Polycom JPI300, MCS300, 1725-36122-001 manual SpectraLink 6300 MCU Facility Preparation

Page 40

SpectraLink 6300 MCU: Facility Preparation

The following items should be at the installation site.

†SpectraLink 6300 MCU Shelves (MCS300) Depending on the size of the system, there may be up to 20 shelves.

†SpectraLink 6000 System MCU Administration Kit (MKA320) Includes a grounding strap to protect cards from electrostatic discharge; an external modem for remote access to the system; and documentation including a User Guide for each handset, and a videotape that explains basic usage of the handset.

†System Controller Card (CSC301, CSC306, or CSC320) One card for each system. This card is double width and installed in slots 1 and 2 of the Primary Shelf.

†OAI System Controller Card (CSO301, CSO306, CSO320) On systems that support OAI, one card for each system. Expansion shelves must be equipped with OAI enabled system controllers (CSO300).

†Expansion Shelf Controller Card (CSC300 or CSO300) One card for each Expansion Shelf. This card is installed in slot 2 and connected to the system controller by an Intershelf Junction Panel.

†Cables Two 12-foot RJ-45 cables with each Expansion Shelf Controller (CSC300).

†Interface Modules The correct number and type of Interface Modules to connect the handsets and the Base Stations to the telephone system. Interface Modules can support analog (CPA316), Universal (CPU316), Panasonic (CPP316), four-wire (CPF316) or Mitel (CPM316) interfaces.

†Intershelf Junction Panel (JPI300) Converts the RJ-21 connections on the System Controller Card to the RJ-45 connections on the Expansion Shelf Controller Card. Includes one RJ-21 Male/Female cable, five feet long, to connect the Primary Shelf to the JPI300.

†Wireless Telephones The correct number of handheld Wireless Telephones (PTB400 or PTB410) for this installation.

†Battery Packs The system may have one or more spare Battery Packs per handset, depending on the needs at your location.

†Battery Chargers SpectraLink 6000 Wireless Telephones require a Battery Charging system, usually one per handset.

†Base Stations The correct number of indoor (RCC400), outdoor (RCO400), or high-density (RCH400) models for this installation.

†Base Station Mounting Hardware A ceiling clip and plastic bolt used to attach each Base Station to the T-bar ceiling tile grid.

40

PN: 1725-36122-001_M.doc

Image 40
Contents SpectraLink 6300 MCU Installation Patent Information Polycom Model Numbers About This GuideRelated Documents Customer Support Icons and ConventionsContents System Installation Install Base StationsSite Certification Installation Forms System Initialization Test SystemIndex53H Page Installation Overview Installation Steps and Responsibilities Install Shelves and Interface ModulesSpectraLink 6000 System Description SpectraLink 6000 System Master Control Unit SpectraLink 6000 System ComponentsSpectraLink 6000 System topology Shelf 1 Primary Shelf Intershelf Junction Panel Shelf System Controller CSC or CSO301, 306,Expansion Shelf CSC300, CSO300 Interface Modules CPA, CPU, CPM, CPP, CPF316Base Stations Intershelf Junction Panel JPI300SpectraLink 6000 Wireless Telephones CcSpectraLink 6000 SystemOperator’s Console SpectraLink OAI GatewaySite Preparation Required Materials Provided by Customer Required hardwareSystem administrator Operator’s Console PCPrepare Location for Shelves Union laborPrepare rack or wall Rack mountingSpectraLink 6300 MCU Facility Preparation Wall mounting Wire specifications Prepare Power for ShelvesRun Cables to Base Station Locations Pull cable Terminate Cables at Base Station Locations Prepare Demarc Blocks Interface TypeMultiple power pairs Two-wire analog or digital interfaceFour-wire digital interface Program Telephone System Install Demarc BlocksAssign and program ports Site Preparation Two-wire analog or digital demarc block Telephone Ports Base Station Power Pairs DataFour-wire digital demarc block Base Station Power Pairs DataFour-wire Digital Connector B Connect demarc block 25-pair cable Page Facility Analysis System InstallationCheck Components SpectraLink 6300 MCU Facility Preparation Rack mount Install ShelvesWall mount Install Intershelf Junction Panel Connect Power to ShelvesConnect wire to terminals Run conduit to shelfInstall Cards Install Interface ModulesInstall Expansion Shelf Controllers CSC300 Do not install any card in slot 1 of expansion shelves Connect the Intershelf Junction Panel Connect Demarc Block RJ-21Cables to Interface Module Install Base Stations Mount Base Stations on Dropped Tile CeilingsMount Base Stations on Finished Ceilings Wire outdoor Base Stations Install Outdoor Base StationsMount and connect outdoor Base Stations Power Up and Check Diagnostics System Initialization Page Test System Voice-test each Base StationRun Listen Verify Diagnostic Site Certification Page Installation Forms Site Preparation ChecklistSpectraLink 6300 MCU Facility Preparation Base Station Location Worksheet Shelf Number Interface ModuleExtension Assignments Worksheet Shelf Interface ModuleCustomer Acceptance Form SpectraLink 6300 MCU Facility Preparation Safety Notices Important Safety InformationPage Index OAI