Southbend SB1023 manual Things Youll Need, Typical preparation process is as follows, For Lifting

Page 11

For Machines Mfg. Since 8/09

P R E P A R A T I O N

Model SB1023

PreparationREPARATIONOverview

The purpose of the preparation section is to help you prepare your machine for operation.

The typical preparation process is as follows:

1.Unpack the machine and inventory the contents of the box/crate.

2.Clean the machine and its components.

3.Identify an acceptable location for the machine and move it to that location.

4.Level the machine and either bolt it to the floor or place it on mounts.

5.Assemble the loose components and make any necessary adjustments or inspections to ensure the machine is ready for operation.

6.Connect the machine to the power source.

7.Test run the machine to make sure it functions properly and is ready for operation.

Things You'll Need

During the setup process, operation, and maintenance of your machine, you'll need the following items:

For Lifting

A forklift or other power lifting device rated for the weight of the machine.

Lifting Strap or Chain (rated for at least 1500 lbs.)

For Power Connection

A machine power connection that meets federal, state, and local electrical codes. An electrician may be required.

For Assembly

Assistant

Cotton Rags

Mineral Spirits

Safety Glasses

Wrench 14mm

Wrench 19mm

Oil Can with any General Machine Oil

-9-

Image 11
Contents 12 Surface Grinder Manual Feedback UpdatesCustomer Service Scope of ManualTable of Contents Capabilities FeaturesAbout This Machine Identification Identification12 Surface Grinder Machine SpecificationsModel SB1023 Main Specifications Operation Information Understanding Risks of Machinery Basic Machine SafetyF E T Y Additional Surface Grinder Safety Typical preparation process is as follows For Power ConnectionFor Assembly Things Youll NeedInventory UnpackingBasic steps for removing rust preventative Cleaning & ProtectingBefore cleaning, gather the following Location Leveling Lifting & MovingLeveling & Mounting To install the feet AssemblySB1023 220V Option Power ConnectionSB1023 110V Prewired To convert the Model SB1023 to operate on 220V powerTo test run your machine Inspections AdjustmentsTest Run Initial LubricationOperationPERATIONOverview Control panel ControlsGrade Wheel SelectionAbrasive Type Grit SizeTo remove and install a grinding wheel Removing & Installing Grinding WheelsRemove the grinding wheel, as shown in Figure To remove and reinstall the wheel and hub Removing & Installing Wheel & HubRemove the spindle bolt Figure To inspect a wheel for damage Wheel InspectionTo perform a ring test Ring TestWheel Dressing To balance the grinding wheel Wheel BalancingTo dress the grinding wheel I N T E N a N C E Grinder Operation Setup for a Typical Grinding OperationMagnetic Chuck Grinding Tips Using the Surface GrinderBi-weekly Maintenance ScheduleLubrication DailyLower column leadscrew Handwheel Backlash Adjustment Column & Table Gib AdjustmentLongng-term-termstoragestorage more than a year Machine StorageShort-term storage less than year Troubleshooting Troubleshooting Wiring Diagram Color KEY Lectrical Safety InstructionsMotor SB1023 Wiring DiagramMotor Wired for Description Motor & SpindleColumn See Table Parts List on Table Parts List Column Parts ListStand Machine Labels R R a N T Y #CRJB12368