Carrier 50RTP03-20 specifications DIP Switch Block S2 Accessory 1 Relay Options

Page 36

from the thermostat. This setting is used with dual stage units (units with 2 compressors and 2 Deluxe D controls) or in mas- ter/slave applications. In master/slave applications, each com- pressor and fan will stage according to its switch 2 setting. If switch is set to stage 2, the compressor will have a 3-second de- lay before energizing during stage 2 demand.

NOTE: If DIP switch is set for stage 2, the alarm relay will not cycle during Test mode.

Heating/Cooling Thermostat Type — Switch 3 provides selec- tion of thermostat type. Heat pump or heat/cool thermostats can be selected. Select OFF for heat/cool thermostats. When in heat/cool mode, Y1 is used for cooling stage 1, Y2 is used for cooling stage 2, W1 is used for heating stage 1 and O/W2 is used for heating stage 2. Select ON for heat pump applications. In heat pump mode, Y1 used is for compressor stage 1, Y2 is used for compressor stage 2, W1 is used for heating stage 3 or emergency heat, and O/W2 is used for RV (heating or cooling) depending upon switch 4 setting.

O/B Thermostat Type — Switch 4 provides selection for heat pump O/B thermostats. O is cooling output. B is heating out- put. Select ON for heat pumps with O output. Select OFF for heat pumps with B output.

Dehumidification Fan Mode — Switch 5 provides selection of normal or dehumidification fan mode. Select OFF for dehu- midification mode. The fan speed relay will remain OFF dur- ing cooling stage 2. Select ON for normal mode. The fan speed relay will turn on during cooling stage 2 in normal mode.

Switch 6 — Not used.

Boilerless Operation — Switch 7 provides selection of boil- erless operation and works in conjunction with switch 8. In boilerless operation mode, only the compressor is used for heating when FP1 is above the boilerless changeover tempera- ture set by switch 8 below. Select ON for normal operation or select OFF for boilerless operation.

Boilerless Changeover Temperature — Switch 8 on S1 pro- vides selection of boilerless changeover temperature set point. Select OFF for set point of 50 F or select ON for set point of 40 F.

If switch 8 is set for 50 F, then the compressor will be used for heating as long as the FP1 is above 50 F. The compressor will not be used for heating when the FP1 is below 50 F and the compressor will operates in emergency heat mode, staging on EH1 and EH2 to provide heat. If a thermal switch is being used instead of the FP1 thermistor, only the compressor will be used for heating mode when the FP1 terminals are closed. If the FP1 terminals are open, the compressor is not used and the control goes into emergency heat mode.

DIP SWITCH BLOCK 2 (S2) — This set of DIP switches is used to configure accessory relay options.

Switches 1 to 3 — These DIP switches provide selection of Accessory 1 relay options. See Table 13 for DIP switch combinations.

Switches 4 to 6 — These DIP switches provide selection of Accessory 2 relay options. See Table 14 for DIP switch combinations.

Auto Dehumidification Mode or High Fan Mode — Switch 7 provides selection of auto dehumidification fan mode or high fan mode. In auto dehumidification fan mode the fan speed re- lay will remain off during cooling stage 2 if terminal H is ac- tive. In high fan mode, the fan enable and fan speed relays will turn on when terminal H is active. Set the switch to ON for auto dehumidification fan mode or to OFF for high fan mode.

Switch 8 — Not used.

Table 13 — DIP Switch Block S2 —

Accessory 1 Relay Options

ACCESSORY 1

DIP SWITCH POSITION

RELAY OPTIONS

1

2

3

Cycle with Fan

On

On

On

Digital NSB

Off

On

On

Water Valve — Slow Opening

On

Off

On

OAD

On

On

Off

LEGEND

 

 

 

NSB — Night Setback OAD — Outside Air Damper

NOTE: All other DIP switch combinations are invalid.

Table 14 — DIP Switch Block S2 —

Accessory 2 Relay Options

ACCESSORY 2

DIP SWITCH POSITION

RELAY OPTIONS

4

5

6

Cycle with Fan

On

On

On

Digital NSB

Off

On

On

Water Valve — Slow Opening

On

Off

On

OAD

On

On

Off

LEGEND

 

 

 

NSB — Night Setback

OAD — Outside Air Damper

NOTE: All other switch combinations are invalid.

Deluxe D Control Accessory Relay Configura- tions — The following accessory relay settings are applica- ble for both Deluxe D controls only:

CYCLE WITH FAN — In this configuration, the relay will be ON any time the Fan Enable relay is on.

CYCLE WITH COMPRESSOR — In this configuration, the relay will be ON any time the Compressor relay is on. DIGITAL NIGHT SET BACK (NSB) — In this configura- tion, the relay will be ON if the NSB input is connected to ground C.

NOTE: If there are no relays configured for digital NSB, then the NSB and OVR inputs are automatically configured for mechanical operation.

MECHANICAL NIGHT SET BACK — When NSB input is connected to ground C, all thermostat inputs are ignored. A thermostat set back heating call will then be connected to the OVR input. If OVR input becomes active, then the Deluxe D control will enter Night Low Limit (NLL) staged heating mode. The NLL staged heating mode will then provide heating during the NSB period.

Water Valve (Slow Opening) — If relay is config- ured for Water Valve (slow opening), the relay will start 60 sec- onds prior to starting compressor relay.

Outside-Air Damper (OAD) — If relay is configured for OAD, the relay will normally be ON any time the Fan Enable relay is energized. The relay will not start for 30 min- utes following a return to normal mode from NSB, when NSB is no longer connected to ground C. After 30 minutes, the relay will start if the Fan Enable is set to ON.

CAUTION

To avoid equipment damage, DO NOT leave system filled in a building without heat during the winter unless anti- freeze is added to system water. Condenser coils never fully drain by themselves and will freeze unless winterized with antifreeze.

36

Image 36
Contents Contents Safety ConsiderationsInstallation GeneralPhysical Data Aquazone 50RTP03-20 Units Dimensions Outside Air Water CondensateIn/Out FPT Drain 03,04 12.57 x In/Out FPT 18.95 x 11/4 10,12 11/250RTP14,20 Unit Dimensions 14,20 18.95 xReturn Air Transition Supply Air Transition Exterior 78.875 82.25 21.00 25.00 19.00 82.875 76.875 27.00 86.25Install Condensate Drain 50 RTPConnect Electrical Wiring Water Quality GuidelinesElectrical Data FLA Hacr50RTP03 Blower Performance Data 50RTP04 Blower Performance Data 50RTP05 Blower Performance Data 50RTP06 Blower Performance Data 50RTP08 Blower Performance Data 3800 39004000 50RTP10 Blower Performance Data 41004200 4300 44004500 460050RTP12 Blower Performance Data 50RTP14 Blower Performance Data 62006400 66006800 700050RTP20 Blower Performance Data 10,000 Rpm 940 956 976 996 1016 1036 1056 1076 1092 Turns OpenECR See legend and notes on 50RTP03-06 Units 50RTP08-20 UnitsHpwr A50-8557 Typical Control Wiring with Deluxe D and LON Controller SizesJ6J5 J1 J8AL1 A50 Units with Deluxe D and Wshp Open Multiple Protocol Controls Wshp Open Control Connect Low Voltage Wiring Compressor-StageReversing Valve Fan 24Vac Hot 24Vac Com Deluxe DComplete C Control Jumper Settings See Deluxe D Control Jumper Settings SeePRE-START-UP Field Selectable InputsDIP Switch Block S2 Accessory 1 Relay Options DIP Switch Block S2 Accessory 2 Relay OptionsUnit Start-Up Cooling Mode Unit Start-Up Heating ModeSTART-UP Operating LimitsUnit Start-Up with Wshp Open Controls BACview6 Display InterfacePage Antifreeze Percentages by Volume OperationUnits with Aquazone Complete C Control Units with Aquazone Deluxe D ControlPage Auxiliary Modulating Hot Water/Steam Heating Reheat System Test Complete C Control LED Code Fault Descriptions Service Aquazone Deluxe D Control LED IndicaRefrigerant Charging Air Coil Fan Motor RemovalReplacing the Wshp Open Controller’s Bat ’ to 4’Troubleshooting FP1 and FP2 Thermistor LocationTroubleshooting Air temperature out of rangeReduced or no water flow Overcharged with refrigerantUnit Does Not Operate Appendix a Wshp Open Screen Configuration Alarm StatusStatus SensorAppendix a Wshp Open Screen Configuration MaintenanceSystem Settings ConfigurationSchedule Appendix a Wshp Screen Open Configuration ServiceTest Configuration Service Electronically Commutated MotorAlarm Page Page Copyright 2010 Carrier Corporation 50RTP START-UP Checklist II. START-UPHeating Cycle Analysis Cooling Cycle AnalysisAlong Dotted Line Catalog No Form 50RTP-1SI Pg CL-2 10A Replaces New