Grizzly G0646, G0647 owner manual

Page 29

5.Install the front die into the bolster and fully secure it with the two cap screws.

6.Thread the side die adjustment set screws on both sides out 2–3 turns (see Figure 29), position the side dies into the bolster, then thread and fully tighten the cap screws through the bolster and into the die to hold them firmly against the bolster.

Set Screws

Cap

Screws

Bolster Hex Bolts

Figure 29. Notching side die set screw, cap

screws, and bolster hex bolts.

7.Set the controls to Notch and Inch, then reconnect the machine to power.

Note: The goal of the next set of procedures is to bring the top die down through the bottom dies so that the clearance between them can be adjusted. It may be necessary to move the bolster forward, as described in Step 10 below, so that the punch can clear the front die.

8.Turn the machine ON, then use the foot actu- ator to bring the top die down into the bottom dies.

Note: When in the Inch mode, lifting your foot from the foot actuator will stop the beam and hold it in that position.

9.Press the emergency stop button to avoid unexpected movement of the tooling.

10.Loosen the bolster hex bolts (see Figure 29), adjust the bolster so that there is a clearance of 3mm between the top and front dies, then re-tighten the bolster hex bolts.

Note: During this step, attempt to evenly dis- tribute the gaps on the sides.

11.Alternately loosen the side die cap screws and adjustment set screws until there is a 1mm gap evenly between the top and side dies (see Figure 30).

���

���

���

���

���

����

 

���

 

����

���

���������

Figure 30. Notching die clearances.

12. Fully tighten the side die cap screws, then recheck all clearances.

13. Re-install the table, front safety guard, and the side stripper plates.

14. Set the controls to Normal, then move the top die in and out of the bottom dies several times to check for correct positioning before continuing with operations.

G0646/G0647 50/65 Ton Ironworker

-27-

Image 29
Contents 50/65 TON Ironworker Page Table of Contents Contact Info IntroductionForeword Functional Overview Identification G0646 Machine Data Sheet G0646/G0647 50/65 Ton Ironworker G0647 Machine Data Sheet G0646/G0647 50/65 Ton Ironworker Safety Instructions for Machinery G0646/G0647 50/65 Ton Ironworker Additional Safety Instructions for Ironworkers Additional Safety Instructions for Hydraulics Power Connection Device Power Supply Circuit RequirementsCircuit Requirements 220/440V Operation440V Conversion To rewire the Model G0646/G0647 for 440V operationSetup Safety SetupItems Needed for Setup UnpackingInventory Figure Qty Inventory Clean UpSite Considerations Placement LocationMoving & Placing Base Unit Floor LoadBolting to Concrete Floors Using Machine MountsMounting to Shop Floor To test run the machine Test RunFactory adjustments that should be verified Recommended AdjustmentsBasic Controls Operation SafetyOperations Operation Tips Using the Punching StationPunching Motor Stop Button Turns the motor OFFTo remove punch tooling Removing/Installing Punch ToolingTools Needed Qty Punch, adapter, retaining ring, Die installed To install punch toolingBolster Mounting Hex Bolts 4 shown Notching Using the Notching StationRemoving & Installing Notch Dies Notch Die Clearances To install the notch diesPage To avoid tooling or workpiece breakage Flat Stock ShearingTo shear flat stock To shear bar stock Bar Stock ShearingMaking a 90 Cut Extension BarAngle Iron Shearing Making a Less Than 90 Cut Adjusting Stroke Length Beam Lubrication T20448T20452 T20501 T20456 H0736 AccessoriesH7379-Tapmatic#1 Gold 16 oz H7380-Tapmatic#1 Gold 1 Gal Available Tooling Schedule MaintenanceCleaning Protecting Beam Pivot Shaft Shearing Hold-Down Adjustment RodLubrication Support Frame Lubrication Fluid Capacity Hydraulic SystemFilling Hydraulic Reservoir To drain and re-fill the hydraulic reservoir Draining & Re-Filling HydraulicReservoir To align the beam Beam AlignmentMotor & Electrical ServiceTroubleshooting Operations To remove and replace the flat stock shearing dies Flat Stock Shearing DiesTo remove the angle iron shearing dies Angle Iron Shearing DiesTo remove and replace the bar stock shearing dies Bar Stock Shearing DiesDisconnect Machine from Power Shearing Table Alignment Hydraulic Fluid Pressure To reset the position of the limit ringsLimit Rings Electrical Panel Wiring Control Panel Wiring Electrical Panel Wiring Diagram Control Panel Wiring Diagram Limit switch wiring Electrical Components Wiring DiagramMotor wiring G0646/G0647 50/65 Ton Ironworker Motor Wiring DiagramHydraulic System Overview Parts Description G0646 Upper Front-Half Parts ListG0647 Upper Front-Half Parts List Half UpperG0646 Upper Rear-Half Parts List Description G0647 Upper Rear-Half Parts ListCabinet G0646 Cabinet G0647 Cabinet Notching Station Punching Station Extension Bar & Tools Label Placement Page Page Warranty and Returns