Carrier PTV Wire Field Power Supply, Water Quality Guidelines, Metal Hose Minimum Bend Radii

Page 12

Table 2 — Water Quality Guidelines

CONDITION

HX

CLOSED RECIRCULATING†

OPEN LOOP AND RECIRCULATING WELL**

MATERIAL*

 

 

 

 

 

 

 

Scaling Potential — Primary Measurement

 

 

 

 

 

 

Above the given limits, scaling is likely to occur. Scaling indexes should be calculated using the limits below.

 

pH/Calcium

All

N/A

 

pH < 7.5 and Ca Hardness, <100 ppm

 

Hardness Method

 

 

 

 

 

 

 

 

 

Index Limits for Probable Scaling Situations (Operation outside these limits is not recommended.)

 

Scaling indexes should be calculated at 150 F for direct use and HWG applications, and at 90 F for indirect HX use. A monitoring plan should be

 

implemented.

 

 

 

 

 

 

 

Ryznar Stability Index

All

N/A

 

6.0 - 7.5

 

 

 

 

If >7.5 minimize steel pipe use.

 

 

 

 

 

 

Langelier Saturation Index

 

 

 

 

–0.5 to +0.5

 

 

All

N/A

 

If <–0.5 minimize steel pipe use.

 

 

 

 

Based upon 150 F HWG and direct well, 85 F indirect well HX.

Iron Fouling

 

 

 

 

 

 

 

Iron Fe2+ (Ferrous)

All

N/A

 

 

<0.2 ppm (Ferrous)

 

(Bacterial Iron Potential)

If Fe2+ (ferrous) >0.2 ppm with pH 6 - 8, O2<5 ppm check for iron bacteria.

 

 

Iron Fouling

All

N/A

 

 

<0.5 ppm of Oxygen

 

 

 

Above this level deposition will occur.

 

 

 

 

 

 

Corrosion Prevention††

 

 

 

 

 

 

 

pH

All

6 - 8.5

 

6 - 8.5

 

 

 

Monitor/treat as needed.

Minimize steel pipe below 7 and no open tanks with pH <8.

 

 

Hydrogen Sulfide (H2S)

 

 

 

 

<0.5 ppm

 

 

All

N/A

At H2S>0.2 ppm, avoid use of copper and cupronickel piping or HXs.

 

 

 

 

Rotten egg smell appears at 0.5 ppm level.

 

 

 

Copper alloy (bronze or brass) cast components are okay to <0.5 ppm.

Ammonia Ion as Hydroxide,

 

 

 

 

<0.5 ppm

 

Chloride, Nitrate and Sulfate

All

N/A

 

 

 

 

 

Compounds

 

 

 

 

 

 

 

Maximum Chloride Levels

 

 

Maximum allowable at maximum water temperature.

 

 

 

50 F (10 C)

 

75 F (24 C)

 

100 F (38 C)

 

Copper

N/A

<20 ppm

 

NR

 

NR

 

Cupronickel

N/A

<150 ppm

 

NR

 

NR

 

304 SS

N/A

<400 ppm

 

<250 ppm

 

<150 ppm

 

316 SS

N/A

<1000 ppm

 

<550 ppm

 

<375 ppm

 

Titanium

N/A

>1000 ppm

 

>550 ppm

 

>375 ppm

Erosion and Clogging

 

 

 

 

 

 

 

Particulate Size and Erosion

 

<10 ppm of particles and a

<10 ppm (<1 ppm “sandfree” for reinjection) of particles and a maximum velocity

 

 

maximum velocity of 6 fps.

 

All

of 6 fps. Filtered for maximum 800 micron size. Any particulate that is not

 

Filtered for maximum

 

 

removed can potentially clog components.

 

 

 

800 micron size.

 

 

 

 

 

 

 

 

Brackish

 

 

Use cupronickel heat exchanger when concentrations of calcium or sodium chlo-

 

All

N/A

ride are greater than 125 ppm are present. (Seawater is approximately 25,000

 

 

 

ppm.)

 

 

 

 

 

 

LEGEND

HWG —

Hot Water Generator

HX

Heat Exchanger

N/A

Design Limits Not Applicable Considering Recirculating

NR

Potable Water

Application Not Recommended

SSStainless Steel

*Heat exchanger materials considered are copper, cupronickel, 304 SS (stainless steel), 316 SS, titanium.

†Closed recirculating system is identified by a closed pressurized piping system.

**Recirculating open wells should observe the open recirculating design considerations.

††If the concentration of these corrosives exceeds the maximum allowable level, then the potential for serious corrosion problems exists.

Sulfides in the water quickly oxidize when exposed to air, requiring that no agitation occur as the sample is taken. Unless tested immediately at the site, the sample will require stabilization with a few drops of one Molar zinc acetate solution, allowing accurate sulfide determination up to 24 hours after sampling. A low pH and high alkalinity cause system problems, even when both values are within ranges shown. The term pH refers to the acid- ity, basicity, or neutrality of the water supply. Below 7.0, the water is consid- ered to be acidic. Above 7.0, water is considered to be basic. Neutral water contains a pH of 7.0.

To convert ppm to grains per gallon, divide by 17. Hardness in mg/l is equivalent to ppm.

Table 3 — Metal Hose Minimum Bend Radii

 

 

 

 

HOSE DIAMETER (in.)

MINIMUM BEND RADII (in.)

1/

21/

2

 

 

 

2

 

 

 

 

3/

4

 

 

 

 

4

 

 

 

 

 

1

51/2

 

 

 

 

 

 

 

 

 

 

Swivel

 

Brass

 

 

 

 

 

 

 

Brass

 

 

 

 

 

 

 

Rib Crimped

Fitting

 

Fitting

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Length

(2 ft Length Standard)

MPT

Fig. 14 — Supply/Return Hose Kit

Step 8 — Wire Field Power Supply

WARNING

To avoid possible injury or death due to electrical shock, open the power supply disconnect switch and secure it in an open position during installation.

CAUTION

Use only copper conductors for field-installed electrical wiring. Unit terminals are not designed to accept other types of conductors.

All field-installed wiring, including the electrical ground, MUST comply with the National Electrical Code (NEC) as well as applicable local codes. In addition, all field wiring must

12

Image 12
Contents Contents Safety ConsiderationsInstallation GeneralPhysical Data 50PTH, PTV, PTD026-072 Units 50PTH026-072 Dimensional Data Typical Installation 50PTH Unit Aux Electric Heat Disconnect50PTV Dimensional Data 50PTD Dimensional Data Side Discharge Back DischargeInstall Condensate Drain Mount the UnitRotate Move to SideHorizontal Unit Pitch Trap Condensate DrainTypical Ground-Water Piping Installation Drains field-installedWire Field Power Supply Water Quality GuidelinesMetal Hose Minimum Bend Radii 50PTH,PTV,PTD Electrical Data Alarm Relay Contacts Sensor, Water Coil Freeze ProtectionRVS TransECM BM ECM Alarm Relay Contacts Discharge Temp Switch Relay/Contactor Coil A50-8363 A50 8364LWT SPTA50-8571 Wshp Open ControlRnet Wiring Specifications Field-Supplied Sensors for Wshp Open ControllerSPT Sensors Wire Field Controls Rnet WiringWire Terminal A50-8443A50-8141 A50-7764tfA50-8441 A50-8442Cooling Settings Dehumidificaton Mode SettingsHeating Settings CFM Adjust SettingsBlower Performance Data PRE-START-UP Wshp Open Fan Only / Low Fan and Med Fan AirflowWshp Open High Fan Airflow Complete C Control Jumper Settings Deluxe D Control Jumper SettingsField Selectable Inputs DIP Switch Block S2 Accessory 1 Relay Options DIP Switch Block S2 Accessory 2 Relay OptionsHumidistat/Dehumidistat Logic Deluxe D DIP Switch Settings Units with Modulating Hot Water Reheat HWR OptionMode Input Output HWR Operating ModesSTART-UP Operating LimitsA50-8145 Water Out Operating Limits 50PTH, PTV, PTD UnitsUnit Start-Up Cooling Mode Unit Start-Up Heating ModeWater Temperature Change Through Heat Exchanger Suction Discharge Super Sub Water Air Temp Unit Start-Up with Wshp Open Controls A50-8444Unit 50PTH, PTV Water Temperature F GPM Coaxial Water Pressure DropPTD 026 038 049Approximate Fluid Volume gal Per 100 Ft of Pipe Antifreeze Percentages by VolumeOperation Units with Aquazone Complete C ControlUnits with Wshp Open Multiple Protocol Page Page Complete C Control LED Code Fault Descriptions LED Status Description of Operation Alarm RelayLED Fault Description Code Complete C and Deluxe D Board System TestAlarm Relay Aquazone Deluxe D Control LED IndicaService Troubleshooting Refrigerant ChargingAir Coil Fan Motor Removal Replacing the Wshp Open Controller’s Bat90.0 80.070.0 KOhm 60.0 50.0Page ECM Troubleshooting Fault Description SolutionECM Pin Connectors A50-8448ECM Troubleshooting Flow Diagram A50-8447Wshp Troubleshooting Fault Heating Cooling Possible Cause SolutionGood Practices Code 7 Auto Resetting No Fault Code ShownOver/Under Voltage Performance MonitorTemperature in Heating High Head PressureLow Suction Pressure Low Discharge AirAppendix a Wshp Open Screen Configuration Alarm StatusStatus SensorAppendix a Wshp Open Screen Configuration MaintenanceSystem Settings ConfigurationSchedule Appendix a Wshp Screen Open Configuration ServiceTest Configuration Service Point Name Password Editable Range Default LevelScreen Name Alarm Page Page Copyright 2010 Carrier Corporation 50PTH,PTV,PTD START-UP Checklist II. START-UPHeating Cycle Analysis Cooling Cycle AnalysisA50-8449 A50-8450