Carrier 50RTP03-20 Pre-Start-Up, Field Selectable Inputs, Complete C Control Jumper Settings See

Page 35

PRE-START-UP

System Checkout — When the installation is complete and the system is cleaned and flushed, follow the System Checkout procedure outlined below.

1.Voltage: Ensure that the voltage is within the utilization range specifications of the unit compressor and fan motor.

2.System Water Temperature: Ensure that the system water temperature is within an acceptable range to facili- tate start-up. (When conducting this check, also verify proper heating and cooling set points.)

3.System Water pH: Verify system water acidity (pH = 7.5 or 8.5). Proper pH promotes the longevity of hoses and heat exchangers.

4.System Flushing: Properly clean and flush the system periodically. Ensure that all supply and return hoses are connected end-to-end to facilitate system flushing and prevent fouling of the heat exchanger by system water. Water used in the system must be potable and should not contain dirt, piping slag, and chemical cleaning agents.

5.Closed-Type Cooling Tower or Open Tower with Heat Exchanger: Check equipment for proper temperature set points and operation.

6.Verify Balanced Water Flow Rate to Heat Pump.

7.Standby Pump: Verify that the standby pump is properly installed and in operating condition.

8.Access Panels: Assure that all access panels in the filter and fan section are securely closed.

9.Air Dampers: Assure that all air dampers are properly set.

10.System Controls: To ensure that no catastrophic system failures occur, verify that system controls are functioning and that the sequencing is correct.

11.Freeze Protection for Water System: Verify that freeze protection is provided for the building loop water system when outdoor design conditions require it. Inadequate freeze protection can lead to expensive tower and system piping repairs.

12.System Water Loop: Verify that all air is bled from the system. Air in the system impedes unit operation and causes corrosion in the system piping.

13.Unit Filters: To avoid system damage, check that the unit filter is clean.

14.Unit Fans: Manually rotate fans to assure free rotation. Ensure that fans are properly secured to the fan shaft. Do not oil fan motors on start-up since they are lubricated at the factory.

15.System Control Center: Examine the system control and alarm panel for proper installation and operation to ensure control of the temperature set-points for operation of the system’s heat rejector and boiler (when used).

16.Miscellaneous: Note any questionable aspects of the installation.

17.Air Coil: To obtain maximum performance, the air coil should be cleaned before starting the unit. A ten percent solution of dishwasher detergent and water is recom- mended for both sides of the coil. Rinse thoroughly with water.

FIELD SELECTABLE INPUTS

Jumpers and DIP (dual in-line package) switches on the control board are used to customize unit operation and can be configured in the field.

IMPORTANT: Jumpers and DIP switches should only be clipped when power to control board has been turned off.

Complete C Control Jumper Settings (See Fig. 6 and 7)

WATER COIL FREEZE PROTECTION (FP1) LIMIT SETTING — Select jumper 3, (JW3-FP1 Low Temp) to choose FP1 limit of 10 F or 30 F. To select 30 F as the limit, DO NOT clip the jumper. To select 10 F as the limit, clip the jumper.

AIR COIL FREEZE PROTECTION (FP2) LIMIT SET- TING — Select jumper 2 (JW2-FP2 Low Temp) to choose FP2 limit of 10 F or 30 F. To select 30 F as the limit, DO NOT clip the jumper. To select 10 F as the limit, clip the jumper.

ALARM RELAY SETTING — Select jumper 1 (JW1-AL2 Dry) for connecting alarm relay terminal (AL2) to 24 vac (R) or to remain as a dry contact (no connection). To connect AL2 to R, do not clip the jumper. To set as dry contact, clip the jumper.

Complete C Control DIP Switches — The Com- plete C control has 1 DIP switch block with two switches. See Fig. 6 and 7.

PERFORMANCE MONITOR (PM) — DIP switch 1 will enable or disable this feature. To enable the PM, set the switch to ON. To disable the PM, set the switch to OFF.

STAGE 2 — DIP switch 2 will enable or disable compressor delay. Set DIP switch to OFF for stage 2 in which the compres- sor will have a 3-second delay before energizing.

NOTE: The alarm relay will not cycle during Test mode if switch is set to OFF, stage 2.

Deluxe D Control Jumper Settings (See Fig. 9 and 10)

WATER COIL FREEZE PROTECTION (FP1) LIMIT SETTING — Select jumper 3, (JW3-FP1 Low Temp) to choose FP1 limit of 10 F or 30 F. To select 30 F as the limit, DO NOT clip the jumper. To select 10 F as the limit, clip the jumper.

AIR COIL FREEZE PROTECTION (FP2) LIMIT SET- TING — Select jumper 2 (JW2-FP2 Low Temp) to choose FP2 limit of 10 F or 30 F. To select 30 F as the limit, DO NOT clip the jumper. To select 10 F as the limit (for anti-freeze sys- tems), clip the jumper.

ALARM RELAY SETTING — Select jumper 4 (JW4-AL2 Dry) for connecting alarm relay terminal (AL2) to 24 vac (R) or to remain as a dry contact (no connection). To connect AL2 to R, do not clip the jumper. To set as dry contact, clip the jumper.

LOW PRESSURE SETTING — The Deluxe D control can be configured for Low Pressure Setting (LP). Select jumper 1 (JW1-LP Norm Open) for choosing between low pressure in- put normally opened or closed. To configure for normally closed operation, do not clip the jumper. To configure for nor- mally open operation, clip the jumper.

Deluxe D Control DIP Switches — The Deluxe D control has 2 DIP switch blocks. Each DIP switch block has 8 switches and is labeled either S1 or S2 on the circuit board.

DIP SWITCH BLOCK 1 (S1) — This set of switches offers the following options for Deluxe D control configuration: Performance Monitor (PM) — Set switch 1 to enable or dis- able performance monitor. To enable the PM, set the switch to ON. To disable the PM, set the switch to OFF.

Compressor Relay Staging Operation — Switch 2 will en- able or disable compressor relay staging operation. The com- pressor relay can be set to turn on with stage 1 or stage 2 call

35

Image 35
Contents Safety Considerations ContentsGeneral InstallationPhysical Data Aquazone 50RTP03-20 Units In/Out FPT Drain 03,04 12.57 x DimensionsOutside Air Water Condensate 18.95 x 11/4 10,12 11/2 In/Out FPT14,20 18.95 x 50RTP14,20 Unit Dimensions78.875 82.25 21.00 25.00 19.00 82.875 76.875 27.00 86.25 Return Air Transition Supply Air Transition Exterior50 RTP Install Condensate DrainWater Quality Guidelines Connect Electrical WiringFLA Hacr Electrical Data50RTP03 Blower Performance Data 50RTP04 Blower Performance Data 50RTP05 Blower Performance Data 50RTP06 Blower Performance Data 50RTP08 Blower Performance Data 4000 38003900 4200 50RTP10 Blower Performance Data4100 4600 43004400 450050RTP12 Blower Performance Data 6200 50RTP14 Blower Performance Data7000 64006600 680050RTP20 Blower Performance Data Rpm 940 956 976 996 1016 1036 1056 1076 1092 Turns Open 10,000ECR See legend and notes on 50RTP08-20 Units 50RTP03-06 UnitsHpwr A50-8557 Sizes Typical Control Wiring with Deluxe D and LON ControllerAL1 J6J5J1 J8 A50 Units with Deluxe D and Wshp Open Multiple Protocol Controls Wshp Open Control Deluxe D Connect Low Voltage WiringCompressor-Stage Reversing Valve Fan 24Vac Hot 24Vac ComField Selectable Inputs Complete C Control Jumper Settings SeeDeluxe D Control Jumper Settings See PRE-START-UPDIP Switch Block S2 Accessory 2 Relay Options DIP Switch Block S2 Accessory 1 Relay OptionsOperating Limits Unit Start-Up Cooling ModeUnit Start-Up Heating Mode START-UPBACview6 Display Interface Unit Start-Up with Wshp Open ControlsPage Units with Aquazone Deluxe D Control Antifreeze Percentages by VolumeOperation Units with Aquazone Complete C ControlPage Auxiliary Modulating Hot Water/Steam Heating Reheat System Test Complete C Control LED Code Fault Descriptions Aquazone Deluxe D Control LED Indica Service’ to 4’ Refrigerant ChargingAir Coil Fan Motor Removal Replacing the Wshp Open Controller’s BatFP1 and FP2 Thermistor Location TroubleshootingOvercharged with refrigerant TroubleshootingAir temperature out of range Reduced or no water flowUnit Does Not Operate Sensor Appendix a Wshp Open Screen ConfigurationAlarm Status StatusConfiguration Appendix a Wshp Open Screen ConfigurationMaintenance System SettingsSchedule Test Appendix a Wshp Screen Open ConfigurationService Electronically Commutated Motor Configuration ServiceAlarm Page Page Copyright 2010 Carrier Corporation II. START-UP 50RTP START-UP ChecklistCatalog No Form 50RTP-1SI Pg CL-2 10A Replaces New Heating Cycle AnalysisCooling Cycle Analysis Along Dotted Line