Hitachi L300P Series service manual Maintenance and Inspection

Page 30

5. Maintenance and Inspection

5.1 Maintenance and Inspection

5.1.1 Daily inspection

Main check points to be done while operation are as follows.

(1)Whether the motor rotates as expected.

(2)Whether the installation condition have no problem.

(3)Whether there is no problem in cooling.

(4)Whether there is any abnormal vibration and noise.

(5)Whether there is any abnormal temperature rising and change in color.

(6)Whether there is any abnormal smell.

Measure the input voltage of the inverter by a tester while operation to confirm the followings.

(1)No frequent voltage fluctuation.

(2)All line voltages are balanced and stable.

5.1.2Cleaning

Always keep the inverter clean.

Use soft cloth dipped with neutrality detergent or ethanol and wipe the dirty portion with care.

(note) Do not use such as acetone, benzene, toluene or alcohol which may damage the coating of the inverter.

5.1.3 Periodical inspection

Check the portions where the inverter must not be in operation.

Please contact HITACHI for a periodical inspection.

(1)Is there any abnormality in cooling? ---- Cleaning of air filter.

(2)Tightening check and additional tightening. ---- Loose tightening of the screws and bolts could occur due to vibrations and/or temperature changing. Be sure to confirm carefully.

(3)Isn’t there any corrosion or damage in the conductors?

(4)Measurement of insulation resistance.

(5)Check and replace of cooling fan, DC bus capacitors and relays if necessary.

5- 1

Image 30
Contents Hitachi Inverter Revision History Table Inverter specification Investigation of the inverter Inverter specification 1 SJ300Function Mode Code 2nd motor Signal output mode Others Allowable motor selection 20-75.0kW 160kW User 2 L300P FE/-FU/-FR PID Terminal Meter C083 O2 adjustment 9999./1000-655310000-65530 U006 User6 selection Trouble Shooting Inverter trip contents, remedy, adviceIgbt Option error Feed-back board SJ-FB Digital-input option board SJ-DGDevice- Net option board SJ-DN Check of the trip monitor contents Check of the warning monitor contents Return to an initialization setup Factory-shipment state Debug Mode Monitor modeFunction mode USASetup of an inverter Setting procedureInitial cofiguration completion check procedure Model selection code C198 Code SJ300 L300P Control power supply Control signalMaintenance and Inspection Daily and annual maintenance Megger test How to check inverter & converter portion Parts replacement How to remove cooling fan for steel case How to fix DC bus capacitors for mold case Unit replacement English Internal block diagram SJ300-004-007LF Circuit Diagram SJ300-015 055LF Circuit Diagram SJ300-075-110LF , L300P-110-150LFR Circuit Diagram SJ300-150 220LF , L300P-185 300LFR Circuit Diagram SJ300-300LF, L300P-370LFR Circuit Diagram SJ300-370-450LF, L300P-450-550LFR Circuit Diagram SJ300-550LF,L300P-750LFR Circuit Diagram SJ300-007HF Circuit Diagram SJ300-015-055HF Circuit Diagram SJ300-075-110HF , L300P-110-150HFR Circuit Diagram SJ300-150 220HF , L300P-185 300HFR Circuit Diagram SJ300-300HF , L300P-370HFR Circuit Diagram SJ300-370- 550HF,L300P-450-750HFR Circuit Diagram DM Board SJ300-750-1320HF , L300P-900-1320HFR Circuit Diagram Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page SJ300/L300P Series Spare Parts List SJ3 CT PCB DM PCB NGMB25