Carrier 50RTP03-20 specifications 50RTP03-06 Units, 50RTP08-20 Units

Page 26

a50-8555

Complete C

Complete C

50RTP03-06 UNITS

Complete C 1

Complete C 2

Complete C 1

Complete C 2

50RTP08-20 UNITS

Fig. 8 — Typical Control Wiring with Complete C and LON Controller

26

Image 26
Contents Contents Safety ConsiderationsInstallation GeneralPhysical Data Aquazone 50RTP03-20 Units In/Out FPT Drain 03,04 12.57 x DimensionsOutside Air Water Condensate In/Out FPT 18.95 x 11/4 10,12 11/250RTP14,20 Unit Dimensions 14,20 18.95 xReturn Air Transition Supply Air Transition Exterior 78.875 82.25 21.00 25.00 19.00 82.875 76.875 27.00 86.25Install Condensate Drain 50 RTPConnect Electrical Wiring Water Quality GuidelinesElectrical Data FLA Hacr50RTP03 Blower Performance Data 50RTP04 Blower Performance Data 50RTP05 Blower Performance Data 50RTP06 Blower Performance Data 50RTP08 Blower Performance Data 4000 38003900 4200 50RTP10 Blower Performance Data4100 4500 43004400 460050RTP12 Blower Performance Data 50RTP14 Blower Performance Data 62006800 64006600 700050RTP20 Blower Performance Data 10,000 Rpm 940 956 976 996 1016 1036 1056 1076 1092 Turns OpenECR See legend and notes on 50RTP03-06 Units 50RTP08-20 UnitsHpwr A50-8557 Typical Control Wiring with Deluxe D and LON Controller SizesAL1 J6J5J1 J8 A50 Units with Deluxe D and Wshp Open Multiple Protocol Controls Wshp Open Control Reversing Valve Fan 24Vac Hot 24Vac Com Connect Low Voltage WiringCompressor-Stage Deluxe DPRE-START-UP Complete C Control Jumper Settings SeeDeluxe D Control Jumper Settings See Field Selectable InputsDIP Switch Block S2 Accessory 1 Relay Options DIP Switch Block S2 Accessory 2 Relay OptionsSTART-UP Unit Start-Up Cooling ModeUnit Start-Up Heating Mode Operating LimitsUnit Start-Up with Wshp Open Controls BACview6 Display InterfacePage Units with Aquazone Complete C Control Antifreeze Percentages by VolumeOperation Units with Aquazone Deluxe D ControlPage Auxiliary Modulating Hot Water/Steam Heating Reheat System Test Complete C Control LED Code Fault Descriptions Service Aquazone Deluxe D Control LED IndicaReplacing the Wshp Open Controller’s Bat Refrigerant ChargingAir Coil Fan Motor Removal ’ to 4’Troubleshooting FP1 and FP2 Thermistor LocationReduced or no water flow TroubleshootingAir temperature out of range Overcharged with refrigerantUnit Does Not Operate Status Appendix a Wshp Open Screen ConfigurationAlarm Status SensorSystem Settings Appendix a Wshp Open Screen ConfigurationMaintenance ConfigurationSchedule Test Appendix a Wshp Screen Open ConfigurationService Configuration Service Electronically Commutated MotorAlarm Page Page Copyright 2010 Carrier Corporation 50RTP START-UP Checklist II. START-UPAlong Dotted Line Heating Cycle AnalysisCooling Cycle Analysis Catalog No Form 50RTP-1SI Pg CL-2 10A Replaces New