
SpectraLink 6300 MCU: Facility Preparation
The following items should be at the installation site.
SpectraLink 6300 MCU Shelves (MCS300) Depending on the size of the system, there may be up to 20 shelves.
SpectraLink 6000 System MCU Administration Kit (MKA320) Includes a grounding strap to protect cards from electrostatic discharge; an external modem for remote access to the system; and documentation including a User Guide for each handset, and a videotape that explains basic usage of the handset.
System Controller Card (CSC301, CSC306, or CSC320) One card for each system. This card is double width and installed in slots 1 and 2 of the Primary Shelf.
OAI System Controller Card (CSO301, CSO306, CSO320) On systems that support OAI, one card for each system. Expansion shelves must be equipped with OAI enabled system controllers (CSO300).
Expansion Shelf Controller Card (CSC300 or CSO300) One card for each Expansion Shelf. This card is installed in slot 2 and connected to the system controller by an Intershelf Junction Panel.
Cables Two
Interface Modules The correct number and type of Interface Modules to connect the handsets and the Base Stations to the telephone system. Interface Modules can support analog (CPA316), Universal (CPU316), Panasonic (CPP316),
Intershelf Junction Panel (JPI300) Converts the
Wireless Telephones The correct number of handheld Wireless Telephones (PTB400 or PTB410) for this installation.
Battery Packs The system may have one or more spare Battery Packs per handset, depending on the needs at your location.
Battery Chargers SpectraLink 6000 Wireless Telephones require a Battery Charging system, usually one per handset.
Base Stations The correct number of indoor (RCC400), outdoor (RCO400), or
Base Station Mounting Hardware A ceiling clip and plastic bolt used to attach each Base Station to the
40 | PN: |