Grizzly G0647, G0646 owner manual Bolster Mounting Hex Bolts 4 shown

Page 26

7.Use the spanner wrench to fully tighten the punch assembly onto the pressure plate.

8.Insert the die into the punch bolster with the larger opening down, but do not tighten the set screws (see Figure 22).

9.Set the controls to Punch and Inch, then reconnect the machine to power.

10.Turn the machine ON, press the foot actua- tor to bring the punch near—but not into—the die, then stop the motor.

11.Press the emergency stop button to avoid unexpected movement of the tooling.

12.Align the die with the punch, then tighten the set screws on both sides of the punch bolster to hold the die in place.

Note: If you have difficulty aligning the punch with the die, you may have to reposition the punch bolster. Use a 19mm wrench to loosen the bolster mounting hex bolts (see Figure 23), move the bolster and die into alignment with the punch, then re-tighten the hex bolts.

13.Properly re-position the stripper and safety guard assembly, reset the emergency stop button, then continue to jog the punch toward the die.

Note: Be prepared to quickly lift your foot from the pedal actuator to stop the punch if you suspect a mis-alignment or other prob- lem.

14.Set the controls to Normal, then move the punch in and out of the die several times to ensure proper operation of the tooling before mounting a workpiece onto the table.

To avoid tooling or workpiece breakage and the risk of possible injury to the operator, never attempt to cut a workpiece that is not adequately supported and held in place. Never attempt a cutting operation that is beyond the capacity of your machine.

Bolster

Mounting Hex Bolts

(2 of 4 shown)

Figure 23. Punching bolster mounting hex bolts.

-24-

G0646/G0647 50/65 Ton Ironworker

Image 26
Contents 50/65 TON Ironworker Page Table of Contents Contact Info IntroductionForeword Functional Overview Identification G0646 Machine Data Sheet G0646/G0647 50/65 Ton Ironworker G0647 Machine Data Sheet G0646/G0647 50/65 Ton Ironworker Safety Instructions for Machinery G0646/G0647 50/65 Ton Ironworker Additional Safety Instructions for Ironworkers Additional Safety Instructions for Hydraulics Circuit Requirements Power Supply Circuit RequirementsPower Connection Device 220/440V OperationTo rewire the Model G0646/G0647 for 440V operation 440V ConversionItems Needed for Setup SetupSetup Safety UnpackingInventory Clean Up Inventory Figure QtyMoving & Placing Base Unit Placement LocationSite Considerations Floor LoadBolting to Concrete Floors Using Machine MountsMounting to Shop Floor Test Run To test run the machineRecommended Adjustments Factory adjustments that should be verifiedBasic Controls Operation SafetyOperations Punching Using the Punching StationOperation Tips Motor Stop Button Turns the motor OFFTo remove punch tooling Removing/Installing Punch ToolingTools Needed Qty To install punch tooling Punch, adapter, retaining ring, Die installedBolster Mounting Hex Bolts 4 shown Notching Using the Notching StationRemoving & Installing Notch Dies To install the notch dies Notch Die ClearancesPage Flat Stock Shearing To avoid tooling or workpiece breakageTo shear flat stock Bar Stock Shearing To shear bar stockMaking a 90 Cut Extension BarAngle Iron Shearing Making a Less Than 90 Cut Adjusting Stroke Length Beam Lubrication T20448T20452 T20501 T20456 H0736 AccessoriesH7379-Tapmatic#1 Gold 16 oz H7380-Tapmatic#1 Gold 1 Gal Available Tooling Schedule MaintenanceCleaning Protecting Beam Pivot Shaft Shearing Hold-Down Adjustment RodLubrication Support Frame Lubrication Fluid Capacity Hydraulic SystemFilling Hydraulic Reservoir To drain and re-fill the hydraulic reservoir Draining & Re-Filling HydraulicReservoir Beam Alignment To align the beamMotor & Electrical ServiceTroubleshooting Operations Flat Stock Shearing Dies To remove and replace the flat stock shearing diesAngle Iron Shearing Dies To remove the angle iron shearing diesBar Stock Shearing Dies To remove and replace the bar stock shearing diesDisconnect Machine from Power Shearing Table Alignment Hydraulic Fluid Pressure To reset the position of the limit ringsLimit Rings Electrical Panel Wiring Control Panel Wiring Electrical Panel Wiring Diagram Control Panel Wiring Diagram Electrical Components Wiring Diagram Limit switch wiringMotor Wiring Diagram Motor wiring G0646/G0647 50/65 Ton IronworkerHydraulic System Overview Parts G0646 Upper Front-Half Parts List DescriptionG0647 Upper Front-Half Parts List Upper HalfG0646 Upper Rear-Half Parts List G0647 Upper Rear-Half Parts List DescriptionCabinet G0646 Cabinet G0647 Cabinet Notching Station Punching Station Extension Bar & Tools Label Placement Page Page Warranty and Returns