Hydraulic System

Fluid Capacity

 

Hydraulic Reservoir

Approx. 15 gal. (60 L.)

The hydraulic system must be maintained on a regular basis and kept in good operating condition so that the ironworker can perform safely and at the rated capacity.

If you have never maintained a hydraulic system before, WE STRONGLY RECOMMEND that you read books, get formal training, or seek the help of a qualified hydraulic service technician.

NOTICE

Failure to perform regular and proper hydraulic system maintenance and to keep the hydraulic system in good operating condition will lead to premature wear of the moving parts, hoses, and valves, and will void the warranty.

Use the sight glass mounted on the rear of the hydraulic reservoir (see Figure 53) to check the fluid level and temperature. Maintain the fluid level above the red line on the sight glass.

Figure 53. Hydraulic fluid reservoir sight glass (rear access panel removed for photo clarity).

The operating temperature of the hydraulic fluid should not exceed 160°F (70°C) with an optimum operating temperature window of 50–95°F (10– 35°C). If the fluid temperature rises above 160°F, stop the machine immediately and allow the fluid to cool down.

If this condition continues during operation, stop using the machine immediately, then review Troubleshooting on Page 43. If you still cannot remedy the problem, contact a qualified hyraulic service technician or our Tech Support at (570) 546-9663 for assistance.

Filling Hydraulic Reservoir

 

Tools Needed

Qty

Wrench 10mm

1

1.DISCONNECT MACHINE FROM POWER!

2.Remove the rear access panel.

3.Remove the filler cap and add one of the rec- ommended hydraulic fluids from Figure 54 or an equivalent to bring the fluid level in the sight glass above the red line.

Brand

Type

B.P.

Energol HLP 32

 

 

Castrol

Hyspin AWS 82-6018

 

 

Esso

Nuto H32

Mobil

DTE 24

Shell

Tellus 32

Total

Azolla ZS 32

Figure 54. Recommended hydraulic fluids.

BIOLOGICAL AND

POISON HAZARD!

Use proper personal pro- tection equipment when handling hydraulic fluid, and follow federal, state, and fluid manufacturer requirements to proper- ly dispose of hydraulic fluid.

-40-

G0646/G0647 50/65 Ton Ironworker

Image 42
Contents 50/65 TON Ironworker Page Table of Contents Introduction Foreword Functional OverviewContact Info Identification G0646 Machine Data Sheet G0646/G0647 50/65 Ton Ironworker G0647 Machine Data Sheet G0646/G0647 50/65 Ton Ironworker Safety Instructions for Machinery G0646/G0647 50/65 Ton Ironworker Additional Safety Instructions for Ironworkers Additional Safety Instructions for Hydraulics Circuit Requirements Power Supply Circuit RequirementsPower Connection Device 220/440V OperationTo rewire the Model G0646/G0647 for 440V operation 440V ConversionItems Needed for Setup SetupSetup Safety UnpackingInventory Clean Up Inventory Figure QtyMoving & Placing Base Unit Placement LocationSite Considerations Floor LoadUsing Machine Mounts Mounting to Shop FloorBolting to Concrete Floors Test Run To test run the machineRecommended Adjustments Factory adjustments that should be verifiedOperation Safety OperationsBasic Controls Punching Using the Punching StationOperation Tips Motor Stop Button Turns the motor OFFRemoving/Installing Punch Tooling Tools Needed QtyTo remove punch tooling To install punch tooling Punch, adapter, retaining ring, Die installedBolster Mounting Hex Bolts 4 shown Using the Notching Station Removing & Installing Notch DiesNotching To install the notch dies Notch Die ClearancesPage Flat Stock Shearing To avoid tooling or workpiece breakageTo shear flat stock Bar Stock Shearing To shear bar stockExtension Bar Angle Iron ShearingMaking a 90 Cut Making a Less Than 90 Cut Adjusting Stroke Length Beam Lubrication Accessories H7379-Tapmatic#1 Gold 16 oz H7380-Tapmatic#1 Gold 1 GalT20448T20452 T20501 T20456 H0736 Available Tooling Maintenance Cleaning ProtectingSchedule Shearing Hold-Down Adjustment Rod LubricationBeam Pivot Shaft Support Frame Lubrication Hydraulic System Filling Hydraulic ReservoirFluid Capacity Draining & Re-Filling Hydraulic ReservoirTo drain and re-fill the hydraulic reservoir Beam Alignment To align the beamService TroubleshootingMotor & Electrical Operations Flat Stock Shearing Dies To remove and replace the flat stock shearing diesAngle Iron Shearing Dies To remove the angle iron shearing diesBar Stock Shearing Dies To remove and replace the bar stock shearing diesDisconnect Machine from Power Shearing Table Alignment To reset the position of the limit rings Limit RingsHydraulic Fluid Pressure Electrical Panel Wiring Control Panel Wiring Electrical Panel Wiring Diagram Control Panel Wiring Diagram Electrical Components Wiring Diagram Limit switch wiringMotor Wiring Diagram Motor wiring G0646/G0647 50/65 Ton IronworkerHydraulic System Overview Parts G0646 Upper Front-Half Parts List DescriptionG0647 Upper Front-Half Parts List Upper HalfG0646 Upper Rear-Half Parts List G0647 Upper Rear-Half Parts List DescriptionCabinet G0646 Cabinet G0647 Cabinet Notching Station Punching Station Extension Bar & Tools Label Placement Page Page Warranty and Returns