Polycom 1725-36122-001, MCS300, JPI300 manual Oai

Page 68

SpectraLink 6300 MCU: Facility Preparation

Location

22

O

 

OAI

 

Part Numbers

15

Ports

15

System Controller Card

15

Open Application Interface

See OAI

Operator's Console

 

Specifications

21

Operator's Console

18

P

 

Power

 

Clearance

24

Connecting to Shelves

42

Controller

20

MCU

26

Pairs

27

Shelf requirements

15

Q

 

Quick Clip Fuse

20

R

 

Rack mounting

23

Required materials

20

RS-232 ports

15

S

 

Shelves

 

Description

15

Installing

41

Mounting

23

Site Certification

57

Site preparation

19

Site preparation checklist

59

System administrator

21

System Controller

 

Description

15

Installing

44

T

 

Testing the system

55

Traffic planning

32

U

 

Union labor

22

V

 

Voice test

55

W

 

Wall mounting

23

Wireless Telephone

 

Description

17

Test

55

68

PN: 1725-36122-001_M.doc

Image 68
Contents SpectraLink 6300 MCU Installation Patent Information Related Documents About This GuidePolycom Model Numbers Customer Support Icons and ConventionsContents System Installation Install Base StationsSite Certification Installation Forms System Initialization Test SystemIndex53H Page Installation Overview Installation Steps and Responsibilities Install Shelves and Interface ModulesSpectraLink 6000 System Description SpectraLink 6000 System SpectraLink 6000 System topology SpectraLink 6000 System ComponentsMaster Control Unit Shelf 1 Primary Shelf Intershelf Junction Panel Shelf System Controller CSC or CSO301, 306,Expansion Shelf CSC300, CSO300 Interface Modules CPA, CPU, CPM, CPP, CPF316Base Stations Intershelf Junction Panel JPI300SpectraLink 6000 Wireless Telephones CcSpectraLink 6000 SystemOperator’s Console SpectraLink OAI GatewaySite Preparation Required Materials Provided by Customer Required hardwareSystem administrator Operator’s Console PCPrepare Location for Shelves Union laborPrepare rack or wall Rack mountingSpectraLink 6300 MCU Facility Preparation Wall mounting Run Cables to Base Station Locations Prepare Power for ShelvesWire specifications Pull cable Terminate Cables at Base Station Locations Prepare Demarc Blocks Interface TypeMultiple power pairs Two-wire analog or digital interfaceFour-wire digital interface Assign and program ports Install Demarc BlocksProgram Telephone System Site Preparation Two-wire analog or digital demarc block Telephone Ports Base Station Power Pairs DataFour-wire digital demarc block Base Station Power Pairs DataFour-wire Digital Connector B Connect demarc block 25-pair cable Page Check Components System InstallationFacility Analysis SpectraLink 6300 MCU Facility Preparation Wall mount Install ShelvesRack mount Install Intershelf Junction Panel Connect Power to ShelvesConnect wire to terminals Run conduit to shelfInstall Cards Install Interface ModulesInstall Expansion Shelf Controllers CSC300 Do not install any card in slot 1 of expansion shelves Connect the Intershelf Junction Panel Connect Demarc Block RJ-21Cables to Interface Module Install Base Stations Mount Base Stations on Dropped Tile CeilingsMount Base Stations on Finished Ceilings Mount and connect outdoor Base Stations Install Outdoor Base StationsWire outdoor Base Stations Power Up and Check Diagnostics System Initialization Page Test System Voice-test each Base StationRun Listen Verify Diagnostic Site Certification Page Installation Forms Site Preparation ChecklistSpectraLink 6300 MCU Facility Preparation Base Station Location Worksheet Shelf Number Interface ModuleExtension Assignments Worksheet Shelf Interface ModuleCustomer Acceptance Form SpectraLink 6300 MCU Facility Preparation Safety Notices Important Safety InformationPage Index OAI