cable Terminate Cables at Base Station Locations Prepare Demarc Blocks Interface TypeMultiple power pairs Two-wire analog or digital interfaceFour-wire digital interface Install Demarc Blocks Program Telephone SystemAssign and program ports Site Preparation Two-wire analog or digital demarc block Telephone Ports Base Station Power Pairs DataFour-wire digital demarc block Base Station Power Pairs DataFour-wire Digital Connector B Connect demarc block 25-pair cable Page System Installation Facility AnalysisCheck Components SpectraLink 6300 MCU Facility Preparation Install Shelves Rack mountWall mount Install Intershelf Junction Panel Connect Power to ShelvesConnect wire to terminals Run conduit to shelfInstall Cards Install Interface ModulesInstall Expansion Shelf Controllers CSC300 Do not install any card in slot 1 of expansion shelves Connect the Intershelf Junction Panel Connect Demarc Block RJ-21Cables to Interface Module Install Base Stations Mount Base Stations on Dropped Tile CeilingsMount Base Stations on Finished Ceilings Install Outdoor Base Stations Wire outdoor Base StationsMount and connect outdoor Base Stations Power Up and Check Diagnostics System Initialization Page Test System Voice-test each Base StationRun Listen Verify Diagnostic Site Certification Page Installation Forms Site Preparation ChecklistSpectraLink 6300 MCU Facility Preparation Base Station Location Worksheet Shelf Number Interface ModuleExtension Assignments Worksheet Shelf Interface ModuleCustomer Acceptance Form SpectraLink 6300 MCU Facility Preparation Safety Notices Important Safety InformationPage Index OAI