Polycom 1725-36122-001, MCS300, JPI300 manual Prepare rack or wall, Rack mounting

Page 23

Site Preparation

Space for the shelves, which are designed for 19” rack or wall mounting.

Each shelf measures 15” high x 19” wide x 9” deep, and weighs approximately 35 pounds fully loaded.

Expansion shelves cannot be located more than 17 cable feet from the Primary Shelf.

All digital interface modules must be within 250 feet of the telephone system.

See your telephone system specifications for distance limitations for analog modules.

Location of the Intershelf Junction Panel (JPI300) adjacent to the shelves on a multi-shelf system.

The Primary Shelf containing the System Controller (CSC or CSO306 or 320) must be mounted to allow connection to the JPI300 with a five-foot cable.

Expansion Shelves (CSC300 or CSO300) must be mounted to allow connection of the shelf to the JPI300 using 12 feet or less of cabling.

Space for the -48V power supply connections. Power supply conduit requires clearance of 1.5” on the rear or side of the shelves.

Maximum loop length specifications of the telephone system

Maximum wire distance from the MCU to a Base Station (6,000 feet)

Cabling for the Interface Modules and Controller cards. All cables (except power) are connected to the front face of the cards. Space is provided to route wiring to the back of the shelf.

Prepare rack or wall

The SpectraLink 6300 MCU can be mounted in a rack or on the wall. Rack or wall support must be adequate to support the number of shelves to be installed. Each fully loaded SpectraLink 6300 MCU shelf weighs approximately 35 pounds.

Rack mounting

Before installing shelves in a rack, be sure the rack is mechanically fastened to the floor or wall such that it properly supports the number

PN: 1725-36122-001_M.doc

23

Image 23
Contents SpectraLink 6300 MCU Installation Patent Information Related Documents About This GuidePolycom Model Numbers Icons and Conventions Customer SupportContents System Initialization Test System System InstallationInstall Base Stations Site Certification Installation FormsIndex53H Page Installation Overview Install Shelves and Interface Modules Installation Steps and ResponsibilitiesSpectraLink 6000 System Description SpectraLink 6000 System SpectraLink 6000 System topology SpectraLink 6000 System ComponentsMaster Control Unit Shelf 1 Primary Shelf Intershelf Junction Panel Interface Modules CPA, CPU, CPM, CPP, CPF316 ShelfSystem Controller CSC or CSO301, 306, Expansion Shelf CSC300, CSO300Intershelf Junction Panel JPI300 Base StationsCcSpectraLink 6000 System SpectraLink 6000 Wireless TelephonesSpectraLink OAI Gateway Operator’s ConsoleSite Preparation Required hardware Required Materials Provided by CustomerOperator’s Console PC System administratorUnion labor Prepare Location for ShelvesRack mounting Prepare rack or wallSpectraLink 6300 MCU Facility Preparation Wall mounting Run Cables to Base Station Locations Prepare Power for ShelvesWire specifications Pull cable Terminate Cables at Base Station Locations Interface Type Prepare Demarc BlocksTwo-wire analog or digital interface Multiple power pairsFour-wire digital interface Assign and program ports Install Demarc BlocksProgram Telephone System Site Preparation Telephone Ports Base Station Power Pairs Data Two-wire analog or digital demarc blockBase Station Power Pairs Data Four-wire digital demarc blockFour-wire Digital Connector B Connect demarc block 25-pair cable Page Check Components System InstallationFacility Analysis SpectraLink 6300 MCU Facility Preparation Wall mount Install ShelvesRack mount Connect Power to Shelves Install Intershelf Junction PanelRun conduit to shelf Connect wire to terminalsInstall Interface Modules Install CardsInstall Expansion Shelf Controllers CSC300 Do not install any card in slot 1 of expansion shelves Connect the Intershelf Junction Panel Connect Demarc Block RJ-21Cables to Interface Module Mount Base Stations on Dropped Tile Ceilings Install Base StationsMount Base Stations on Finished Ceilings Mount and connect outdoor Base Stations Install Outdoor Base StationsWire outdoor Base Stations Power Up and Check Diagnostics System Initialization Page Voice-test each Base Station Test SystemRun Listen Verify Diagnostic Site Certification Page Site Preparation Checklist Installation FormsSpectraLink 6300 MCU Facility Preparation Shelf Number Interface Module Base Station Location WorksheetShelf Interface Module Extension Assignments WorksheetCustomer Acceptance Form SpectraLink 6300 MCU Facility Preparation Important Safety Information Safety NoticesPage Index OAI