Step 4 — Mount the Unit — For proper operation, units must be mounted on a roof curb as shown in Fig. 5. Roof curn dimensional data is shown in Fig. 4. Follow these guide- lines when installing the roof curb:

1.Set unit on curb.

2.Align unit so that its return and supply air direction match the return and supply air opening in the roof curb frame.

3.Run both the return and supply loop piping, as well as the electrical supply line, through the pipe chase provided in the curb.

50 RTP

UNIT

FLASHING

GASKET

ROOF

CURB

Fig. 5 — 50RTP Curb Installation

Step 5 — Install Condensate Drain

1.Install a condensate trap at each unit with the top of the trap positioned below the unit condensate drain connection.

2.Design the length of the trap (water seal) based on the amount of positive or negative pressure on the drain pan. As a rule, 1 in. of trap is required for each inch of nega- tive pressure on the unit.

Note that condensate is allowed to drain onto the roof.

Step 6 — Make Piping Connections — Depend- ing on the application, there are 3 types of WSHP piping sys- tems to choose from: water loop, ground-water and ground loop. Refer to Piping Section of Carrier System Design Manual for additional information.

All WSHP units use low temperature soldered female pipe thread fittings for water connections to prevent annealing and out-of-round leak problems which are typically associated with high temperature brazed connections. Refer to Table 1 for con- nection sizes. When making piping connections, consider the following:

Use a backup wrench when making screw connections to unit to prevent internal damage to piping.

Insulation may be required on piping to avoid condensa- tion in the case where fluid in loop piping operates at temperatures below dew point of adjacent air.

Piping systems that contain steel pipes or fittings may be subject to galvanic corrosion. Dielectric fittings may be used to isolate the steel parts of the system to avoid galvanic corrosion.

WATER LOOP APPLICATIONS — Water loop applications usually include a number of units plumbed to a common pip- ing system. Maintenance to any of these units can introduce air into the piping system. Therefore, air elimination equipment comprises a major portion of the mechanical room plumbing.

The flow rate is usually set between 2.25 and 3 gpm per ton of cooling capacity. For proper maintenance and servicing, pressure-temperature (P/T) ports are necessary for temperature and flow verification.

In addition to complying with any applicable codes, consid- er the following for system piping:

Piping systems utilizing water temperatures below 50 F require 1/2-in. closed cell insulation on all piping surfaces to eliminate condensation.

All plastic to metal threaded fittings should be avoided due to the potential to leak. Use a flange fitted substitute.

Teflon tape thread sealant is recommended to minimize internal fouling of the heat exchanger.

Use backup wrench. Do not overtighten connections.

Route piping to avoid service access areas to unit.

The piping system should be flushed prior to operation to remove dirt and foreign materials from the system.

GROUND-WATER APPLICATIONS — In addition to com- plying with any applicable codes, consider the following for system piping:

Install shut-off valves for servicing.

Install pressure-temperature plugs to measure flow and temperature.

Boiler drains and other valves should be connected using a “T” connector to allow acid flushing for the heat exchanger.

Do not overtighten connections.

Route piping to avoid service access areas to unit.

Use PVC SCH80 or copper piping material.

NOTE: PVC SCH40 should not be used due to system high pressure and temperature extremes.

Water Supply and Quantity — Check water supply. Water supply should be plentiful and of good quality. See Table 2 for water quality guidelines.

IMPORTANT: Failure to comply with the above required water quality and quantity limitations and the closed- system application design requirements may cause damage to the tube-in-tube heat exchanger that is not the responsi- bility of the manufacturer.

In all applications, the quality of the water circulated through the heat exchanger must fall within the ranges listed in the Water Quality Guidelines table. Consult a local water treat- ment firm, independent testing facility, or local water authority for specific recommendations to maintain water quality within the published limits.

GROUND-LOOP APPLICATIONS — Temperatures between 25 to 110 F and a cooling capacity of 2.25 to 3 gpm of flow per ton is recommended. In addition to complying with any appli- cable codes, consider the following for system piping:

Piping materials should be limited to only polyethylene fusion in the buried sections of the loop.

Galvanized or steel fittings should not be used at any time due to corrosion.

All plastic to metal threaded fittings should be avoided due to the potential to leak. Use a flange fitted substitute.

Do not overtighten connections.

Route piping to avoid service access areas to unit.

Pressure-temperature (P/T) plugs should be used to mea- sure flow of pressure drop.

8

Image 8
Contents Contents Safety ConsiderationsInstallation GeneralPhysical Data Aquazone 50RTP03-20 Units In/Out FPT Drain 03,04 12.57 x DimensionsOutside Air Water Condensate In/Out FPT 18.95 x 11/4 10,12 11/250RTP14,20 Unit Dimensions 14,20 18.95 xReturn Air Transition Supply Air Transition Exterior 78.875 82.25 21.00 25.00 19.00 82.875 76.875 27.00 86.25Install Condensate Drain 50 RTPConnect Electrical Wiring Water Quality GuidelinesElectrical Data FLA Hacr50RTP03 Blower Performance Data 50RTP04 Blower Performance Data 50RTP05 Blower Performance Data 50RTP06 Blower Performance Data 50RTP08 Blower Performance Data 4000 38003900 4200 50RTP10 Blower Performance Data4100 4300 44004500 460050RTP12 Blower Performance Data 50RTP14 Blower Performance Data 62006400 66006800 700050RTP20 Blower Performance Data 10,000 Rpm 940 956 976 996 1016 1036 1056 1076 1092 Turns OpenECR See legend and notes on 50RTP03-06 Units 50RTP08-20 UnitsHpwr A50-8557 Typical Control Wiring with Deluxe D and LON Controller SizesAL1 J6J5J1 J8 A50 Units with Deluxe D and Wshp Open Multiple Protocol Controls Wshp Open Control Connect Low Voltage Wiring Compressor-StageReversing Valve Fan 24Vac Hot 24Vac Com Deluxe DComplete C Control Jumper Settings See Deluxe D Control Jumper Settings SeePRE-START-UP Field Selectable InputsDIP Switch Block S2 Accessory 1 Relay Options DIP Switch Block S2 Accessory 2 Relay OptionsUnit Start-Up Cooling Mode Unit Start-Up Heating ModeSTART-UP Operating LimitsUnit Start-Up with Wshp Open Controls BACview6 Display InterfacePage Antifreeze Percentages by Volume OperationUnits with Aquazone Complete C Control Units with Aquazone Deluxe D ControlPage Auxiliary Modulating Hot Water/Steam Heating Reheat System Test Complete C Control LED Code Fault Descriptions Service Aquazone Deluxe D Control LED IndicaRefrigerant Charging Air Coil Fan Motor RemovalReplacing the Wshp Open Controller’s Bat ’ to 4’Troubleshooting FP1 and FP2 Thermistor LocationTroubleshooting Air temperature out of rangeReduced or no water flow Overcharged with refrigerantUnit Does Not Operate Appendix a Wshp Open Screen Configuration Alarm StatusStatus SensorAppendix a Wshp Open Screen Configuration MaintenanceSystem Settings ConfigurationSchedule Test Appendix a Wshp Screen Open ConfigurationService Configuration Service Electronically Commutated MotorAlarm Page Page Copyright 2010 Carrier Corporation 50RTP START-UP Checklist II. START-UPHeating Cycle Analysis Cooling Cycle AnalysisAlong Dotted Line Catalog No Form 50RTP-1SI Pg CL-2 10A Replaces New