Carrier 50VQP084-300 specifications General, Installation

Page 2

Follow all safety codes. Wear safety glasses and work gloves. Use quenching cloth for brazing operations. Have fire extinguisher available. Read these instructions thoroughly and follow all warnings or cautions attached to the unit. Consult local building codes and the National Electrical Code (NEC, U.S.A.) for special installation requirements.

Understand the signal words — DANGER, WARNING, and CAUTION. DANGER identifies the most serious hazards which will result in severe personal injury or death. WARN- ING signifies hazards that could result in personal injury or death. CAUTION is used to identify unsafe practices, which would result in minor personal injury or product and property damage.

Recognize safety information. This is the safety-alert symbol ( ). When you see this symbol on the unit and in instructions or manuals, be alert to the potential for personal injury.

WARNING

Electrical shock can cause personal injury or death. Before installing or servicing system, always turn off main power to system. There may be more than one disconnect switch. Turn off accessory heater power if applicable.

GENERAL

This Installation and Start-Up Instructions literature is for Aquazone™ water source heat pump systems.

Water source heat pumps (WSHPs) are single-package ver- tically mounted units with electronic controls designed for year-round cooling and heating.

IMPORTANT: The installation of water source heat pump units and all associated components, parts, and accessories which make up the installation shall be in accordance with the regulations of ALL authorities having jurisdiction and MUST conform to all applicable codes. It is the responsi- bility of the installing contractor to determine and comply with ALL applicable codes and regulations.

INSTALLATION

Step 1 — Check Jobsite — Installation, operation and maintenance instructions are provided with each unit. Before unit start-up, read all manuals and become familiar with the unit and its operation. Thoroughly check out the system before operation. Complete the inspections and instructions listed below to prepare a unit for installation. See Table 1 for unit physical data.

Vertical units are designed for indoor installation only and are typically installed in a floor-level closet or a small mechan- ical room. Refer to Fig. 1 for an example of a typical vertical installation. See Fig. 2 and 3 for overall unit dimensions.

CAUTION

To avoid equipment damage, do not use these units as a source of heating or cooling during the construction process. The mechanical components and filters used in these units quickly becomes clogged with construction dirt and debris which may cause system damage.

Step 2 — Check Unit — Upon receipt of shipment at the jobsite, carefully check the shipment against the bill of lading. Make sure all units have been received. Inspect the car- ton or crating of each unit, and inspect each unit for damage. Ensure the shipping company makes proper notation of any shortages or damage on all copies of the freight bill. Concealed damage not discovered during unloading must be reported to the shipping company within 15 days of receipt of shipment.

NOTE: It is the responsibility of the purchaser to file all necessary claims with the shipping company.

1.Verify unit is correct model for entering water tempera- ture of job.

2.Be sure that the location chosen for unit installation pro- vides ambient temperatures maintained above freezing. Well water applications are especially susceptible to freezing.

3.Be sure the installation location is isolated from sleeping areas, private offices and other acoustically sensitive spaces.

NOTE: A sound control accessory package may be used to help eliminate sound in sensitive spaces.

4.Check local codes to be sure a secondary drain pan is not required under the unit.

5.Be sure unit is mounted at a height sufficient to provide an adequate slope of the condensate lines. If an appropri- ate slope cannot be achieved, a field-supplied condensate pump may be required.

6.Provide sufficient space for duct connection.

7.Provide adequate clearance for filter replacement and drain pan cleaning. Do not allow piping, conduit, etc. to block filter access.

8.Provide sufficient access to allow maintenance and servicing of the fan and fan motor, compressor and coils. Removal of the entire unit from the closet should not be necessary.

9.Provide an unobstructed path to the unit within the closet or mechanical room. Space should be sufficient to allow removal of unit if necessary.

10.Provide ready access to water valves and fittings, and screwdriver access to unit side panels, discharge collar, and all electrical connections.

11.Where access to side panels is limited, pre-removal of the control box side mounting screws may be necessary for future servicing.

STORAGE — If the equipment is not needed for immediate installation upon its arrival at the jobsite, it should be left in its shipping carton and stored in a clean, dry area of the building or in a warehouse. Units must be stored in an upright position at all times. If carton stacking is necessary, stack units a maxi- mum of 3 high. Do not remove any equipment from its ship- ping package until it is needed for installation.

2

Image 2
Contents Contents Safety ConsiderationsInstallation General442 50VQP Unit Physical Data406 78250VQP084-150 Unit Dimensions A50-843650VQP168-300 Unit Dimensions A50-8437A50-8468 A50-8466A50-8467 A50-8471 A50-8469A50-8470 A50-8472A50-8478 A50-8476A50-8477 A50-8479A50-8483 A50-8482A50-8485 A50-8484A50-8486 Trap Condensate DrainField Power Supply Wiring Water Quality Guidelines A50-8438 50VQP084-168 Unit with Complete C Control TypicalA50-8439 50VQP084-168 with Deluxe D Control TypicalJ1 J8 AL1J6J5 50VQP Unit Electrical Data Dual Point Power Unit 50VQP Unit Electrical Data Standard UnitA50- 6268tf.tif Field Control WiringPRE-START-UP A50-8441Page 50VQP084 Blower Performance Data 50VQP096 Blower Performance Data 441 478 513 549 581 614 644 672 703 730 759 412 455 492 526 563 595 628 658 687 718 745421 459 499 533 569 600 633 663 691 722 749 456 495 529 561 595 625 656 685 712 741 76750VQP120 Blower Performance Data 544 575 605 633 661 691 717 742 767 794 818 842 867 890 511 544 578 608 637 668 695 722 748 776 800 825 849 874 897526 561 592 621 649 679 706 732 758 785 809 833 857 882 555 589 618 646 676 702 728 753 779 803 827 850 875 89850VQP150 Blower Performance Data 605 637 666 697 727 755 783 809 835 858 882 905 928 951 973 581 613 646 678 706 735 763 791 817 842 867 889 912 935 958598 623 656 687 715 744 772 799 825 850 872 896 919 942 963 618 647 678 708 738 766 793 819 844 867 891 914 937 959 98050VQP168 Blower Performance Data 50VQP192 Blower Performance Data BkW 3020.8 Sheave/Mtr 50VQP240 Blower Performance Data 605 633 660 689 714 739 763 790 813 836 858 882 904 50VQP300 Blower Performance Data 568 602 633 666 697 726 755 782 806 832 857 881 904 538 574 609 640 673 703 733 761 788 812 838 863 888 912553 588 620 653 685 715 744 771 796 822 847 872 896 581 613 646 678 706 735 763 791 817 842 867 889Field Selectable Inputs Complete C Control Jumper Settings See FigDeluxe D Control Jumper Settings See Fig START-UP DIP Switch Block S2 Accessory 1 Relay OptionsDIP Switch Block S2 Accessory 2 Relay Options Operating LimitsWater Temperature Change Through Heat Exchanger Unit Start-Up Cooling ModeUnit Start-Up Heating Mode 50VQP Unit Operating LimitsOperation Approximate Fluid Volume L Per 30 M of PipeAntifreeze Percentages by Volume Coaxial Water Pressure DropComplete C and Deluxe D Board System Test Units with Aquazone Complete C ControlUnits with Aquazone Deluxe D Control Complete C Control LED Code Fault Descriptions Service Aquazone Deluxe D Control LED IndicaAir Coil Fan Motor Removal TroubleshootingRefrigerant Charging A50-8163 FP1 and FP2 Thermistor LocationTroubleshooting Unit Does Not Operate Page Page Copyright 2010 Carrier Corporation Catalog No Form 50VQP-C1SI 11-10Book Catalog No 50VQP START-UP ChecklistII. START-UP Form 62AQ-1SI Pg CL-1 Replaces New TabHeating Cycle Analysis Cooling Cycle Analysis